| Analysis - Proposed Conditions | Multi-Event Tables |
|---|---|
| Prepared by Civil Core Consulting | Printed 12/19/2025 |
| HydroCAD\circledR 10.20-8a s/n 13637\circledC 2025 HydroCAD Software Solutions LLC | Page 57 |
Events for Pond 12P: PERVIOUS PAVEMENT 2B
Event Inflow (cfs) Primary (cfs) Elevation (feet) Storage (cubic-feet)
NJDEP WQ 0.59 0.09 94.20 487