| HCS Two-Way Stop-Control Report |
| General Information | Site Information |
| Analyst | STK | Intersection | NEWARK AVE & n NEW PROSPECT |
|---|
| Agency/Co. | MRA | Jurisdiction | |
|---|
| Date Performed | 10/7/2025 | East/West Street | NEWARK AVE-SITE ACCESS |
|---|
| Analysis Year | 2035 | North/South Street | N NEW PROSPECT |
|---|
| Time Analyzed | AM | Peak Hour Factor | 0.95 |
|---|
| Intersection Orientation | North-South | Analysis Time Period (hrs) | 0.25 |
|---|
| Project Description | 25-143AFB BUILD |
|---|
| Lanes |
 |
| Vehicle Volumes and Adjustments |
| Approach | Eastbound | Westbound | Northbound | Southbound |
|---|
| Movement | U | L | T | R | U | L | T | R | U | L | T | R | U | L | T |
|---|
| Priority | | 10 | 11 | 12 | | 7 | 8 | 9 | 1U | 1 | 2 | 3 | 4U | 4 | 5 |
|---|
| Number of Lanes | | 0 | 1 | 0 | | 0 | 1 | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 1 |
|---|
| Configuration | | | LTR | | | | LR | | | | LTR | | | | LTR |
|---|
| Volume (veh/h) | | 24 | 0 | 24 | | 28 | | 22 | | 24 | 432 | 97 | | 68 | 434 |
|---|
| Percent Heavy Vehicles (%) | | 3 | 3 | 3 | | 3 | | 3 | | 3 | | | | 3 | |
|---|
| Proportion Time Blocked | | | | | | | | | | | | | | | |
|---|
| Percent Grade (%) | 0 | 0 | |
|---|
| Right Turn Channelized | | | |
|---|
| Median Type | Storage | Undivided | |
| Critical and Follow-up Headways |
| Base Critical Headway (sec) | | 7.1 | 6.5 | 6.2 | | 7.1 | | 6.2 | | 4.1 | | | | 4.1 | |
|---|
| Critical Headway (sec) | | 7.13 | 6.53 | 6.23 | | 7.13 | | 6.23 | | 4.13 | | | | 4.13 | |
|---|
| Base Follow-Up Headway (sec) | | 3.5 | 4.0 | 3.3 | | 3.5 | | 3.3 | | 2.2 | | | | 2.2 | |
|---|
| Follow-Up Headway (sec) | | 3.53 | 4.03 | 3.33 | | 3.53 | | 3.33 | | 2.23 | | | | 2.23 | |
|---|
| Delay, Queue Length, and Level of Service |
| Flow Rate, v (veh/h) | | | 51 | | | | 53 | | | 25 | | | | 72 | |
|---|
| Capacity, c (veh/h) | | | 225 | | | | 207 | | | 1075 | | | | 1009 | |
|---|
| v/c Ratio | | | 0.22 | | | | 0.25 | | | 0.02 | | | | 0.07 | |
|---|
| 95% Queue Length, Q95 (veh) | | | 0.8 | | | | 1.0 | | | 0.1 | | | | 0.2 | |
|---|
| 95% Queue Length, Q95 (ft) | | | 20.5 | | | | 25.6 | | | 2.5 | | | | 5.0 | |
|---|
| Control Delay (s/veh) | | | 25.6 | | | | 28.2 | | | 8.4 | 0.3 | 0.3 | | 8.8 | 0.9 |
|---|
| Level of Service (LOS) | | | D | | | | D | | | A | A | A | | A | A |
|---|
| Approach Delay (s/veh) | | 25.6 | | | | 28.2 | | | | 0.6 | | | | 1.9 | |
|---|
| Approach LOS | D | D | A | A |
|---|
| Copyright © 2025 University of Florida. All Rights Reserved. HCS™ TWSC Version 2025 Generated: 10/7/2025 12:06:17 PM |