| Project Details | |
| Work Type | Resurfacing |
|---|---|
| Phase | Design |
| Limits | SR 50 (Cortez Boulevard) from Wisconsin Road to Cobb Road |
| Length | 3.78 |
| City | Brooksville |
| County | Hernando |
| Road | Cortez Boulevard SR 50 |
Contact Information
Design Manager
Carlos Perez
813-975-6929
CarlosH.Perez@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of State Road (SR) 50 in Hernando County.
Construction is anticipated to begin in Fall 2027.