Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv. UI as Pervious Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method

Subcatchment2S: DA-P1 PERVIOUS Runoff Area=1.220 ac 0.00% Impervious Runoff Depth=0.05" Flow Length=525' Tc=14.2 min CN=39/0 Runoff=0.01 cfs 222 cf

Subcatchment3S: DA-P3 PERVIOUS Runoff Area=0.680 ac 0.00% Impervious Runoff Depth=0.05" Flow Length=363' Tc=11.5 min CN=39/0 Runoff=0.00 cfs 124 cf

Subcatchment4S: DA-P2PERVIOUS Runoff Area=0.430 ac 0.00% Impervious Runoff Depth=0.05" Flow Length=168' Slope=0.0300'/' Tc=8.7 min CN=39/0 Runoff=0.00 cfs 78 cf

Subcatchment6S: DA-P3IMPERVIOUS Runoff Area=0.200 ac 100.00% Impervious Runoff Depth=3.81" Flow Length=155' Tc=4.3 min CN=0/98 Runoff=0.70 cfs 2,762 cf

Subcatchment7S: DA-P2IMPERVIOUS Runoff Area=0.190 ac 100.00% Impervious Runoff Depth=3.81" Flow Length=172' Tc=4.3 min CN=0/98 Runoff=0.66 cfs 2,624 cf

Subcatchment8S: DA-P1 IMPERVIOUS Runoff Area=0.400 ac 100.00% Impervious Runoff Depth=3.81" Flow Length=372' Slope=0.0200'/' Tc=2.5 min CN=0/98 Runoff=1.58 cfs 5,525 cf

Runoff Area=3,000 sf 100.00% Impervious Runoff Depth=3.81" Flow Length=40' Tc=0.3 min CN=0/98 Runoff=0.29 cfs 951 cf

Subcatchment14S: LOT 11 Roof

Pond 2P: Subsurface Infiltration Basin 1 Discarded=0.42 cfs 5,192 cf Peak Elev=87.01' Storage=7 cf Inflow=0.42 cfs 5,192 cf Primary=0.00 cfs 0 cf Outflow=0.42 cfs 5,192 cf

Pond 5P: BIORETENTIONBASIN 1A Peak Elev=92.21' Storage=3,321 cf Inflow=1.58 cfs 5,747 cf Outflow=0.17 cfs 4,241 cf

Peak Elev=94.83' Storage=51 cf Inflow=0.00 cfs 78 cf Outflow=0.00 cfs 32 cf

Pond 6P: BIORENTION BASIN 2A

Pond 8P: INFILTRATIONBASIN 3 Peak Elev=90.76' Storage=13 cf Inflow=0.27 cfs 2,783 cf

Pond 8P: INFILTRATIONBASIN 3 Peak Elev=90.76' Storage=13 cf Inflow=0.27 cfs 2,783 cf Discarded=0.27 cfs 2,783 cf Primary=0.00 cfs 0 cf Outflow=0.27 cfs 2,783 cf

Pond 10P: PERVIOUS PAVEMENT2B Peak Elev=94.81' Storage=870 cf Inflow=0.66 cfs 2,624 cf Outflow=0.19 cfs 2,620 cf

Pond 15P: PERVIOUS PAVEMENT3B Peak Elev=94.82' Storage=866 cf Inflow=0.70 cfs 2,762 cf Outflow=0.27 cfs 2,759 cf

Pond 33P: INFILTRATIONBASIN 2 Peak Elev=92.28' Storage=408 cf Inflow=0.19 cfs 2,652 cf Discarded=0.09 cfs 2,652 cf Primary=0.00 cfs 0 cf Outflow=0.09 cfs 2,652 cf

Pond 42P: BIORENTION BASIN 3A Peak Elev=93.84' Storage=112 cf Inflow=0.00 cfs 124 cf Outflow=0.00 cfs 24 cf

Link 32L: POA1

Inflow=0.00 cfs 0 cf Primary=0.00 cfs 0 cf