JACKSON TOWNSHIP COMMITTEE MEETING MINUTES SEPTEMBER 9, 2002 of 1
DescriptionAppropriationAuthorizationDown PaymentUseful Life
applicable, of curbs and sidewalks along such roadway;
(iii) Improvements to the parking lot at the Township Municipal Building, including but not limited to, as applicable, excavation, over-excavation, milling, resurfacing and restriping with paint/glass beads of the parking lot using Class A pavement (as defined under the Local Bond Law), and drainage and landscaping work;$187,440.00 (including a $68,642.65 reappropriation)$113,138$5,659.3510 years
(iv) Construction of a foundation for the pistol range trailer utilized by the Police Department, including but not limited to, as applicable, concrete blocks, reinforcing steel, anchor rods, bearing plates, hold down clips, bearing sleeves, concrete, mortar and ground and miscellaneous site work;$8,000.00 (including a $2,929.69 reappropriation)$4,828$242.3115 years
(v) Construction of softball fields on a parcel of real property on Bartley Road being designated as Block 128.01, Lot 32.05 on the Official Tax Map of the Township, including but not limited to, as applicable, excavation, tree removal and other site clearing, grading and seeding, the construction of a paved access road and parking lot including but not limited to, as applicable, site clearing, excavation, milling and surfacing said roadway using Class A pavement (as defined under the Local Bond Law), drainage and landscaping work and the acquisition and installation of various park amenities, including but not limited to, as applicable, benches, bleachers, bicycle racks, water fountain, lighting, waste baskets, signage, landscaping and aesthetic improvements;$300,000.00 (including a $109,863.39 reappropriation)$181,079$9,057.6115 years
(vi) Construction of a retaining wall for the Department of Public Works bulky waste compactor site, including but not limited to, as applicable, excavation, over-excavation, backfill, removal of fences and existing retaining wall, overexcavation, installation of concrete footings, walls and slabs and installation of reinforced steel and a chain link fence; and$100,400.00 (including a $36,767.62 reappropriation)$60,601$3,031.3810 years
(vii) Acquisition of equipment for the Department of Public Works, including but not limited to, as applicable, one (1) rubber tire loader, one (1) 3/4 ton pick-up truck and two (2) material spreaders;$50,000.00 (including a $18,310.57 reappropriation)$30,180$1,509.4315 years