Required Element of WMPLocation in WMPSummary of VMUS WMPIndependent Evaluator's Assessment
associated with topographic and climatological risk factors throughout the different parts of the local publicly owned electric utility's or electrical cooperative's service territory.
PUC § 8387(b)(2)(K): Identification of any geographic area in the local publicly owned electric utility's or electrical cooperative's service territory that is a higher wildfire threat than is identified in a commission fire threat map, and identification of where the commission should expand a high fire threat district based on new information or changes to the environment.Section IVNo part of VMUS service territory is a higher wildfire threat than identified on the CPUC Fire Threat Map.VMUS WMP meets this requirement.
PUC § 8387(b)(2)(L): A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk.Section IV.BVMUS has compiled and assessed historical data for local and regional earthquake and flooding events.VMUS WMP meets this requirement.
PUC § 8387(b)(2)(M): A statement of how the local publicly owned electric utility or electrical cooperative will restore service after a wildfire.Section VIVMUS has listed a detailed safety plan of the actions to be taken in order to restore services after a wildfire.VMUS WMP meets this requirement.
10