===== PAGE 1 ===== # Stormwater Management, Groundwater Recharge and Water Quality Analysis For 1980 Swarthmore LLC 30 S. Hope Chapel Road (CR 547) Block 20901, Lot 15 Township of Jackson Ocean County, New Jersey Prepared by:
Image
D DYNAMIC ENGINEERING 5 Greentree Centre, Suite 406 Marlton, NJ 08053 (732) 974-0198
Image
Rodman R. Ritchie, PE, PP NJ Professional Engineer License #43547 August 2023 Last Revised February 2026 DEC #3342-99-007 ===== PAGE 2 ===== ## TABLE OF CONTENTS Page No. 1. SITE DESCRIPTION AND PROJECT OVERVIEW ..... - 1 2. DESIGN OVERVIEW ..... - 1 3. EXISTING DRAINAGE CONDITIONS ..... - 3 4. PROPOSED DRAINAGE CONDITIONS ..... - 4 5. STORMWATER MANAGEMENT SYSTEM DESIGN ..... - 6 6. GREEN INFRASTRUCTURE COMPLIANCE ..... - 6 7. WATER QUALITY COMPLIANCE ..... - 8 8. GROUNDWATER RECHARGE COMPLIANCE ..... - 8 9. GROUNDWATER MOUNDING ..... - 8 10. PINELANDS NITROGEN REMOVAL REQUIREMENT ..... - 9 11. STORM SEWER DESIGN ..... - 9 12. SOIL EROSION AND SEDIMENT CONTROL COMPLIANCE ..... - 9 13. CONCLUSION ..... - 12 ## APPENDIX • NRCS Web Soil Survey • Hydrograph Summary Reports – Existing & Proposed Conditions 2, 10, & 100-year • Hydrograph Summary Reports – Existing & Proposed Water Quality Storm • Hydrograph Comparison – Study Area Road Undetained 2, 10 & 100-year Stormwater Collection System Calculations (Pipe Sizing) • Conduit Outlet Protection Calculations • Groundwater Recharge Calculation • Groundwater Mounding Calculation - Basin Drain Time Calculations Offsite Stability Failure Analysis Report of Geotechnical & Stormwater Basin Area Investigation, prepared by Dynamic Earth, LLC Drainage Area Maps Nitrogen Removal Exhibit ===== PAGE 3 ===== ### 1. SITE DESCRIPTION AND PROJECT OVERVIEW The subject site is located at 30 South Hope Chapel Road (C.R. 547) in the Township of Jackson, Ocean County, New Jersey. The site is identified as Block 20901, Lot 15 on the Township of Jackson Tax Map Sheet #209. The subject site is currently developed with one 2,164 SF single family home, three one-story garages and a contractor's yard. The property is bounded to the north by residential uses with wooded areas, commercial uses and East Veterans Highway beyond, to the south by Garden Street with residential uses beyond, to the east by S. Hope Chapel (CR 547) with commercial uses beyond, and to the west by residential uses with wooded areas beyond. The proposed project consists of the development of a 3-story office building. The office building will consist of a total footprint of 4,937 SF, and a total square footage of 14,979 SF. The proposed project will also include associated site improvements including parking areas, landscaping, lighting, stormwater management facilities, and utilities. ### 2. DESIGN OVERVIEW This report has been prepared to define and analyze the stormwater drainage conditions that would occur as a result of the development of the subject site. Based upon the fact that the proposed development will result in more than 1 acre of land disturbance, increase in impervious coverage by more than 1/4 acre, and increase motor vehicle surfaces by more than 1/4 acre, this project is classified as a “major development” as defined in NJAC 7:8 and NJAC 7:50. Therefore, the proposed development has been designed to meet the stormwater water runoff quantity, quality, and groundwater recharge standards, as set forth by the Township of Jackson Land Use Ordinance, NJAC 7:8 and NJAC 7:50. The following documents and data were used in the support of the design of the project. - A survey entitled “Boundary, Location & Topographic Survey” prepared by Dynamic Survey, LLC, dated October 22, 2021; - Site Plans entitled “Preliminary and Final Site Plan” prepared by Dynamic Engineering Consultants, PC dated August 25, 2023; Geotechnical Report entitled “Report of Geotechnical & Stormwater Basin Area Investigation Report” prepared by Dynamic Earth, LLC dated June 24, 2022; • NRCS Web Soil Survey NJDEP Stormwater Management Best Management Practices Manual NJDEP New Jersey Pinelands Comprehensive Management Plan ===== PAGE 4 ===== The hydrology for the site was calculated using the NRCS Runoff Equation and Dimensionless Unit Hydrograph as noted in Part 630, Hydrology National Engineering Handbook. The following particular references were used: - Curve Numbers were established via Chapter 9 – Hydrological Soil-Cover Complexes - Time of Concentration were calculated in accordance with Chapter 15 • Rainfall Distributions are based on NOAA Type D rainfall distribution The Delmarva Unit Hydrograph was utilized The rainfall depths are based on Ocean County NOAA Atlas 14 Data as noted below:
Return PeriodNOAA Atlas 14 Rainfall Depth (inches)
2 Year Storm - Current3.42
2 Year Storm - Projected4.04
10 Year Storm - Current5.38
10 Year Storm - Projected6.34
100 Year Storm - Current9.48
100 Year Storm - Projected11.41
Based upon the Ocean County Soil Survey, the soil types native to the site include:
