WHEREAS, Jackson Township previously awarded a contract to Eagle Construction and approved previous Change Orders for a current contract amount of $903,395.00 for the project entitled “New Roof & HVAC Replacement” for the Jackson Township Municipal Building; and
WHEREAS, the Township Architect, Robert Krieger, Township Mechanical Engineer, Lou Hegyi and Township Administrator have reviewed said project and recommend approval of Change Order No. 3 for the relocation of an existing water line above Corridor 109 due to the need to install two (2) new supply air diffusers in this corridor and the lack of space above the ceiling, and;
WHEREAS, said Change Order No. 3 in the amount of $1,632.00 will be deducted from the contract contingency thus resulting in a no cost increase to the contract, and;
WHEREAS, it is now the desire of this governing body to approve Change Order No. 3 dated August 29, 2002 to provide for the relocation of an existing water line above Corridor 109 due to the need to install two (2) new supply air diffusers in this corridor and the lack of space above the ceiling, and;
DATED: 09/09/02
ANN MARIE EDEN, R.M.C. TOWNSHIP CLERK
RESOLUTION 470-02
TITLE: RESOLUTION OF THE TOWNSHIP OF JACKSON, OCEAN COUNTY, NEW JERSEY APPROVING AND ACKNOWLEDGING REVIEW OF THE 2001 TOWNSHIP AUDIT