| Analysis - Failure | Multi-Event Tables |
|---|---|
| Prepared by Civil Core Consulting | Printed 12/19/2025 |
| HydroCAD\circledR 10.20-8a s/n 13637\circledC 2025 HydroCAD Software Solutions LLC | Page 206 |
| Events for Pond 7P: BIORENTION BASIN 2A | |||||
| Event | Inflow (cfs) | Primary (cfs) | Elevation (feet) | Storage (cubic-feet) | |
|---|---|---|---|---|---|
| 2 YR-C | 0.30 | 0.30 | 95.52 | 174 | |
| 10 YR-C | 0.48 | 0.48 | 95.54 | 178 | |