Soil TypeSoil Type NameHydrologic Soil Group
DofgBDowner gravelly sand loam, gravelly substratum, 2 to 5 percent slopesA
Based on the methodology and data noted above a hydrologic evaluation of the NJDEP Water Quality, 2-, 10-, and 100-year storm event was prepared. This report will address compliance with the following standards: • Groundwater Recharge Standards (NJAC 7:50-56.84(a)6.iv(1)) Stormwater Runoff Quality Standards (NJAC 7:8-5.5 and NJAC 7:50-56.84(a)6.iv(6)) Stormwater Runoff Quantity Standards (NJAC 7:8-5.6 and NJAC 7:50-56.84(a)6)) • Calculation of Stormwater Runoff (NJAC 7:8-5.7 and NJAC 7:50-56.84(a)6) • Green Infrastructure Standards (NJAC 7:8-5.3 and NJAC 7:50-56.84(a)6) ===== PAGE 5 ===== ### 3. EXISTING DRAINAGE CONDITIONS The area to be analyzed consists of approximately 1.17 acres and is comprised of mostly grassy area, with a residential building, garages, and asphalt paving. Currently, the stormwater runoff generated by the existing site drains to the western and eastern portions of the site via overland flow. Due to commercial development that occurred since 1981 without application to the Pinelands Commission the subject site has been evaluated using an Historical Area Map from 1972 as depicted in the Existing Drainage Area Map included in the Appendix of this report. ## Point of Analysis #1 – Existing Study Area West Existing Study Area West: This area consists of 1.020 acres and is comprised of mostly grassy area, a one-story house, two (2) garages, and asphalt paving. Under existing conditions, the stormwater runoff generated by the existing site drains to the western portion of the site via overland flow. ## Existing Conditions Input Summary Table
Drainage Area NameDrainage Area (acres)Time of Concentration (minutes)Curve Number (CN)
Ex. Study Area West (Perv)0.938.839
Ex. Study Area West (Imp)0.092.098
Ex. Total1.02--
Existing Conditions Flow Summary Table
Drainage Area NameCurrent Rainfall ConditionsProjected Rainfall Conditions
Q2 (CFS)Q10 (CFS)Q100 (CFS)Q2 (CFS)Q10 (CFS)Q100 (CFS)
Ex. Study Area West Total0.190.301.510.230.452.37
## Point of Analysis #2 - Existing Study Area Road Existing Study Area Road: This area consists of 0.150 acres and is comprised of mostly grassy area, concrete, and asphalt paving as well as a portion of the existing South Hope Chapel Road (C.R. 547) right-of-way along the subject property frontage. Under existing conditions, the stormwater runoff generated by the existing site drains to the eastern portion of the site via overland flow. ===== PAGE 6 =====
Existing Conditions Input Summary Table
Drainage Area NameDrainage Area (acres)Time of Concentration (minutes)Curve Number (CN)
Ex. Study Area Road (Perv)0.121.039
Ex. Study Area Road (Imp)0.031.098
Ex. Total0.15--
Existing Conditions Flow Summary Table
Drainage Area NameCurrent Rainfall ConditionsProjected Rainfall Conditions
Q2 (CFS)Q10 (CFS)Q100 (CFS)Q2 (CFS)Q10 (CFS)Q100 (CFS)
Ex. Study Area Road Total0.060.100.300.080.130.44
### 4. PROPOSED DRAINAGE CONDITIONS The proposed development will incorporate one (1) underground infiltration basin and one (1) manufactured treatment device (MTD) into the layout of the facility for stormwater management. The basin is designed to detain, treat, and infiltrate a portion of stormwater runoff generated by the development in order to meet the stormwater management requirements. The proposed site conditions have been evaluated using the following drainage sub-watershed areas as depicted on the Proposed Drainage Area Map included in the Appendix of this report. ## Point of Analysis #1 – Study Area West Study Area WQ MTD A-110: This area consists of 0.63 acres in the central portion of the site which includes open space and impervious areas. Under proposed conditions, stormwater runoff generated by this area flows to proposed inlets via overland flow and through the pipe conveyance system to the proposed MTD and underground infiltration basin. Stormwater from the basin is released through an outlet control structure to the proposed stormwater conveyance system and discharged via the proposed scour hole. Study Area Roof: This area consists of 0.11 acres in the central portion of the site which includes only the roof of the proposed building. Under proposed conditions, stormwater runoff generated by this area flows to proposed stormwater management infrastructure via channel flow within the proposed roof leader the proposed pipe conveyance system to the proposed underground infiltration basin. Stormwater from the basin ===== PAGE 7 ===== is released through an outlet control structure to the proposed stormwater conveyance system and discharged via the proposed scour hole. Study Area West Undetained: The area consists of 0.31 acres in the northern, southern, and western portions of the site which includes open, grassy areas. Under proposed conditions, stormwater runoff captured in this area will run offsite via overland flow.
