NOTES:
1. NO CONSTRUCTION ACTIVITY IS PERMITTED
WITHIN THE PROTECTIVE FENCING.
AS CONSTRUCTION NEARS COMPLETION THE FENCING WILL BE REMOVED AS DIRECTED BY THE LANDSCAPE ARCHITECT.
AT THE COMPLETION OF CONSTRUCTION ALL TREES WILL BE PRUNED AS NECESSARY TO CORRECT ANY DAMAGE RESULTING FROM CONSTRUCTION ACTIVITY.
TREES TO BE PROTECTED DURING CONSTRUCTION WILL BE TAGGED
THE FINAL DETERMINATION OF THOSE TO BE PROTECTED WILL BE MADE BY THE LANDSCAPE ARCHITECT IN THE FIELD.
PROTECTIVE FENCING IS TO BE
ERECTED PRIOR TO CONSTRUCTION
AND MAINTAINED DURING CONSTRUCTION
AS DIRECTED BY THE LANDSCAPE ARCHITECT.
EMPORARY TREE PROTECTION DETAIL
N.T.S.
01/15/24 ADD LOT 24; REV PER 11/30/23 RVE, 11/30/23 OLA, AND 6/15/23 JT BFP LETTERS MSM EAD BPM
DATE REVISION DRAWN CHECKED RELEASED
SOIL EROSION AND SEDIMENT CONTROL DETAILS
PRELIMINARY AND FINAL MAJOR SITE PLAN LOTS 24 & 25 ~ BLOCK 4801 TAX MAP SHEET NO. 48 SITUATED IN JACKSON TOWNSHIP, OCEAN COUNTY, N.J.