SR 573 (S Dale Mabry Hwy) Repaving from Pinewood Street to Ballast Point Boulevard 443347-1-52-01
Project Details
Work TypeRepaving
PhaseCompleted
Limitsfrom south of Pinewood St to north of Ballast Point Blvd
Project StartJanuary 8, 2024
Length1.5 miles
CityTampa
CountyHillsborough
RoadDale Mabry Highway SR 573
Construction Cost$6.3 million
Estimated CompletionSpring 2025
ContractorPreferred Materials, Inc.
Contact Information
Project Information
Maricelle Venegas813-975-6204
RoadWork@dot.state.fl.us
Media Contact
Kayla Mejia813-975-6060
Kayla.Mejia@dot.state.fl.us
Image
Map data ©2025 Google ## About All construction activities associated with this project were completed on Monday, April 28, 2025. This project repaved South Dale Mabry Highway (SR 573) from south of Pinewood Street to north of Ballast Point Boulevard in South Tampa. In addition to repaving the roadway, this project added three midblock crossings and replaced the traffic signal at the intersection of South Dale Mabry Highway and Oklahoma Avenue with hurricane resistant poles.