JACKSON TOWNSHIP COMMITTEE MEETING MINUTES AUGUST 26, 2002
Page 7 of 45
Stream Channel: Part of a water course either naturally or artificially created which contains an intermittent or perennial base flow of groundwater origin. Base flows of groundwater origin can be distinguished by any of the following physical indicators:
Hydrophytic vegetation, hydric soil or other hydrologic indicators in the area(s) where groundwater enters the stream channel, in the vicinity of the stream headwaters, channel bed or channel banks
Flowing water not directly related to a storm event
Historical records of a local high groundwater table, such as well and stream gauge records.
Stream Order: A classification system for streams based on stream hierarchy. The smaller the stream, the lower its numerical classification. For example, a first order stream does not have tributaries and normally originates from springs and/or seeps. At the confluence of two first order streams, a second order stream begins, and so on.
Stream System: A stream channel together with one or both of the following:
100-year floodplain and/or
Hydrologically-related non-tidal wetlands
Streams: Perennial and intermittent watercourses identified through site inspection and USGS maps. Perennial streams are those which are depicted on a USGS map with a solid blue line. Intermittent streams are those which are depicted on a USGS map with a dotted blue line.
Applications
Water Pollution Hazard: A land use or activity that causes a relatively high risk of potential water pollution.
This ordinance shall apply to all proposed development except for that development which meets waiver criteria as outlined in Section H of this regulation.
This ordinance shall apply to all timber harvesting activities, except those timber harvesting operations which are implementing a forest management plan which has been deemed to be in compliance with the regulations of the buffer ordinance and has received approval from The Pinelands Commission.
This ordinance shall apply to all surface mining operations except that the design standards shall not apply to active surface mining operations which are operating in compliance with an approved surface mining permit of the Pinelands Commission.
Plan Requirements
In accordance with Section D of this ordinance, a plan approved by the appropriate agency is required for all development, forest harvesting operations, surface mining operations, and agricultural operations.
The plan shall set forth an informative, conceptual and schematic representation of the proposed activity by means of maps, graphs, charts, or other written or drawn documents so as to enable the agency an opportunity to make a reasonably informed decision regarding the proposed activity.