| Block: 22009, Lot: 2 - A to 2 Site Contractors, Inc./Shimmy Fessler |
| Location: 55 Houston Avenue |
| Amended Site Plan for Ground Mounted Solar Energy |
| Engineer: | PDS |
|---|
| Attorney: | Adam Pfeffer, Esq. |
|---|
| Other: | James A. Clancy, PE |
|---|
| Date Complete: | Time Waived |
|---|
| Hearing Status: | Initial Testimony |
|---|
Location: 651 Herman Road
P/F Major Site Plan to Construct a New Warehouse and Office Building Engineer: PDS
Attorney: Donna Jennings, Esq.
Date Complete: Time Waived 8/31/22
Hearing Status: Initial Testimony
Location: 340 West Commodore Boulevard
Amended Existing Site Plan Approval for Consolidation of 2 Warehouse Buildings into 1 Engineer/Planner: PDS
Attorney: Salvatore Alfieri, Esq.
Date Complete: 7/15/22
Hearing Status: Initial Testimony
Location: Green Valley Road
Final Major Subdivision Approval
Engineer/Architect: WJH Engineering
Architect: BF Design Associates, LLC
Attorney: Adam Pfeffer, Esq.
Date Complete: 7/19/22
Hearing Status: Initial Testimony
Location: Victoria Circle and Piccadilly Drive / Piccadilly Drive / Hampshire Boulevard
Amended Site Plan for Removal of Wooden Fences Surrounding Basins
Engineer: None
Attorney: Joseph A. Kutschman III, Esq./ Christopher Lugara, Esq.
Date Complete: Time Waived 9/30/22
Hearing Status: Testimony Given 8/1/22
Eligible: Campbell Biker Burnstein Herman Canderozzi Wall Flemming Haring H
Eligible: Campbell, Riker, Burnstein, Herman, Canderozzi, Wall, Flemming, Haring, Hudak
No applications at this time.