SCOPE OF STUDY
In order to prepare a thorough Traffic Impact Analysis for this project, MRA has conducted the following tasks:
- Made field visits to the site to establish existing roadway and traffic conditions in the area.
- Conducted 2021 seasonal (summer) peak hour traffic counts at the following intersections:
- CR 537/CR 526/571
- CR 537/I-195 westbound off-ramp
- CR 537/Pine Drive
- CR 537/U-turn jughandles west of Pine Drive
- Installed automatic traffic recording devices (ATR's) along eastbound and westbound CR 537 in the summer of 2021.
- Reviewed Pre-Covid traffic data along Route 537.
- Prepared trip generation estimates for the proposed uses based upon anticipated activity within the recreational complex and for the restaurant/commercial uses based upon data from the 11^{th} Edition of the Institute of Transportation Engineers (ITE) Trip Generation Manual and trip generation research data.
- Projected traffic volumes to a design year of 2032 in accordance with Ocean County Planning Board protocol.
- Conducted level of service capacity analyses for the following intersections:
CR 537/Pine Drive intersection
CR 537/U-turn jughandles west of Pine Drive intersection
CR 537 and I-195 westbound off-ramp intersection
CR 537 and CR 526/571 intersection
Pine Drive Extension and internal site intersection