Introduction.....1
○ Existing Conditions .....1
○ Proposed Development .....1
○ Soils .....1
Stormwater Analysis .....2
○ Existing Hydrology .....2
○ Proposed Hydrology .....5
○ Storm Sewer Design .....9
Compliance.....9
○ Water Quality .....9
○ Water Quantity .....10
○ Groundwater Recharge .....11
○ Green Infrastructure .....11
○ Groundwater Mounding Analysis .....13
○ Soil Erosion and Sediment Control .....14
○ New Jersey Pineland Commission Specific Requirements .....15
County ROW Improvements .....20
Conclusion .....20
Appendix A – Maps .....1
Appendix B – Existing Conditions Analysis .....2
Appendix C – Proposed Conditions Analysis .....3
Appendix D – Failure Analysis .....4
Appendix E – Water Quality Analysis .....5
Appendix F – County ROW Improvements .....6
Appendix G – Groundwater Mounding Analysis .....7
Appendix H – Pipe System Calculations .....8
Appendix I – Conduit Outlet Protection .....9
Appendix J – Drainage Area Maps .....10