JACKSON TOWNSHIP COMMITTEE MEETING MINUTES AUGUST 26, 2002
Page 22 of 45
DescriptionAppropriationAuthorizationDown PaymentUseful Life
parking lot using Class A pavement (as defined under the Local Bond Law), and drainage and landscaping work;
(iv) Construction of a foundation for the pistol range trailer utilized by the Police Department, including but not limited to, as applicable, concrete blocks, reinforcing steel, anchor rods, bearing plates, hold down clips, bearing sleeves, concrete, mortar and ground and miscellaneous site work;8,000.00n(including a2,929.69 reappropriation)$4,828$242.3115 years
(v) Construction of softball fields on a parcel of real property on Bartley Road being designated as Block 128.01, Lot 32.05 on the Official Tax Map of the Township, including but not limited to, as applicable, excavation, tree removal and other site clearing, grading and seeding, the construction of a paved access road and parking lot including but not limited to, as applicable, site clearing, excavation, milling and surfacing said roadway using Class A pavement (as defined under the Local Bond Law), drainage and landscaping work and the acquisition and installation of various park amenities, including but not limited to, as applicable, benches, bleachers, bicycle racks, water fountain, lighting, waste baskets, signage, landscaping and aesthetic improvements;300,000.00n(including a109,863.39 reappropriation)$181,079$9,057.6115 years
(vi) Construction of a retaining wall for the Department of Public Works bulky waste compactor site, including but not limited to, as applicable, excavation, over-excavation, backfill, removal of fences and existing retaining wall, overexcavation, installation of concrete footings, walls and slabs and installation of reinforced steel and a chain link fence; and100,400.00n(including a36,767.62 reappropriation)$60,601$3,031.3810 years
(vii) Acquisition of equipment for the Department of Public Works, including but not limited to, as applicable, one (1) rubber tire loader, one (1) 3/4 ton pick-up truck and two (2) material spreaders;50,000.00n(including a18,310.57 reappropriation)$30,180$1,509.4315 years
TOTALS$1,145,140.35$691,200$34,577.00
(b) The above improvements and purposes set forth in Section 5(a) shall also include the following, as applicable, surveying, construction planning, engineering and design work, preparation of plans and specifications, permits, bid documents, construction