| than is identified in a commission fire threat map, and identification of where the commission should expand a high fire threat district based on new information or changes to the environment. | | |
|---|
| Enterprise-wide Risks | PUC § 8387(b)(2)(L): A methodology for identifying and presenting enterprise wide safety risk and wildfire-related risk. | Section 4-B Page 11 |
|---|
| Restoration of Service | PUC § 8387(b)(2)(M): A statement of how the local publicly owned electric utility or electrical cooperative will restore service after a wildfire. | Section 6 Page 14 |
|---|
| Monitor and Audit | PUC § 8387(b)(2)(N): A description of the processes and procedures the local publicly owned electric utility or electrical cooperative shall use to do all of the following
(i) Monitor and audit the implementation of the wildfire mitigation plan.
(ii) Identify any deficiencies in the wildfire mitigation plan or its implementation, and correct those deficiencies.
(iii) Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, that are carried out under the plan, other applicable statutes, or commission rules. | Section 7-C Page 16 |
|---|
| Qualified Independent Evaluator | PUC § 8387(c): The local publicly owned electric utility or electrical cooperative shall contract with a qualified independent evaluator with experience in assessing the safe operation of electrical infrastructure to review and assess the comprehensiveness of its wildfire mitigation plan. The independent evaluator shall issue a report that shall be made available on the Internet Web site of the local publicly owned electric utility or electrical cooperative, and shall present the report at a public meeting of the local publicly owned electric utility’s or electrical cooperative’s governing board. | https://www.victorvilleca.gov/home/showpubblisheddocument/4157/637262615505930000 |
|---|