Proposed Conditions Input Summary Table
Drainage Area NameDrainage Area (acres)Time of Concentration (minutes)Curve Number (CN)
Study Area WQ MTD A-110 – Imp.0.611.998
Study Area WQ MTD A-110 – Perv.0.022.939
Study Area WQ MTD A-110 – Total0.63----
Study Area Roof – Imp.0.110.898
Study Area Roof – Total0.11----
Study Area West Undetained – Perv.0.312.739
Study Area West Undetained – Total0.31----
Proposed Conditions Flow Summary Table
Drainage Area NameCurrent Rainfall DataProjected Rainfall Data
Q2 (CFS)Q10 (CFS)Q100 (CFS)Q2 (CFS)Q10 (CFS)Q100 (CFS)
Study Area WQ MTD A-110 – Total1.302.053.651.542.424.41
Study Area Basin A – Total1.532.424.301.812.865.20
Study Area West – Total0.000.020.800.000.051.22
## Point of Analysis #2 – Study Area Road Undetained Study Area Road Undetained: The area consists of 0.12 acres in the eastern portion of the site which includes open, grassy areas and asphalt pavement. Under proposed conditions, stormwater runoff captured in this area will run offsite via overland flow. ===== PAGE 8 =====
Proposed Conditions Input Summary Table
Drainage Area NameDrainage Area (acres)Time of Concentration (minutes)Curve Number (CN)
Study Area Road Undetained – Imp.0.040.498
Study Area Road Undetained – Perv.0.084.839
Study Area Road Undetained – Total0.12----
Proposed Conditions Flow Summary Table
Current Rainfall DataProjected Rainfall Data
Q2 (CFS)Q10 (CFS)Q100 (CFS)Q2 (CFS)Q10 (CFS)Q100 (CFS)
Study Area Road Undetained – Total0.080.130.320.100.130.43
### 5. STORMWATER MANAGEMENT SYSTEM DESIGN A summary of each basin's water surface elevation (WSEL) and outflow rated for the Water Quality, 2-, 10-, and 100-year storm event for current conditions are provided below. These WSELs and outflows assume normal operating conditions for each basin. Routing calculations for the basin are included in the Appendix.
Basin A Summary Table
Storm Event (years)Water Surface Elevation (ft)Outflow (CFS)
2-Year Current117.820.70
2- Year Projected117.980.70
10-Year Current118.370.70
10- Year Projected118.680.70
100-Year Current119.501.33
100- Year Projected120.001.62
WQ Storm117.700.70
### 6. GREEN INFRASTRUCTURE COMPLIANCE The basin noted above has been designed to comply with the stormwater runoff quantity, quality, and groundwater recharge requirements for the proposed development as applicable. The basin has been designed in accordance with NJAC 7:8, NJAC 7:50 and the New Jersey Stormwater Best Management Practices. The table below summarizes the design considerations for each basin, see the Site Plan details for additional information. ===== PAGE 9 =====
Small-Scale Infiltration Basins (Table 5-1 – Quantity, Quality, & Recharge)
Design CriteriaRequiredProvided
Total Drainage Area--Basin A: 0.74 Acres
Min. Storage Volume below 1st Orifice (Net Increase of Impervious 10 Year Storm Volume)Basin A: 0.101 ac-ftBasin A: 0.392 ac-ft
Max. Contributory DA2.5 acresBasin A: 0.787 Acres
Max. Drain Time72 hoursBasin A: 24.65 hours
Separation from SHWT2 feetBasin A: 11.7 feet, additional testing required (SPP-1)
Design Permeability RateMin. = 0.5 in/hr\nMax. = 10 in/hrBasin A: 10 in/hr (SPP-1)
Max. Depth of WQ Storm2 feetBasin A: 0.20 ft
Pretreatment80% TSS Removal BMP upstream of Underground Basin AHydro International Up-Flo Filter
### 7. WATER QUANTITY CONTROL COMPLIANCE The site has been designed to meet the flow reduction requirements as noted in NJAC 7:8-5.6(b)3. The points of analysis have been identified on the Drainage Area Maps as previously described. Below is a summary table demonstrating compliance with the flow reduction requirements. Peak Flow Reduction Calculations are included within the appendix of this report.
Point of Analysis #1 (Study Area West)
Storm EventExisting Peak Flow (CFS)Required ReductionMax. Allowable Peak Flow (CFS)Proposed Peak Flow (CFS)
2-Year Current0.250.500.1250.00
2- Year Projected0.230.500.1150.00
10-Year Current0.410.250.2250.01
10- Year Projected0.450.250.3380.04
100-Year Current1.810.201.2080.88
100- Year Projected2.370.201.8961.27
===== PAGE 10 ===== The post-construction runoff hydrographs for the current and projected 2-, 10-, and 100-year storm events do not exceed, at any point in time, the pre-construction runoff hydrographs for the same storm events. Refer to appendix for hydrograph comparisons of this point of analysis. ### 8. WATER QUALITY COMPLIANCE In accordance with NJAC 7:8-5.5, stormwater quality standards are applicable when a major development results in an increase of one-quarter acre or more of regulated motor vehicle surface. The proposed development utilizes the following BMP in order to meet the required 80% TSS removal rate as annual average:
Green Infrastructure BMPTSS Removal Rate per BMP Manual
Hydro International Up-Flo Filter80%
### 9. GROUNDWATER RECHARGE COMPLIANCE The project has been designed to satisfy the groundwater recharge requirements set forth in NJAC 7:50-56.84(a)6.iv(1) by infiltrating the total runoff generated from the net increase in impervious surfaces by a 10-year, 24-hour storm. HydroCAD Stormwater Modeling Software has been utilized to verify satisfaction of the recharge requirement. Groundwater Recharge Calculations are included within the appendix of this report.
