HCS Two-Way Stop-Control Report
General InformationSite Information
AnalystSTKIntersectionNEWARK AVE & n NEW PROSPECT
Agency/Co.MRAJurisdiction
Date Performed10/7/2025East/West StreetNEWARK AVE
Analysis Year2025North/South StreetN NEW PROSPECT
Time AnalyzedAMPeak Hour Factor0.95
Intersection OrientationNorth-SouthAnalysis Time Period (hrs)0.25
Project Description25-143AE EXIST
Lanes
Image
Vehicle Volumes and Adjustments
ApproachEastboundWestboundNorthboundSouthbound
MovementULTRULTRULTRULTR
Priority1011127891U1234U456
Number of Lanes00001000100010
ConfigurationLRTRLT
Volume (veh/h)28223939768395
Percent Heavy Vehicles (%)333
Proportion Time Blocked
Percent Grade (%)0
Right Turn Channelized
Median Type | StorageUndivided
Critical and Follow-up Headways
Base Critical Headway (sec)7.16.24.1
Critical Headway (sec)6.436.234.13
Base Follow-Up Headway (sec)3.53.32.2
Follow-Up Headway (sec)3.533.332.23
Delay, Queue Length, and Level of Service
Flow Rate, v (veh/h)5372
Capacity, c (veh/h)3221045
v/c Ratio0.160.07
95% Queue Length, Q95 (veh)0.60.2
95% Queue Length, Q95 (ft)15.45.1
Control Delay (s/veh)18.48.70.8
Level of Service (LOS)CAA
Approach Delay (s/veh)18.41.9
Approach LOSCA
Copyright © 2025 University of Florida. All Rights Reserved. HCS ™ TWSC Version 2025 Generated: 10/7/2025 11:59:48 AM
HCS™ TWSC Version 2025 25-143AE.xtw