Location: Cedar Swamp Road
P/F Major Site Plan to Construct 60,023 Square Foot Warehouse
Engineer/Architect: Feltz Collins Architecture, LLC
Planner: Dynamic Engineering
Attorney: Jeffrey R. Chang, Esq.
Date Complete: 6/9/22
Hearing Status: Initial Testimony
No applications at this time.
No applications at this time.
No applications at this time.
No applications at this time.