Groundwater Recharge Summary
Pre-Development 10-Year Impervious Volume0.046 AC-FT
Post-Development 10-Year Impervious Volume0.366 AC-FT
Net Volume to be Infiltrated0.320 AC-FT
Volume below Lowest Orifice0.392 AC-FT
### 10. GROUNDWATER MOUNDING The proposed underground infiltration basin has been designed to retain and infiltrate the total runoff volume generated from the net increase in impervious surfaces by the 10-year, 24-hour storm, per NJAC 7:50 requirements. The total volume that is required to be retained and infiltrated is 13,939 cubic feet. The volume requirement is met by modeling exfiltration within HydroCAD for the proposed underground infiltration basin. This provides approximately 17,075 cubic feet of water to be infiltrated during the 10-year projected rainfall event. When utilizing the infiltrated volume the maximum mound during the 10-year storm is 8.664 feet. Seasonal High Groundwater was not encountered during the field tests, therefore the termination elevation for SPP-1 (105.8) was used to determine the approximate height of the mound during the 10-year storm. The mound during the 10-year storm could reach a maximum elevation of 114.46 which is 3.04 feet below the ===== PAGE 11 ===== proposed bottom of basin (elevation 117.50). Therefore, no negative impacts are anticipated. The ground water mounding calculations can be found in the appendix of this report. ### 11. PINELANDS NITROGEN REMOVAL REQUIREMENT The project has been designed to satisfy the Nitrogen removal requirements set forth in NJAC 7:50 through the use of an underground basin with a manufactured treatment device. The grading and stormwater conveyance system has been designed to route runoff from motor vehicle surface, landscaped areas and roofs to a proposed underground basin with a MTD to comply with the required nitrogen removal of 53.2%, the proposed Nitrogen removal rate is 59.0%. Further it is noted that the proposed roof and sidewalk areas are not generating nitrogen; therefore 100% nitrogen removal has been provided within those areas. The Pinelands Nitrogen Removal calculations and Exhibit can be found in the Appendix of this report. ### 12. STORM SEWER DESIGN The proposed stormwater management collection system has been designed to have hydraulic capacity for the 25-year storm event. The Rational Method was used to determine inflow rates to each structure and Manning's Equation was used to establish pipe capacity. In accordance with the NJDEP BMP Manual Chapter 5, weighted runoff coefficients were computed for each drainage area based on land cover and hydrologic soil group. The time of concentration was calculated for each area. Rainfall intensity was based upon the Trenton Rainfall intensity curve. Supporting calculations and the Inlet Drainage Area Map can be found in the appendix. ### 13. SOIL EROSION AND SEDIMENT CONTROL COMPLIANCE The project has been designed to comply with the Standards for Soil Erosion and Sediment Control in New Jersey. Soil erosion control measures such as a stabilized construction entrance, inlet protection and silt fence are shown on the plans. In addition, conduit outlet protection is proposed at the outflow point of the storm sewer system with supporting calculations included in the Appendix of this report. Finally, this project has been designed to satisfy the off-site stability standards set forth in the Standards for Soil Erosion and Sediment Control in New Jersey. As noted previously, the proposed peak flows meet the necessary requirements set forth in NJAC 7:8-5.6 and NJAC 7:50-56.84(a)6), thereby achieving off-site stability. Special consideration shall be given to the use of infiltration for peak flow modifications as follows: ===== PAGE 12 ===== When infiltration practices are proposed, an alternate analysis (failure analysis) must be provided which ignores infiltration (no dead storage volume available, no static or dynamic infiltration loss rates in the routing calculations, etc.) and demonstrates that no erosion will occur at the point of discharge if infiltration fails to function. Flow rates based solely upon basin inlet and outlet hydraulics must be used in comparison to Table 21-1 (below) to document a stable outlet. A failure analysis has been provided within the Appendix of this report, which ignores infiltration and demonstrates that no erosion will occur at the point of discharge if infiltration fails to function. To summarize, when disregarding any infiltration and dead storage within the proposed basin the peak outflow for the 25 year storm is 1.06 CFS which complies with the point discharge requirements within the Standards for Soil Erosion and Sediment Control in New Jersey. ## Downstream (Off-Site) Stability Analysis Infiltration may be used to meet peak flow reduction requirements (outlined below) for the purposes of documenting stability of the downstream receiving channel, provided that the complete loss of infiltration function does not result in an increase in peak flow values above the predevelopment levels. Analysis below the points of discharge to the downstream receiving