Location: Cedar Swamp Road P/F Major Site Plan to Construct 60,023 Square Foot Warehouse Engineer/Architect: Feltz Collins Architecture, LLC Planner: Dynamic Engineering Attorney: Jeffrey R. Chang, Esq. Date Complete: 6/9/22 Hearing Status: Initial Testimony
Location: Denton Lane
P/F Major Subdivision to Create 20 Residential Lots, 1 AH Lot 4 Units and 1 SW Lot Engineer: PDS Attorney: Adam Pfeffer, Esq. Date Complete: 9/1/21 Decision Due Date: Time Waived Hearing Status: Initial Testimony
No applications at this time.
No applications at this time.
No applications at this time.
No applications at this time.