NOAA 24-hr D 10 YR-C Rainfall=5.38" Printed 12/19/2025
Analysis - Proposed Conditions NO Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions L
Hydrograph for Pond 6P: BIORENTION BASIN 2A
Time (hours)Inflow (cfs)Storage (cubic-feet)Elevation (feet)Primary (cfs)
0.000.00094.300.00
2.000.00094.300.00
4.000.00094.300.00
6.000.00094.300.00
8.000.00094.300.00
10.000.00094.300.00
12.000.00094.300.00
14.000.025994.900.02
16.000.015794.880.01
18.000.015594.870.01
20.000.015594.860.01
22.000.015494.860.01
24.000.015494.860.01
26.000.004894.810.00
28.000.004794.800.00
30.000.004794.800.00
32.000.004794.800.00
34.000.004794.800.00
36.000.004794.800.00
38.000.004794.800.00
40.000.004794.800.00
42.000.004794.800.00
44.000.004794.800.00
46.000.004794.800.00
48.000.004794.800.00
50.000.004794.800.00
52.000.004794.800.00
54.000.004794.800.00
56.000.004794.800.00
58.000.004794.800.00
60.000.004794.800.00
62.000.004794.800.00
64.000.004794.800.00
66.000.004794.800.00
68.000.004794.800.00
70.000.004794.800.00
72.000.004794.800.00
Page 182