channel have been provided below. Point of Discharge - Methods for Achieving Stability ### 1. Well-defined waterway below the point of discharge: There is a well-defined waterway (Dove Mill Branch Tributary) below the point of discharge; therefore, this method will be used. A. Retain pre-developed runoff characteristics. Do not increase the rate of runoff from the development. As documented in the subsections above, there is a decrease in the rate of runoff from the development to all points of analysis. B. Analyze the waterway or channel for stability under the planned rate of discharge using the Standard for Grassed Waterways or Standard for Channel Stabilization, as appropriate. Peak flows from the 2-and 10-year storms shall be analyzed. ===== PAGE 13 ===== As noted above, the proposed peak flows meet the above reductions, thereby achieving off-site stability, therefore; this section is not applicable. C. Modify the waterway or channel to a stable design condition. As noted above, the proposed peak flows meet the above reductions, thereby achieving off-site stability, therefore; this section is not applicable. ## Downstream of the Point of Discharge (Off-Site Stability Analysis) In addition to ensuring erosion does not occur at the point of discharge, areas downstream and beyond the immediate area of site development may be damaged due to erosive forces resulting from extended duration of hydrograph peak flows. An unintended consequence of the practice of detaining and slowly releasing stormwater is the ability for peak flows to be sustained for longer periods of time, offering an opportunity for upstream discharges to coincide with project site discharges. The resulting combined discharge may be equal to or even exceed that of the pre-development condition. To limit the potential for such an occurrence the designer may choose either of two approaches for downstream stability protection: 1. Examine hydraulic characteristics of the receiving stream channel considering upstream discharge in combination with site discharge to assess channel stability. The scope and scale of the analysis shall be appropriate to the scale of the project and the post development peak discharge rate and volume. Of particular concern are hydraulic control points, (culverts, bridges, etc.), bends in streams and sudden changes in channel cross sections downstream of the discharge point. The following may be utilized to assess stability: The proposed design utilizes approach 2 as described below. 2. In lieu of performing a comprehensive watershed analysis, design a detention facility that reduces peak flows to the following levels. Infiltration may be used to meet these criteria: 2-year storm – 50% of the predevelopment peak 10-year storm – 75% of the predevelopment peak ===== PAGE 14 ===== The post-construction runoff hydrographs for the current and projected two-, 10-, and 100-year storm events do not exceed, at any point in time, the pre-construction runoff hydrographs for the same storm events. Reductions in peak flows are to be compared to pre-developed drainage area points of discharge in the event that drainage is re-directed in the post developed condition. Reductions are only required of the developed or modified portions of the project site. As documented in the subsections above, the proposed peak flows meet the above reductions, thereby achieving off-site stability. ### 14. CONCLUSION The proposed development has been designed to control stormwater runoff in a manner consistent with the existing drainage patterns. In addition, the proposed development satisfies the runoff quantity, quality and groundwater recharge requirements set forth by the Township of Jackson Land Use Ordinance, Pinelands CMP and NJAC 7:8 through the use of the proposed small-scale underground infiltration basins. With this stated, it is evident that the proposed development will not have a negative impact on the existing drainage conditions, water quality or groundwater recharge on-site or within the vicinity of the subject site. ===== PAGE 15 ===== APPENDIX ===== PAGE 16 ===== NRCS WEB SOIL SURVEY ===== PAGE 17 =====
Image
===== PAGE 18 ===== ## MAP LEGEND Area of Interest (AOI) Soils
Image
## MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Ocean County, New Jersey Survey Area Data: Version 20, Aug 30, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 4, 2022—Jul 22, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. ===== PAGE 19 ===== ## Hydrologic Soil Group
Map unit symbolMap unit nameRatingAcres in AOIPercent of AOI
DofgBDowner gravelly sandy loam, gravelly substratum, 2 to 5 percent slopesA1.2100.0%
Totals for Area of Interest1.2100.0%
## Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. ## Rating Options Aggregation Method: Dominant Condition ===== PAGE 20 ===== Component Percent Cutoff: None Specified Tie-break Rule: Higher ===== PAGE 21 ===== HYDROGRAPH SUMMARY REPORTS – EXISTING & PROPOSED CONDITIONS 2, 10, & 100-YEAR ===== PAGE 22 =====
Image
