NJ DEP 2-hr NJDEP WQ Rainfall=1.25" Printed 12/19/2025
Analysis - Proposed Conditions NJ D Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions L
Page 48
Hydrograph for Pond 45P: BIORENTION BASIN 2A
Time (hours)Inflow (cfs)Elevation (feet)Primary (cfs)
0.000.0094.300.00
1.000.0094.300.00
2.000.0094.300.00
3.000.0094.300.00
4.000.0094.300.00
5.000.0094.300.00
6.000.0094.300.00
7.000.0094.300.00
8.000.0094.300.00
9.000.0094.300.00
10.000.0094.300.00
11.000.0094.300.00
12.000.0094.300.00
13.000.0094.300.00
14.000.0094.300.00
15.000.0094.300.00
16.000.0094.300.00
17.000.0094.300.00
18.000.0094.300.00
19.000.0094.300.00
20.000.0094.300.00
21.000.0094.300.00
22.000.0094.300.00
23.000.0094.300.00
24.000.0094.300.00
25.000.0094.300.00
26.000.0094.300.00
27.000.0094.300.00
28.000.0094.300.00
29.000.0094.300.00
30.000.0094.300.00
31.000.0094.300.00
32.000.0094.300.00
33.000.0094.300.00
34.000.0094.300.00
35.000.0094.300.00
36.000.0094.300.00
37.000.0094.300.00
38.000.0094.300.00
39.000.0094.300.00
40.000.0094.300.00
41.000.0094.300.00
42.000.0094.300.00
43.000.0094.300.00
44.000.0094.300.00
45.000.0094.300.00
46.000.0094.300.00
47.000.0094.300.00
48.000.0094.300.00
49.000.0094.300.00
50.000.0094.300.00
51.000.0094.300.00
Time (hours)Inflow (cfs)Elevation (feet)Primary (cfs)
52.000.0094.300.00
53.000.0094.300.00
54.000.0094.300.00
55.000.0094.300.00
56.000.0094.300.00
57.000.0094.300.00
58.000.0094.300.00
59.000.0094.300.00
60.000.0094.300.00
61.000.0094.300.00
62.000.0094.300.00
63.000.0094.300.00
64.000.0094.300.00
65.000.0094.300.00
66.000.0094.300.00
67.000.0094.300.00
68.000.0094.300.00
69.000.0094.300.00
70.000.0094.300.00
71.000.0094.300.00
72.000.0094.300.00