Provide similar examples (1)
Provided Reference Document (2)
Wildlife Permeability along Interstate 4, June 2020
Requests to be added to Contact List (2)
Input for Other Wildlife Crossing Projects (6)
FDOT needs to work with partners to secure additional corridors within the Green Swamp area (1)
Agencies need to look critically at development and road building in the area of University Boulevard (south of the I-4 project) and Old Polk City Road (north of the I-4 project) (1)
Investing in wildlife crossing structures, like the I-4 project, will help secure critical linkages for the endangered Florida panther and other native wildlife (2)
FDOT needs to work with other agencies (such as the Florida Department of Environmental Protection) to acquire and secure additional conservation lands with the Green Swamp and Peace River Refuge Florida Forever projects (1)
FDOT needs to work with partners to secure additional corridors within the Green Swamp area (1)
Next Steps After Virtual Public Workshop
This input will guide the project team as design plans are finalized. It is anticipated that design will be completed in December 2023 with right of way acquisition to occur in fall 2021. At this time, construction is not funded.