Analysis - Proposed Conditions Prepared by Civil Core Consulting HydroCAD® 10.20-7a s/n 13637 © 2025 HydroCAD Software Solutions LLC
Multi-Event Tables Printed 10/24/2025 Page 516
Events for Pond 39P: Subsurface Basin Lot 2
EventInflow (cfs)Discarded (cfs)Elevation (feet)Storage (acre-feet)
2 YR-C0.150.0793.250.001
2 YR-F0.180.0793.360.001
10 YR-C0.240.0793.650.002
10 YR-F0.280.0793.810.003
100 YR-C0.420.0794.420.007
100 YR-F0.510.0795.080.009