NOAA 24-hr D 10 YR-C Rainfall=5.38" Printed 12/19/2025 ons LLC Page 179
Analysis - Proposed Conditions NOAA Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC
Summary for Pond 6P: BIORENTION BASIN 2A
Inflow Area = 18,731 sf, 0.00% Impervious, Inflow Depth = 0.28" for 10 YR-C event Inflow = 0.02 cfs @ 12.87 hrs, Volume= 442 cf Outflow = 0.02 cfs @ 13.41 hrs, Volume= 396 cf, Atten= 15%, Lag= 32.2 min Primary = 0.02 cfs @ 13.41 hrs, Volume= 396 cf Routed to Pond 33P : INFILTRATION BASIN 2 Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 94.91' @ 13.41 hrs Surf.Area= 137 sf Storage= 60 cf Plug-Flow detention time= 91.4 min calculated for 396 cf (89% of inflow) Center-of-Mass det. time= 47.6 min ( 1,065.9 - 1,018.3 )
VolumeInvertAvail.StorageStorage Description
#194.30'307 cfCustom Stage Data (Prismatic)Listed below (Recalc)
Elevation (feet)Surf.Area (sq-ft)Inc.Store (cubic-feet)Cum.Store (cubic-feet)
94.306300
95.001487474
96.00319234307
DeviceRoutingInvertOutlet Devices
#1Device 394.80'2.5" Vert. Orifice C= 0.600 Limited to weir flow at low heads
#2Device 395.50'48.0" x 48.0" Horiz. Grate C= 0.600 Limited to weir flow at low heads
#3Primary91.80'12.0" Round Culvert L= 30.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 91.80' / 91.65' S= 0.0050 ' /' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 0.79 sf
Primary OutFlow Max=0.02 cfs @ 13.41 hrs HW=94.91' TW=92.66' (Dynamic Tailwater) 3=Culvert (Passes 0.02 cfs of 6.67 cfs potential flow) 1=Orifice (Orifice Controls 0.02 cfs @ 1.11 fps) 2=Grate ( Controls 0.00 cfs)