Routing Diagram for 2026-02 Existing and Proposed Prepared by Dynamic Engineering, Printed 2/10/2026 HydroCAD® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLC ## Project Notes Rainfall events imported from "NJ-Rain.txt" for 6614 NJ Ocean-D Rainfall events imported from "NRCS-Rain.txt" for 6614 NJ Ocean-D Rainfall events imported from "NJ-Rain.txt" for 6614 NJ Ocean-D Rainfall events imported from "NJ-Rain.txt" for 6614 NJ Ocean-D Rainfall events imported from "NJ-Rain.txt" for 6614 NJ Ocean-D Defined 1 rainfall events from NJ-DEP IDF Defined 1 rainfall events from NJ-DEP IDF ===== PAGE 23 =====
2026-02 Existing and Proposed
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\textregistered 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLCPage 3
2026-02 Existing and Proposed Prepared by Dynamic Engineering HydroCAD\textregistered 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLCPrinted 2/10/2026 Page 4
Rainfall Events Listing (selected events)
Event#Event NameStorm TypeCurveModeDuration (hours)B/BDepth (inches)AMC
12-Year-CurrentNOAA 24-hrDDefault24.0013.422
22-Year-ProjectedNOAA 24-hrDDefault24.0014.042
310-Year-CurrentNOAA 24-hrDDefault24.0015.382
410-Year-ProjectedNOAA 24-hrDDefault24.0016.342
5100-Year-CurrentNOAA 24-hrDDefault24.0019.482
6100-Year-ProjectedNOAA 24-hrDDefault24.00111.412
Area Listing (selected nodes)
Area (acres)CNDescription (subcatchment-numbers)
1.47039>75% Grass cover, Good, HSG A (3S, 7S, 11S, 14S, 19S)
0.71098Paved parking, HSG A (4S, 6S, 10S, 12S)
0.16098Roofs, HSG A (4S, 15S)
2.34061TOTAL AREA
===== PAGE 24 =====
2026-02 Existing and Proposed Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD ® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLC Page 52026-02 Existing and Proposed Prepared by Dynamic Engineering
HydroCAD ® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLC
Soil Listing (selected nodes)Ground Covers (selected nodes)
Area (acres)Soil GroupSubcatchment NumbersHSG-A (acres)HSG-B (acres)HSG-C (acres)HSG-D (acres)Other (acres)Total (acres)Ground CoverSubcatchment Numbers
2.340HSG A3S, 4S, 6S, 7S, 10S, 11S, 12S, 14S, 15S, 19S1.4700.0000.0000.0000.0001.470>75%Grass cover, Good
0.000HSG B3S, 7S, 11S,
0.000HSG C14S,
0.000HSG D19S
0.000Other0.7100.0000.0000.0000.0000.710Paved parking4S, 6S,
2.340TOTAL AREA10S, 12S
0.1600.0000.0000.0000.0000.160Roofs4S, 15S
2.3400.0000.0000.0000.0002.340TOTAL AREA
===== PAGE 25 =====
Pipe Listing (selected nodes)
Line#Node NumberIn-Invert (feet)Out-Invert (feet)Length (feet)Slope (ft/ft)nWidth (inches)Diam/Height (inches)Inside-Fill (inches)Node Name
110S0.000.00297.00.00350.0110.015.00.0
211S0.000.00297.00.00350.0110.015.00.0
315S0.000.00207.00.01000.0100.08.00.0
421P117.50117.4022.00.00450.0130.015.00.0
Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment3S: Ex. Study Area WestRunoff Area=0.930 ac 0.00% Impervious Runoff Depth=0.01" Flow Length=98' Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Subcatchment4S: Ex. Study Area WestRunoff Area=0.090 ac 100.00% Impervious Runoff Depth=3.19" Flow Length=248' Tc=10.0 min CN=98 Runoff=0.19 cfs 0.024 af
Subcatchment6S: Ex. Study Area RoadRunoff Area=0.030 ac 100.00% Impervious Runoff Depth=3.19" Flow Length=82' Slope=0.0150 ' /" Tc=10.0 min CN=98 Runoff=0.06 cfs 0.008 af
Subcatchment7S: Ex. Study Area RoadRunoff Area=0.120 ac 0.00% Impervious Runoff Depth=0.01" Flow Length=61' Slope=0.0100 ' /" Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Subcatchment10S: Study Area WQ MTDRunoff Area=0.610 ac 100.00% Impervious Runoff Depth=3.19" Flow Length=352' Tc=10.0 min CN=98 Runoff=1.30 cfs 0.162 af
Subcatchment11S: Study Area WQ MTDRunoff Area=0.020 ac 0.00% Impervious Runoff Depth=0.01" Flow Length=351' Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Subcatchment12S: Study Area RoadRunoff Area=0.030 ac 100.00% Impervious Runoff Depth=3.19" Flow Length=35' Slope=0.0322 ' /" Tc=10.0 min CN=98 Runoff=0.06 cfs 0.008 af
Subcatchment14S: Study Area WestRunoff Area=0.310 ac 0.00% Impervious Runoff Depth=0.01" Flow Length=48' Slope=0.0850 ' /" Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Subcatchment15S: Study Area Roof (Imp)Runoff Area=0.110 ac 100.00% Impervious Runoff Depth=3.19" Flow Length=207' Slope=0.0100 ' /" Tc=10.0 min CN=98 Runoff=0.23 cfs 0.029 af
Subcatchment19S: Study Area RoadRunoff Area=0.090 ac 0.00% Impervious Runoff Depth=0.01" Flow Length=58' Slope=0.0300 ' /" Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Pond 21P: Basin A Routing (StormBrixx) Discarded=0.70 cfsPeak Elev=117.82' Storage=937 cf Inflow=1.53 cfs 0.191 af 0.191 af Primary=0.00 cfs 0.000 af Outflow=0.70 cfs 0.191 af
Link 5L: Ex Study Area West (Total)Inflow=0.19 cfs 0.024 af Primary=0.19 cfs 0.024 af
Link 8L: Existing Study Area Road (Total)Inflow=0.06 cfs 0.008 af Primary=0.06 cfs 0.008 af
Link 10L: Study Area Study Area WQ MTD A-110 (Total)Inflow=1.30 cfs 0.162 af Primary=1.30 cfs 0.162 af
Link 14L: Study Area West (Total)Inflow=0.00 cfs 0.000 af Primary=0.00 cfs 0.000 af
Link 16L: Study Area Basin A (Total)Inflow=1.53 cfs 0.191 af Primary=1.53 cfs 0.191 af
===== PAGE 26 =====
2026-02 Existing and Proposed Prepared by Dynamic Engineering HydroCAD\circledR 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLCNOAA 24-hr D 2-Year-Current Rainfall=3.42" Printed 2/10/2026 Page 10
