| Required Element of WMP | Location in WMP | Summary of VMUS WMP | Independent Evaluator's Assessment |
|---|---|---|---|
| PUC § 8387(b)(2)(N): A description of the processes and procedures the local publicly owned electric utility or electrical cooperative shall use to do all of the following:(i) Monitor and audit the implementation of the wildfire mitigation plan.(ii) Identify any deficiencies in the wildfire mitigation plan or its implementation, and correct those deficiencies.(iii) Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, that are carried out under the plan, other applicable statutes, or commission rules. | Section VII.C-E | VMUS will submit their Wildfire Mitigation Plan to the Utility Commission, City Council, and the Victorville Fire Department for review and comment on an annual basis.VMUS will continue to monitor and reported reliability statistics to analyze the effectiveness of the Wildfire Mitigation Plan. | VMUS WMP meets this requirement. |
11