Tampa Bay Florida Department of Transportation
SR 574 (W Martin Luther King Jr Boulevard) New Traffic Signal at N 12th Street 254677-6-10
Project Details
Work TypeNew Traffic Signal
PhaseCompleted
Limitsat N 12th Street
Project StartSummer 2025
CityTampa
CountyHillsborough
RoadNebraska Avenue (Hillsborough) US 41 US 92
Estimated CompletionSummer 2026
ContractorCone & Graham, Inc.
Contact Information
Project Information
Maddie Griffin 727-575-8334
Maddie.Griffin@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
As of July 25, 2026, all construction activities associated with this project have been completed.
This construction project is addressing safety improvements with the construction of a new traffic signal on SR 574 (W Martin Luther King Jr Boulevard) at N 12th Street in Hillsborough County.
Elements of work shall include, but are not limited to, installation of the signal, roadway resurfacing, and sidewalk, pedestrian and lighting improvements.
Construction activities are underway and expected to be complete in summer 2026.
***** *****
What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously.