lights will increase development in this area. Spurring residential development requires these elements to create a welcoming and safe environment.

  • Long-Term Cost Savings: While there are upfront costs associated with the expansion of the road and stormwater, it is an investment in the City's long-term financial sustainability. By proactively addressing the need for increased sewer and water system capacity, the City can avoid more significant and costly repairs and malfunctions in the future.
  • Community Well-Being: By providing roads for emergency services and sidewalks for pedestrians, the project will increase the safety and well-being of our citizens. The expansion contributes to the overall quality of life for Eustis residents by providing residents with a project that will promote a high standard of living.
  • Planning for Future Growth: With the expansion of the Coolidge and 7 Side Streets Road and Stormwater, the City is promoting development in the Rosenwald Garden area. By installing roads and stormwater, the City has demonstrated forward-thinking urban planning and infrastructure development.

The expansion of the Coolidge and 7 Side Streets Road and Stormwater represent a proactive and forward-looking investment in the City's infrastructure, environment, and community well-being. It supports growth, protects the environment, ensures regulatory compliance, and contributes to the long-term financial stability of the City. This reflects Eustis' commitment to responsible urban development and environmental stewardship.

b. Coolidge Side Streets Sewer & Water Expansion: In FY 2025/26, the City will complete the construction of the Coolidge Side Streets Sewer and Water Expansion project. This project will be funded by the Utility R&R Fund, the Sewer and Water Impact Fee Funds. Additionally, staff have applied for FDEP Funding.

The expansion of the sewer and water system will provide utilities for future growth in the Rosenwald Garden area. The new sewer system will eliminate septic tanks for future development and allow for septic to sewer projects on existing homes. The water system will allow for growth and fire flow on in an area that could not support the demand. This project aligns with the Competent and Effective Government Priority, specifically Goal #3 Strategic Priority 3 of the City's Strategic Plan - Develop, adopt, and implement master plans for the repair, replacement and expansion of public utilities and facilities.

The expansion of the Coolidge Side Streets Sewer and Water Expansion offers several significant benefits to both the City and its residents. This expansion project is a strategic investment in the City's infrastructure and environmental stewardship. Here are some key advantages:

  • Increased Sewer and Water System Capacity: The Coolidge Side Streets Sewer and Water expansion will increase the City's sewer and water system capacity. This is crucial for growth in this area. The expansion ensures that the City can handle this increased demand and support continued growth and development.
  • Environmental Protection: Sewer systems are vital for safeguarding the environment and public health. Expanding the sewer system lowers the number of septic tanks being installed and allows for septic to sewer conversions.
  • Improved Water Quality: The reduction in septic tank installations will improve water quality in local rivers, lakes, and groundwater. This benefits not only Eustis residents