===== PAGE 1 =====
#### N. Turkey Oak Dr. Sidewalk from SR 44 to Bay Avenue 441104-1-52-01
| Project Details |
| Work Type | Sidewalk |
| Phase | Completed |
| Limits | from SR 44 to Bay Avenue |
| Project Start | July 12, 2021 |
| City | Crystal River |
| County | Citrus |
| Construction Cost | $1.3 million |
| Estimated Completion | Spring 2022 |
| Contractor | C.W. Roberts Contracting, Inc. |
Contact Information
Project Information
Austin Petersen
352-848-2600
Austin.Petersen@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
Map data ©2022 Google
## About
All work has been completed and the project was final-accepted from the contractor on April 25, 2022.
The project added a 5 foot sidewalk along N. Turkey Oak Drive between SR 44 and Bay Avenue in the vicinity of Crystal River High School.
Other project improvements included:
- The intersections of Turkey Oak Drive / SR 44 and Turkey Oak Drive / N. Citrus Avenue were repaved. The pedestrian crossings were improved and pedestrian signals were replaced at each of these intersections.
- Widened the turn radius for the eastbound to southbound and southbound to westbound traffic movements at the intersection of N. Turkey Oak Drive and N. Citrus Avenue.
• Resurfaced or reconstructed driveway connections along N. Turkey Oak Drive from Woodbury Court to SR 44.