Location: Victoria Circle and Piccadilly Drive / Piccadilly Drive / Hampshire Boulevard Amended Site Plan for Removal of Wooden Fences Surrounding Basins Engineer: None Attorney: Joseph A. Kutschman III, Esq./ Christopher Lugara, Esq. Date Complete: Time Waived 9/30/22 Hearing Status: Testimony Given 8/1/22 Eligible: Campbell, Riker, Burnstein, Herman, Canderozzi, Wall, Flemming, Haring, H
Location: 55 Houston Avenue
| Amended Site Plan for Ground Mounted Solar Energy | |
| Engineer: | PDS |
|---|---|
| Attorney: | Adam Pfeffer, Esq. |
| Other: | James A. Clancy, PE |
| Date Complete: | Time Waived 9/30/22 |
| Hearing Status: | Testimony Given 8/15/22 |
| Eligible: Campbell Biker Herman Canderozzi Flemming Riccardi Hudak | |
Eligible: Campbell, Riker, Herman, Canderozzi, Flemming, Riccardi, Hudak
| Location: 443 Leesville Road | |
| P/F Major Subdivision to Subdivide into 4 Lots | |
| Engineer: | PDS |
|---|---|
| Attorney: | Donna Jennings, Esq. |
| Date Complete: | Time Waived 10/4/22 |
| Hearing Status: | Initial Testimony |
| Location: 443 Leesville Road | |
| P/F Major Site Plan to Construct 4 Private Schools | |
| Engineer: | PDS |
|---|---|
| Attorney: | Donna Jennings, Esq. |
| Date Complete: | Time Waived 10/4/22 |
| Initial Testimony | |
Location: Cedar Swamp Road P/F Major Site Plan to Construct 60,023 Square Foot Warehouse Engineer/Architect: Feltz Collins Architecture, LLC Planner: Dynamic Engineering Attorney: Jeffrey R. Chang, Esq. Date Complete: 6/9/22 Hearing Status: Initial Testimony
Location: 233 Grawntown Road P/F Major Subdivision to Create 48 Residential Lots, 1 AH Lot and 1 SW Lot Engineer: PDS Attorney: Adam Pfeffer, Esq. Date Complete: 8/10/22 Hearing Status: Initial Testimony