Capital Projects Budget Sarasota Manatee Airport Authority Fiscal Years Ending September 30 Schedule 13
DescriptionBudgetAirline RatesAuthority FundedPurchasing SourcesAIP/FDOT/ CFC/PFCFuture Bonds
Information Technology Systems
1Phone System Upgrade$ 582,000$ -$ 582,000$ -$ -$ --
2Airline Services Enhancements380,000-380,000----
3Airport Network and Security Enhancements346,000-346,000----
Total Information Technology Systems$ 1,308,000$ -$ 1,308,000$ -$ -$ --
Operations
4OWL Perimeter Radar$ 280,000$ -$ 280,000$ -$ -$ --
Total Operations$ 280,000$ -$ 280,000$ -$ -$ --
Passenger Experience & Air Service
5Sense of Place Project$ 300,000$ -$ 300,000$ -$ -$ --
Total Passenger Experience & Air Service$ 300,000$ -$ 300,000$ -$ -$ --
Facilities
6Loading Bridge PC Air Replacements$ 848,656$ -$ 848,656$ -$ -$ --
7Renovation of Waterfall Catch Basin500,000-500,000----
8Replacement of Facilities Fleet Garage Air Conditioning Units350,000-350,000----
9Sealing of Terminal Ramp Joints300,000-300,000----
10T-Hangar Electrical Service Replacements240,000240,000-----
11Main Terminal Exterior Painting200,000-200,000----
12Electrical Grid System Assessment135,000135,000-----
Total Facilities$ 2,573,656$ 375,000$ 2,198,656$ -$ -$ --
Engineering
13Multi Modal Transportation Facility Design$ 30,000,000$ -$ -$ 15,000,000$ 15,000,000--
14Terminal Electrical Upgrades22,000,000--22,000,000---
15Emergency Operations Center Construction10,000,000--10,000,000---
16Bag Claim Structural Improvements, Re-roof and Concourse B Airc6,000,000--6,000,000---
17Concourse B High Mast Lighting800,000-800,000----
18Waterfall Pumproom Upgrades & Panel Relocation1,360,000-1,360,000----
19Airfield Generator Enclosure510,000-510,000----
20Access Control Security Enhancements500,000-250,000250,000---
21Level 3 HVAC Replacement Phase I700,000-700,000----
22Concourse A Generator Fuel Tank Canopy300,000-300,000----
23Airfield Guidance Sign Replacement250,000--250,000---
24Parking Lot and Roadway Lighting & Security Improvements100,000100,000-----
Total Engineering$ 72,520,000$ 100,000$ 3,920,000$ 53,500,000$ 15,000,000--
Total Capital Projects$ 76,981,656$ 475,000$ 8,006,656$ 53,500,000$ 15,000,000--
Cost Center Allocation
Airfield$ -
Terminal Building-
Terminal Area100,000
Other Buildings & Areas240,000
Administration135,000
$ 475,000