Wildland Urban Interface2\n(based on total area)
Percent of Service Territory in CPUC High Fire Threat Districts (based on total area)
Prevailing Wind Directions & Speeds by Season
Miles of Owned Lines Underground and/or Overhead
Explanatory Note 1 – Measurements in Circuit Miles.
Explanatory Note 2 – VMUS owns the electrical infrastructure that is all underground and services industrial and commercial customers only.
Percent of Owned Lines in CPUC High Fire Threat Districts
Tier 2: 0% Tier 3: 0%
Overhead Transmission Lines as % of Total Transmission System (Inside and Outside Service Territory)
Tier 2: 0% Tier 3: 0%
Customers have ever lost service due to an IOU PSPS event?
Have customers ever been notified of a potential loss of service to due to a forecasted IOU PSPS event?
Has developed protocols to pre-emptively shut off electricity in response to elevated wildfire risks?
☒Includes maps Tier 2: 0% Tier 3: 0%
☒ Includes maps Winter (Dec., Jan., and Feb.): Wind direction is North/North East with an average speed of 4.3K or 4.95 MPH. Spring (Mar., April, and May): Wind direction is North/North East with an average speed of 6K or 6.9 MPH. Summer (June, July, and Aug.): Wind direction is North/North East with an average speed of 5.3K or 6.1 MPH. Fall (Sept., Oct., and Nov.): Wind direction is North/North East with an average speed of 4.3K or 4.95 MPH.
Overhead Dist.: 0.06 miles Overhead Trans.: 0 miles Underground Dist.: 25.2 miles Underground Trans.: 0 miles
Overhead Distribution Lines as % of Total Distribution System (Inside and Outside Service Territory)
☐ Yes ☒ No
☐ Yes ☒ No
☐ Yes ☒ No
2 This data shall be based on the definitions and maps maintained by the United States Department of Agriculture, as most recently assembled in The 2010 Wildland-Urban Interface of the Conterminous United States, available at https://www.fs.fed.us/nrs/pubs/rmap/rmap_nrs8.pdf.
2