2026-02 Existing and Proposed Prepared by Dynamic Engineering HydroCAD\circledR 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLCNOAA 24-hr D 2-Year-Current Rainfall=3.42" Printed 2/10/2026 Page 9
Link 18L: Study Area Road Undetained (Total)Inflow=0.06 cfs 0.008 af Primary=0.06 cfs 0.008 af
Total Runoff Area = 2.340 ac Runoff Volume = 0.232 af Average Runoff Depth = 1.19' 62.82% Pervious = 1.470 ac 37.18% Impervious = 0.870 ac
Summary for Subcatchment 3S: Ex. Study Area West (Perv)
Runoff =0.00 cfs @24.00 hrs, Volume=
Routed to Link 5L :Ex Study Area West (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Current Rainfall=3.42"
Area (ac)CNDescription
0.93039>75% Grass cover, Good, HSG A
0.93039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
8.4470.03500.09Sheet Flow, A-B\nWoods: Light underbrush n= 0.400 P2= 4.04" Using McCuen-Spiess flow length
0.4510.02002.28Shallow Concentrated Flow, B-C\nUnpaved Kv= 16.1 fps
8.898Total, Increased to minimum Tc = 10.0 min
Subcatchment 3S: Ex. Study Area West (Perv)
Image
===== PAGE 27 ===== ### Summary for Subcatchment 4S: Ex. Study Area West (Imp)
Runoff = 0.19 cfs @ 12.19 hrs, Volume= 0.024 af, Depth= 3.19" Routed to Link 5L : Ex Study Area West (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Current Rainfall=3.42"
Area (ac)CNDescription
0.04098Paved parking, HSG A
0.05098Roofs, HSG A
0.09098Weighted Average
0.09098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.91000.03001.82Sheet Flow, A-B\nSmooth surfaces n= 0.011 P2= 4.04"
1.11480.02002.28Shallow Concentrated Flow, B-C\nUnpaved Kv= 16.1 fps
2.0248TotalIncreased to minimum T= 10.0 min
2.0 248 Total, Increased to minimum Tc = 10.0 min
Subcatchment 4S: Ex. Study Area West (Imp)
Image
2026-02 Existing and ProposedNOAA 24-hr D 2-Year-Current Rainfall=3.42"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 12
### Summary for Subcatchment 6S: Ex. Study Area Road (Imp) Runoff = 0.06 cfs @ 12.19 hrs, Volume= 0.008 af, Depth= 3.19" Routed to Link 8L : Existing Study Area Road (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Current Rainfall=3.42"
Area (ac)CNDescription
0.03098Paved parking, HSG A
0.03098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)
1.0820.01501.32
Sheet Flow, A-B
Smooth surfacesn= 0.011 P2= 4.04"
1.082TotalIncreased to minimum Tc = 10.0 min
1.0 82 Total, Increased to minimum Tc = 10.0 min
Subcatchment 6S: Ex. Study Area Road (Imp)
Image
===== PAGE 28 ===== ### Summary for Subcatchment 7S: Ex. Study Area Road (Perv) Runoff = 0.00 cfs @ 24.00 hrs, Volume= 0.000 af, Depth= 0.01" Routed to Link 8L : Existing Study Area Road (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Current Rainfall=3.42"
Area (ac)CNDescription
0.12039>75% Grass cover, Good, HSG A
0.12039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
1.0610.0100 1.06
Sheet Flow, A-B
Smooth surfaces
1.0 61 Total, Increased to minimum Tc = 10.0 min
Subcatchment 7S: Ex. Study Area Road (Perv)
Image
2026-02 Existing and ProposedNOAA 24-hr D 2-Year-Current Rainfall=3.42"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 14
## Summary for Subcatchment 10S: Study Area WQ MTD A-110 (Imp)
Runoff = 1.30 cfs @ 12.19 hrs, Volume= 0.162 af, Depth= 3.19"
Routed to Link 10L : Study Area Study Area WQ MTD A-110 (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs
NOAA 24-hr D 2-Year-Current Rainfall=3.42"
Area (ac)CNDescription
0.61098Paved parking, HSG A
0.61098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.6550.03021.62Sheet Flow, A-B\nSmooth surfaces n= 0.011 P2= 4.04"
1.32970.00353.684.52Pipe Channel, B-C\n15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31'\nn= 0.011 Concrete pipe, straight & clean
1.9 352 Total, Increased to minimum Tc = 10.0 min
Subcatchment 10S: Study Area WQ MTD A-110 (Imp)
Hydrograph
Image
Image
===== PAGE 29 ===== ## Summary for Subcatchment 11S: Study Area WQ MTD A-110 (Perv) Runoff = 0.00 cfs @ 24.00 hrs, Volume= 0.000 af, Depth= 0.01" Routed to Link 10L : Study Area Study Area WQ MTD A-110 (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Current Rainfall=3.42"
Area (ac)CNDescription
0.02039>75% Grass cover, Good, HSG A
0.02039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
1.480.01250.10Sheet Flow, A-B\nGrass: Short n= 0.150 P2= 4.04"
0.2460.03803.96Shallow Concentrated Flow, B-C\nPaved Kv= 20.3 fps
1.32970.00353.684.52Pipe Channel, C-D\n15.0" Round Area= 1.2 sf Perm= 3.9' r= 0.31'\nn= 0.011 Concrete pipe, straight & clean
2.9 351 Total, Increased to minimum Tc = 10.0 min
Subcatchment 11S: Study Area WQ MTD A-110 (Perv)
Image
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours)
2026-02 Existing and ProposedNOAA 24-hr D 2-Year-Current Rainfall=3.42"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 16
## Summary for Subcatchment 12S: Study Area Road Undetained (Imp)
Runoff = 0.06 cfs @ 12.19 hrs, Volume= 0.008 af, Depth= 3.19" Routed to Link 18L : Study Area Road Undetained (Total)
Runoff = 0.06 cfs @ 12.19 hrs, Volume= 0.008 af, Depth= 3.19" Routed to Link 18L : Study Area Road Undetained (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Current Rainfall=3.42"
