Required Element of WMPLocation in WMPSummary of VMUS WMPIndependent Evaluator's Assessment
PUC § 8387(b)(2)(G): Appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines. The procedures shall consider the need to notify, as a priority, critical first responders, health care facilities, and operators of telecommunications infrastructure.Section V.E-FDue to minimal risk of underground system, VMUS is not adopting specific protocols for deenergizing any portions of its electrical distribution system.VMUS WMP meets this requirement.
PUC § 8387(b)(2)(H): Plans for vegetation management.Section V.CVMUS meets or exceeds industry standards; CPUC GO95, GO128, GO165, GO174, Public resources Code 4292-4293.VMUS WMP meets this requirement.
PUC § 8387(b)(2)(I): Plans for inspections of the local publicly owned electric utility's or electrical cooperative's electrical infrastructure.Section V.DVMUS meets or exceeds the inspection requirements set forth in CPUC GO 165 and 174.VMUS WMP meets this requirement.
PUC § 8387(b)(2)(J): A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the local publicly owned electric utility's or electrical cooperative's service territory. The list shall include, but not be limited to, both of the following: (i) Risks and risk drivers associated with design, construction, operation, and maintenance of the local publicly owned electric utility's or electrical cooperative's equipment and facilities. (ii) Particular risks and risk driversSection IV.APrimary risk drivers for Wildfire within VMUS service territory are Earthquakes and Flooding.VMUS WMP meets this requirement.

9