Analysis - Proposed Conditions NOAA 24-hr D 2 YR-C Rainfall=3.42" Prepared by Civil Core Consulting Printed 12/19/2025 HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC Page 59

Stage-Discharge for Pond 15P: PERVIOUS PAVEMENT 3B

Elevation (feet)Primary (cfs)Elevation (feet)Primary (cfs)Elevation (feet)Primary (cfs)
93.800.0094.320.1194.840.58
93.810.0094.330.1194.850.74
93.820.0094.340.1194.860.93
93.830.0094.350.1194.871.13
93.840.0094.360.1194.881.35
93.850.0094.370.1194.891.58
93.860.0194.380.1194.901.82
93.870.0194.390.1194.912.07
93.880.0194.400.1294.922.34
93.890.0194.410.1294.932.62
93.900.0294.420.1294.942.91
93.910.0294.430.1294.953.21
93.920.0294.440.1294.963.52
93.930.0394.450.1294.973.84
93.940.0394.460.1294.984.17
93.950.0394.470.1294.994.50
93.960.0494.480.1295.004.85
93.970.0494.490.1395.015.21
93.980.0594.500.1395.025.57
93.990.0594.510.1395.035.95
94.000.0594.520.1395.046.33
94.010.0594.530.1395.056.72
94.020.0694.540.1395.067.11
94.030.0694.550.1395.077.46
94.040.0694.560.1395.087.47
94.050.0694.570.1395.097.48
94.060.0694.580.1395.107.50
94.070.0794.590.1495.117.51
94.080.0794.600.1495.127.52
94.090.0794.610.1495.137.53
94.100.0794.620.1495.147.54
94.110.0794.630.1495.157.55
94.120.0894.640.1495.167.56
94.130.0894.650.1495.177.57
94.140.0894.660.1495.187.58
94.150.0894.670.1495.197.60
94.160.0894.680.1495.207.61
94.170.0894.690.1595.217.62
94.180.0994.700.1595.227.63
94.190.0994.710.1595.237.64
94.200.0994.720.1595.247.65
94.210.0994.730.1595.257.66
94.220.0994.740.1595.267.67
94.230.0994.750.1595.277.68
94.240.1094.760.1595.287.69
94.250.1094.770.1595.297.70
94.260.1094.780.1595.307.72
94.270.1094.790.15
94.280.1094.800.16
94.290.1094.810.21
94.300.1094.820.31
94.310.1094.830.43