NOAA 24-hr D 2 YR-F Rainfall=4.04" Printed 12/19/2025 Page 142
Analysis - Proposed Conditions Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC
Stage-Discharge for Pond 42P: BIORENTION BASIN 3A
Elevation (feet)Primary (cfs)Elevation (feet)Primary (cfs)Elevation (feet)Primary (cfs)
93.300.0093.820.0094.340.11
93.310.0093.830.0094.350.11
93.320.0093.840.0094.360.11
93.330.0093.850.0094.370.11
93.340.0093.860.0194.380.11
93.350.0093.870.0194.390.11
93.360.0093.880.0194.400.12
93.370.0093.890.0194.410.12
93.380.0093.900.0294.420.12
93.390.0093.910.0294.430.12
93.400.0093.920.0294.440.12
93.410.0093.930.0394.450.12
93.420.0093.940.0394.460.12
93.430.0093.950.0394.470.12
93.440.0093.960.0494.480.12
93.450.0093.970.0494.490.13
93.460.0093.980.0594.500.13
93.470.0093.990.0594.510.18
93.480.0094.000.0594.520.28
93.490.0094.010.0594.530.40
93.500.0094.020.0694.540.55
93.510.0094.030.0694.550.72
93.520.0094.040.0694.560.90
93.530.0094.050.0694.571.10
93.540.0094.060.0694.581.32
93.550.0094.070.0794.591.55
93.560.0094.080.0794.601.79
93.570.0094.090.0794.612.05
93.580.0094.100.0794.622.31
93.590.0094.110.0794.632.59
93.600.0094.120.0894.642.88
93.610.0094.130.0894.653.18
93.620.0094.140.0894.663.49
93.630.0094.150.0894.673.81
93.640.0094.160.0894.684.14
93.650.0094.170.0894.694.48
93.660.0094.180.0994.704.83
93.670.0094.190.0994.715.18
93.680.0094.200.0994.725.55
93.690.0094.210.0994.735.92
93.700.0094.220.0994.746.30
93.710.0094.230.0994.756.69
93.720.0094.240.1094.767.09
93.730.0094.250.1094.777.49
93.740.0094.260.1094.787.91
93.750.0094.270.1094.798.33
93.760.0094.280.1094.808.75
93.770.0094.290.1094.818.86
93.780.0094.300.1094.828.87
93.790.0094.310.1094.838.88
93.800.0094.320.1194.848.89
93.810.0094.330.1194.858.91
Elevation (feet)Primary (cfs)
94.868.92
94.878.93
94.888.94
94.898.96
94.908.97
94.918.98
94.928.99
94.939.01
94.949.02
94.959.03
94.969.04
94.979.06
94.989.07
94.999.08
95.009.09