Analysis - Failure NOAA 24-hr D 10 YR-C Rainfall=5.38" Prepared by Civil Core Consulting Printed 12/19/2025 HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC Page 160
Stage-Discharge for Pond 7P: BIORENTION BASIN 2A
Elevation (feet)Primary (cfs)Elevation (feet)Primary (cfs)Elevation (feet)Primary (cfs)
94.300.0094.820.0095.340.11
94.310.0094.830.0095.350.11
94.320.0094.840.0095.360.11
94.330.0094.850.0095.370.11
94.340.0094.860.0195.380.11
94.350.0094.870.0195.390.11
94.360.0094.880.0195.400.12
94.370.0094.890.0195.410.12
94.380.0094.900.0295.420.12
94.390.0094.910.0295.430.12
94.400.0094.920.0295.440.12
94.410.0094.930.0395.450.12
94.420.0094.940.0395.460.12
94.430.0094.950.0395.470.12
94.440.0094.960.0495.480.12
94.450.0094.970.0495.490.13
94.460.0094.980.0595.500.13
94.470.0094.990.0595.510.18
94.480.0095.000.0595.520.28
94.490.0095.010.0595.530.40
94.500.0095.020.0695.540.55
94.510.0095.030.0695.550.72
94.520.0095.040.0695.560.90
94.530.0095.050.0695.571.10
94.540.0095.060.0695.581.32
94.550.0095.070.0795.591.55
94.560.0095.080.0795.601.79
94.570.0095.090.0795.612.05
94.580.0095.100.0795.622.31
94.590.0095.110.0795.632.59
94.600.0095.120.0895.642.88
94.610.0095.130.0895.653.18
94.620.0095.140.0895.663.49
94.630.0095.150.0895.673.81
94.640.0095.160.0895.684.14
94.650.0095.170.0895.694.48
94.660.0095.180.0995.704.83
94.670.0095.190.0995.715.18
94.680.0095.200.0995.725.55
94.690.0095.210.0995.735.92
94.700.0095.220.0995.746.30
94.710.0095.230.0995.756.45
94.720.0095.240.1095.766.47
94.730.0095.250.1095.776.48
94.740.0095.260.1095.786.50
94.750.0095.270.1095.796.52
94.760.0095.280.1095.806.53
94.770.0095.290.1095.816.55
94.780.0095.300.1095.826.56
94.790.0095.310.1095.836.58
94.800.0095.320.1195.846.59
94.810.0095.330.1195.856.61
Elevation (feet)Primary (cfs)
95.866.62
95.876.64
95.886.65
95.896.67
95.906.68
95.916.70
95.926.71
95.936.73
95.946.74
95.956.75
95.966.77
95.976.78
95.986.80
95.996.81
96.006.83