Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
| Time span=0.00-7.2.00 hrs, dt=0.01 hrs, 7.201 points | |
| Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv. UI as Pervious | |
| Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method | |
| Subcatchment2S: DA-P1 PERVOUS | Runoff Area=1.220 ac 0.00% Impervious Runoff Depth=0.01" Flow Length=525' Tc=14.2 min CN=39/0 Runoff=0.00 cfs 24 cf |
|---|---|
| Subcatchment3S: DA-P3 PERVOUS | Runoff Area=0.680 ac 0.00% Impervious Runoff Depth=0.01" Flow Length=363' Tc=11.5 min CN=39/0 Runoff=0.00 cfs 13 cf |
| Subcatchment4S: DA-P2 PERVOUS | Runoff Area=0.430 ac 0.00% Impervious Runoff Depth=0.01" Flow Length=168' Slope=0.0300 /' Tc=8.7 min CN=39/0 Runoff=0.00 cfs 8 cf |
| Subcatchment6S: DA-P3 IMPERVOUS | Runoff Area=0.200 ac 100.00% Impervious Runoff Depth=3.19" Flow Length=155' Tc=4.3 min CN=0/98 Runoff=0.59 cfs 2,314 cf |
| Subcatchment7S: DA-P2 IMPERVOUS | Runoff Area=0.190 ac 100.00% Impervious Runoff Depth=3.19" Flow Length=172' Tc=4.3 min CN=0/98 Runoff=0.56 cfs 2,198 cf |
| Subcatchment8S: DA-P1 IMPERVOUS | Runoff Area=0.400 ac 100.00% Impervious Runoff Depth=3.19" Flow Length=372' Slope=0.0200 /' Tc=2.5 min CN=0/98 Runoff=1.33 cfs 4,627 cf |
| Subcatchment14S: LOT 11 Roof | Runoff Area=3,000 sf 100.00% Impervious Runoff Depth=3.19" Flow Length=40' Tc=0.3 min CN=0/98 Runoff=0.25 cfs 797 cf |
| Pond 2P: Subsurface Infiltration Basin 1 | Peak Elev=87.01' Storage=6 cf Inflow=0.34 cfs 3,941 cf Discarded=0.34 cfs 3,941 cf Primary=0.00 cfs 0 cf Outflow=0.34 cfs 3,941 cf |
| Pond 5P: BIORETENTION BASIN 1A | Peak Elev=91.88' Storage=2,824 cf Inflow=1.33 cfs 4,651 cf Outflow=0.14 cfs 3,145 cf |
| Pond 6P: BIORETENTION BASIN 2A | Peak Elev=94.42' Storage=8 cf Inflow=0.00 cfs 8 cf Outflow=0.00 cfs 0 cf |
| Pond 8P: INFILTRATION BASIN 3 | Peak Elev=90.76' Storage=6 cf Inflow=0.15 cfs 2,310 cf Discarded=0.15 cfs 2,310 cf Primary=0.00 cfs 0 cf Outflow=0.15 cfs 2,310 cf |
| Pond 10P: PERVOUS PAVEMENT 2B | Peak Elev=94.59' Storage=748 cf Inflow=0.56 cfs 2,198 cf Outflow=0.14 cfs 2,194 cf |
| Pond 15P: PERVOUS PAVEMENT 3B | Peak Elev=94.71' Storage=773 cf Inflow=0.59 cfs 2,314 cf Outflow=0.15 cfs 2,310 cf |
| Pond 33P: INFILTRATION BASIN 2 | Peak Elev=92.12' Storage=286 cf Inflow=0.14 cfs 2,194 cf Discarded=0.08 cfs 2,194 cf Primary=0.00 cfs 0 cf Outflow=0.08 cfs 2,194 cf |
| Pond 42P: BIORETENTION BASIN 3A | Peak Elev=93.42' Storage=13 cf Inflow=0.00 cfs 13 cf Outflow=0.00 cfs 0 cf |
| Link 32L: POA1 | Inflow=0.00 cfs 0 cf Primary=0.00 cfs 0 cf |