NOAA 24-hr D 2 YR-F Rainfall=4.04" Printed 12/19/2025
Analysis - Proposed Conditions NO Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LL
Hydrograph for Pond 5P: BIORETENTION BASIN 1A
Time (hours)Inflow (cfs)Storage (cubic-feet)Elevation (feet)Primary (cfs)
0.000.00090.000.00
2.000.011690.010.00
4.000.0210990.070.00
6.000.0225990.170.00
8.000.0448590.320.00
10.000.0785390.570.00
12.000.932,19091.460.10
14.000.083,09292.060.16
16.000.052,50691.670.12
18.000.042,06391.380.09
20.000.031,81191.210.05
22.000.031,72291.150.03
24.000.021,69291.130.03
26.000.001,59591.060.01
28.000.001,56091.040.00
30.000.001,54491.030.00
32.000.001,53491.020.00
34.000.001,52891.020.00
36.000.001,52491.020.00
38.000.001,52191.010.00
40.000.001,51891.010.00
42.000.001,51691.010.00
44.000.001,51591.010.00
46.000.001,51391.010.00
48.000.001,51291.010.00
50.000.001,51191.010.00
52.000.001,51191.010.00
54.000.001,51091.010.00
56.000.001,50991.010.00
58.000.001,50991.010.00
60.000.001,50891.010.00
62.000.001,50891.010.00
64.000.001,50791.000.00
66.000.001,50791.000.00
68.000.001,50791.000.00
70.000.001,50691.000.00
72.000.001,50691.000.00
Page 105