General InformationSite Information
AnalystSTKIntersectionNEWARK AVE & n NEW PROSPECT
Agency/Co.MRAJurisdiction
Date Performed10/7/2025East/West StreetNEWARK AVE-SITE ACCESS
Analysis Year2035North/South StreetN NEW PROSPECT
Time AnalyzedPMPeak Hour Factor0.95
Intersection OrientationNorth-SouthAnalysis Time Period (hrs)0.25
Project Description25-143PFB BUILD
Lanes
Image
Vehicle Volumes and Adjustments
ApproachEastboundWestboundNorthboundSouthbound
MovementULTRULTRULTRUL
Priority1011127891U1234U4
Number of Lanes010010001001
ConfigurationLTRLRLTRLTR
Volume (veh/h)15015131558831
Percent Heavy Vehicles (%)3333333
Proportion Time Blocked
Percent Grade (%)00
Right Turn Channelized
Median Type | StorageUndivided
Critical and Follow-up Headways
Base Critical Headway (sec)7.16.56.27.16.24.14.1
Critical Headway (sec)7.136.536.237.136.234.134.13
Base Follow-Up Headway (sec)3.54.03.33.53.32.22.2
Follow-Up Headway (sec)3.534.033.333.533.332.232.23
Delay, Queue Length, and Level of Service
Flow Rate, v (veh/h)324161
Capacity, c (veh/h)160243807954
v/c Ratio0.200.020.020.00
95% Queue Length, Q95 (veh)0.70.10.10.0
95% Queue Length, Q95 (ft)17.92.62.50.0
Control Delay (s/veh)32.920.19.60.30.38.8
Level of Service (LOS)DCAAAA
Approach Delay (s/veh)32.90.0
Approach LOSD20.10.50.0
Copyright © 2025 University of Florida. All Rights Reserved.HCSTM TWSC Version 2025AA
HCS™ TWSC Version 2025 25-143PFB.xtw