SAFETY IMPROVEMENTS

Eastbound S.R. 408 to Eastbound I-4 Loop Ramp

Orange County

Financial Project Identification (FPID) No.: 456216-1

PROJECT DESCRIPTION

The Florida Department of Transportation (FDOT) is enhancing safety on the loop ramp from eastbound State Road (S.R.) 408 to eastbound Interstate 4 (I-4) in Orlando. The work includes installing a new barrier wall, milling and resurfacing the roadway, adding pavement markings, and installing new speed signage to alert drivers to slow down while on the ramp.

WHAT TO EXPECT

CONTRACTOR Atlantic Civil Constructors Corp.

PROJECT COST $1.2 million

PROJECT START January 2026

During construction, motorists can expect intermittent closures of the eastbound S.R. 408 to eastbound I-4 loop ramp, along with detours, between 8 p.m. and 6 a.m. Motorists are advised to proceed with caution. Electronic message boards and other signage will direct traffic through the work zone.

The level of work activity and noise will vary during different construction phases. Please note that the construction schedule may change due to inclement weather or other unforeseen circumstances. For the most current project details and lane closure information, please visit FDOT's Central Florida website at www.cflroads.com. CONTRACTOR Atlantic Civil Constructors Corp.

ESTIMATED COMPLETION Summer 2026

FOR QUESTIONS, CONCERNS, OR PROJECT UPDATES Send a request to:

Annabelle Bruzos Vega Community Outreach Specialist 321-319-8130 Annabelle.BruzosVega@dot.state.fl.us

For more information, scan the QR code above or visit the project website at www.cflroads.com/project/ 456216-1

Follow us on social media