| Block: 22009, Lot: 2 - A to 2 Site Contractors, Inc./Shimmy Fessler | |
| Location: 55 Houston Avenue | |
| Amended Site Plan for Ground Mounted Solar Energy | |
| Engineer: | PDS |
|---|---|
| Attorney: | Adam Pfeffer, Esq. |
| Other: | James A. Clancy, PE |
| Date Complete: | Time Waived |
| Hearing Status: | Initial Testimony |
Location: 651 Herman Road P/F Major Site Plan to Construct a New Warehouse and Office Building Engineer: PDS Attorney: Donna Jennings, Esq. Date Complete: Time Waived 8/31/22 Hearing Status: Initial Testimony
Location: 340 West Commodore Boulevard Amended Existing Site Plan Approval for Consolidation of 2 Warehouse Buildings into 1 Engineer/Planner: PDS Attorney: Salvatore Alfieri, Esq. Date Complete: 7/15/22 Hearing Status: Initial Testimony
Location: Green Valley Road Final Major Subdivision Approval Engineer/Architect: WJH Engineering Architect: BF Design Associates, LLC Attorney: Adam Pfeffer, Esq. Date Complete: 7/19/22 Hearing Status: Initial Testimony
Location: Victoria Circle and Piccadilly Drive / Piccadilly Drive / Hampshire Boulevard Amended Site Plan for Removal of Wooden Fences Surrounding Basins Engineer: None Attorney: Joseph A. Kutschman III, Esq./ Christopher Lugara, Esq. Date Complete: Time Waived 9/30/22 Hearing Status: Testimony Given 8/1/22 Eligible: Campbell Biker Burnstein Herman Canderozzi Wall Flemming Haring H
Eligible: Campbell, Riker, Burnstein, Herman, Canderozzi, Wall, Flemming, Haring, Hudak
No applications at this time.