| Analysis - Proposed Conditions | Multi-Event Tables |
|---|---|
| Prepared by Civil Core Consulting | Printed 12/19/2025 |
| HydroCAD\circledR 10.20-8a s/n 13637\circledC 2025 HydroCAD Software Solutions LLC | Page 61 |
| Events for Pond 45P: BIORENTION BASIN 2A | ||||
| Event | Inflow (cfs) | Primary (cfs) | Elevation (feet) | Storage (cubic-feet) |
|---|---|---|---|---|
| NJDEP WQ | 0.00 | 0.00 | 94.30 | 0 |