PROJECT #: CALCULATED BY: DATE:
W_{0} Max Width of Pipe/Culvert 12 in
Q Flow: 25-yr Storm Discharge 0.14 cfs
TW Tail water from 2 year storm 1.59 ft
Rip Rap Stone Size Calculations
q Unit Discharge = Q/W_{0} 0.14 cfs per foot
Option 1 if Scour Hole Depth, y = 1/2 D0 6 in
Apron Dimension Calculations
Minimum Bottom Width W1 = 2 W0 2.00 ft
Minimum Bottom Length L1 = 3 D0 3.00 ft
Minimum Top Width (max side slope of 3:1), 5.00 ft
Minimum Top Length (max side slope of 3:1) 6.00 ft
Median Stone d50 = (0.0125 q1.33)/TW 6 in
Apron Thickness, TH = 2 × d50 12 in
Option 2 if Scour Hole Depth, y = D0 12 in
Apron Dimension Calculations
Minimum Bottom Width W1 = 2 W0 0.02 ft
Minimum Bottom Length L1 = 3 D0 3.00 ft
Minimum Top Width (max side slope of 3:1), 8.00 ft
Minimum Top Length (max side slope of 3:1) 9.00 ft
Median Stone d50 = (0.0082 q1.33)/TW 4 in
Apron Thickness, TH = 2xd50 8 in