Site Plan Considerations- Per 2.c. above, Site Plan approval is required for all conditional uses.
Based on the nature of the home occupation use, developed nature of the site and absence of any proposed improvements, the Board may wish to consider:
Waiver of the site plan submission requirement.
Providing guidance to the applicant as to the extent of site plan details and specific areas of concern which need to be addressed in conjunction with any formal Site Plan which is required by the Board.
The applicant's attention is directed to Ordinance Section 244-28 detailing specific submission requirement should a complete formal submission be required by the Board.
Recommendations- Any approval which the Jackson Township Planning Board may grant should be subject to the following conditions being satisfied:
Testimony satisfactory to the Board, supporting the Home Occupation Conditional Use which is proposed.
Submission of a formal site plan application for review and approval unless otherwise modified by the Board.
Please be advised that the comments detailed above are based on our initial review of the application. Additional engineering comments may be forthcoming to subsequent to formal presentation by the applicant and any public comment which is received.
Very truly yours,
Douglas F. Klee, P.E., P.P., C.M.E. Office of the Planning Board Engineer
Office of the Planning Board Engineer
DFK:caa
Cc: L. Morrison, Planning Board Secretary, ( lmorrison@jacksontwpnj.net)
Morrison, Planning Board Secretary, (Imorrison@jacksontwph).net
Shea, Il, Esq., Planning Board Attorney (bcshea@rcshea.com)
Warren (pwarren@rcshea.com)
Bolinsky, Stormwater & Recycling Coordinator, (sbolinsky@jacksontwpnj.n)
Spero, Township Forester (sspero@cmeusa1.com)
Peters, P.E., P.P., C.M.E., Township Planner (ernie.peters@rve.com) Environmental Commission (jjordan@jacksontwpnj.net) Bureau of Fire Prevention (Bureau@jacksonfiredist3.org)
Rauch, Fire Official (srauch@jacksonfiredistrict2.org)
O'Brien, Fire Official (sobrienjr@jacksonfiredistrict4.org) Tyler Morcreia, Applicant (Mocreiat@yahoo.com)
Donner, Esq., Applicant's Attorney (idonner@donnerassociates.com)
Von Steenburg, PLS, Applicant's Surveyor (dvonsteenburg@morganengine.com)
Von Steenburg, PLS, Applicant's Surveyor ( dvonsteenburg@morganengineeringllc.com)