I-4 Wildlife Crossing Virtual Public Workshop FPID Number: 201214-8-52-01
Florida Department of TRANSPORTATION
Project Schedule and Costs
Project PhasesStatusCost Estimate
Right-of-way acquisitionFall 2021$ 1.3 Million
DesignDecember 2023$ 1.2 Million
ConstructionNot funded$ 8.2 Million
Construction InspectionNot funded$ 1.2 Million
Total Cost$ 11.9 Million
Right-of-way acquisition will occur in Fall 2021 with an estimated cost of 1.3 million dollars.
The design of this project will be completed by December 2023, with an estimated cost of 1.2 million dollars.
Construction for this project is 8.2 million dollars. At this time, construction is not funded. The project's construction inspection is 1.2 million dollars and is not funded.
The total project cost is 11.9 million dollars.