| Analysis - Proposed Conditions | Multi-Event Tables |
|---|---|
| Prepared by Civil Core Consulting | Printed 12/19/2025 |
| HydroCAD\circledR 10.20-8a s/n 13637\circledC 2025 HydroCAD Software Solutions LLC | Page 59 |
Events for Pond 14P: PERVIOUS PAVEMENT 3B
Event Inflow (cfs) Primary (cfs) Elevation (feet) Storage (cubic-feet)
NJDEP WQ 0.53 0.09 94.22 503