Hydrograph for Subcatchment 55S: Roof Lot 7

Time (hours)Precip. (inches)Perv.Excess (inches)Imp.Excess (inches)Runoff (cfs)
0.000.000.000.000.00
2.000.270.000.120.00
4.000.600.000.410.01
6.000.970.000.770.01
8.001.480.001.260.01
10.002.260.002.030.02
12.005.470.005.230.31
14.009.150.008.910.02
16.009.930.009.690.01
18.0010.440.0010.190.01
20.0010.810.0010.570.01
22.0011.140.0010.890.01
24.0011.410.0011.170.01
26.0011.410.0011.170.00
28.0011.410.0011.170.00
30.0011.410.0011.170.00
32.0011.410.0011.170.00
34.0011.410.0011.170.00
36.0011.410.0011.170.00
38.0011.410.0011.170.00
40.0011.410.0011.170.00
42.0011.410.0011.170.00
44.0011.410.0011.170.00
46.0011.410.0011.170.00
48.0011.410.0011.170.00
50.0011.410.0011.170.00
52.0011.410.0011.170.00
54.0011.410.0011.170.00
56.0011.410.0011.170.00
58.0011.410.0011.170.00
60.0011.410.0011.170.00
62.0011.410.0011.170.00
64.0011.410.0011.170.00
66.0011.410.0011.170.00
68.0011.410.0011.170.00
70.0011.410.0011.170.00
72.0011.410.0011.170.00

Page 441