| Analysis - Failure | Multi-Event Tables |
|---|---|
| Prepared by Civil Core Consulting | Printed 12/19/2025 |
| HydroCAD\textregistered 10.20-8a s/n 13637\textregistered 2025 HydroCAD Software Solutions LLC | Page1 |
| Events for Link 33L: POA 2 | ||||
| Event | Inflow (cfs) | Primary (cfs) | Elevation (feet) | |
|---|---|---|---|---|
| 2 YR-C | 0.10 | 0.10 | 0.00 | |
| 10 YR-C | 0.15 | 0.15 | 0.00 | |