Groundwater Mounding-Duration of Infiltration Period
| Basin | Subsurface Infiltration Basin 1 | |
|---|---|---|
| Volume (cf) | 29874 | |
| Infiltration Area (sf) | 2475 | |
| Recharge Rate (in/hr) | 10 | |
| Duration of infiltration period, t (hr) = (Volume of runoff to be infiltrated (cf) × 12 in/ft)/(Infiltration area (sf) × Recharge rate (in/hr)) | ft | |
| Duration of Infiltration Period | 14.48 | |
| Groundwater Mounding-Duration of Infiltration Period | ||
| Basin | Infiltration Basin 2 | |
| Volume (cf) | 9837 | |
| Infiltration Area (sf) | 520 | |
| Recharge Rate (in/hr) | 4.95 | |
| Duration of infiltration period, t (hr) = (Volume of runoff to be infiltrated (cf) × 12 in/ft)/(Infiltration area (sf) × Recharge rate (in/hr)) | ||
| Duration of Infiltration Period | 45.86 | |
| Basin | Infiltration Basin 3 | |
| Volume (cf) | 12583 | |
| Infiltration Area (sf) | 1150 | |
| Recharge Rate (in/hr) | 10 | |
| Duration of infiltration period, t (hr) = (Volume of runoff to be infiltrated (cf) × 12 in/ft)/(Infiltration area (sf) × Recharge rate (in/hr)) | ||
13.13