FunctionDepartmentProgram
Public WorksPublic Works - Stormwater 538Stormwater Projects 3720
AccountDESCRIPTIONActual FY 23-24Actual FY 24-25Adopted FY 25-26Projected FY 25-26Proposed FY 26-27
CAPITAL OUTLAY
538-60-01Diedrich Street Stormwater60,000----
538-60-02Stormwater Culvert Replace.19,300-110,000159,000110,000
538-60-03Eustis Street & Gottsche Ave.-12,633-170,050-
538-60-11Flood Control System--100,00067,250-
538-60-12Donnelly Av to Badger St Pipe----180,000
538-60-62Tractor Bush Hog Mower--45,00045,000-
538-60-63Stormwater Master Plan7,30742,310125,0004,94075,000
538-60-65Stormwater Camera-200,000200,000-
538-60-66Concrete Crushing45,000-55,00055,000-
538-60-69Public Works Street Sweeper-374,263---
Subtotal131,607429,206635,000701,240365,000
PROGRAM TOTAL131,607429,206635,000701,240365,000