Area (ac)CNDescription
0.03098Paved parking, HSG A
0.03098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)
0.4350.03221.52
Sheet Flow, A-B
Smooth surfacesn= 0.011
P2= 4.04"
0.4 35 Total, Increased to minimum Tc = 10.0 min
Subcatchment 12S: Study Area Road Undetained (Imp)
Image
===== PAGE 30 ===== ## Summary for Subcatchment 14S: Study Area West Undetained Runoff = 0.00 cfs @ 24.00 hrs, Volume= 0.000 af, Depth= 0.01" Routed to Link 14L : Study Area West (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Current Rainfall=3.42"
Area (ac)CNDescription
0.31039>75% Grass cover, Good, HSG A
0.31039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
2.7480.08500.29Sheet Flow, A-B\nGrass: Short n= 0.150 P2= 4.04"
2.7 48 Total, Increased to minimum Tc = 10.0 min
Subcatchment 14S: Study Area West Undetained
Image
2026-02 Existing and ProposedNOAA 24-hr D 2-Year-Current Rainfall=3.42"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 18
## Summary for Subcatchment 15S: Study Area Roof (Imp)
Runoff = 0.23 cfs @ 12.19 hrs, Volume= 0.029 af, Depth= 3.19"
Routed to Link 16L : Study Area Basin A (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Current Rainfall=3.42"
Area (ac)CNDescription
0.11098Roofs, HSG A
0.11098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.82070.01004.501.57Pipe Channel, A-B\n8.0" Round Area= 0.3 sf Perm= 2.1' r= 0.17'\nn= 0.010 PVC, smooth interior
0.8 207 Total, Increased to minimum Tc = 10.0 min
Subcatchment 15S: Study Area Roof (Imp)
Image
===== PAGE 31 ===== ## Summary for Subcatchment 19S: Study Area Road Undetained (Perv) Runoff = 0.00 cfs @ 24.00 hrs, Volume= 0.000 af, Depth= 0.01" Routed to Link 18L : Study Area Road Undetained (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Current Rainfall=3.42"
Area (ac)CNDescription
0.09039>75% Grass cover, Good, HSG A
0.09039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
4.8580.0300 0.20
Sheet Flow, A-B
Grass: Short n= 0.150 P2= 4.04"
4.858Total. Increased to minimum Tc = 10.0 min
Subcatchment 19S: Study Area Road Undetained (Perv)
Image
2026-02 Existing and ProposedNOAA 24-hr D 2-Year-Current Rainfall=3.42"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 20
## Summary for Pond 21P: Basin A Routing (StormBrixx)
Inflow Area =0.740 ac, 97.30% Impervious, Inflow Depth = 3.10" for 2-Year-Current event
Inflow =1.53 cfs @ 12.19 hrs, Volume= 0.191 af
Outflow =0.70 cfs @ 12.56 hrs, Volume= 0.191 af, Atten= 54%, Lag= 22.1 min
Discarded =0.70 cfs @ 12.56 hrs, Volume= 0.191 af
Primary =0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 14L : Study Area West (Total)
Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 117.82' @ 12.56 hrs Surf.Area= 3,001 sf Storage= 937 cf Plug-Flow detention time=6.8 min calculated for 0.191 af (100% of inflow) Center-of-Mass det. time=6.8 min (773.5 - 766.7)
VolumeInvertAvail.StorageStorage Description
#1A117.50'0 cf31.63'W x 94.88'L x 3.00'H Field A
#2A117.50'8,729 cf8,999 cf Overall - 8,999 cf Embedded = 0 cf x 40.0% Voids\nACO StormBrixx SD 1 x 384 Inside #1\nInside = 23.7"W x 36.0"H => 5.75 sf x 3.95'L = 22.7 cf\nOutside = 23.7"W x 36.0"H => 5.93 sf x 3.95'L = 23.4 cf\n384 Chambers in 16 Rows
8,729 cf Total Available Storage
Storage Group A created with Chamber Wizard
DeviceRoutingInvertOutlet Devices
#1Primary117.50'15.0" Round Culvert\nL= 22.0' RCP, groove end projecting, Ke= 0.200\nInlet / Outlet Invert= 117.50' / 117.40' S= 0.0045 '/\nCc= 0.900\nn= 0.013, Flow Area= 1.23 sf
#2Device 1118.81'6.0" Vert. Orifice C= 0.600 Limited to weir flow at low heads
#3Discarded117.50'10.000 in/hr Exfiltration over Surface area\nConductivity to Groundwater Elevation = -4.00'
Discarded OutFlow Max=0.70 cfs @ 12.56 hrs HW=117.82' (Free Discharge)\n—3=Exfiltration ( Controls 0.70 cfs)
Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=117.50' (Free Discharge)\n—1=Culvert ( Controls 0.00 cfs)\n—2=Orifice ( Controls 0.00 cfs)
===== PAGE 32 ===== ## Pond 21P: Basin A Routing (StormBrixx) - Chamber Wizard Field A Chamber Model = ACO StormBrixx SD 1 (ACO StormBrixx® SD) Inside = 23.7" W × 36.0" H => 5.75 sf × 3.95' L = 22.7 cf Outside = 23.7" W × 36.0" H => 5.93 sf × 3.95' L = 23.4 cf 24 Chambers/Row x 3.95' Long = 94.88' Row Length 16 Rows x 23.7" Wide = 31.63' Base Width 36.0" Chamber Height = 3.00' Field Height 384 Chambers x 22.7 cf = 8.728.7 cf Chamber Storage 384 Chambers x 23.4 cf = 8.998.6 cf Displacement Chamber Storage = 8,728.7 cf = 0.200 af Overall Storage Efficiency = 97.0% Overall System Size = 94.88' x 31.63' x 3.00' 384 Chambers 333.3 cy Field
Image
Pond 21P: Basin A Routing (StormBrixx)
Image
Image
Inflow Outflow Discarded Primary 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ===== PAGE 33 ===== ## Summary for Link 5L: Ex Study Area West (Total)
Inflow Area =1.020 ac,8.82% Impervious,Inflow Depth = 0.29" for 2-Year-Current event
Inflow =0.19 cfs @12.19 hrs,Volume= 0.024 af
Primary =0.19 cfs @12.19 hrs,Volume= 0.024 af,Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 5L: Ex Study Area West (Total)
Image
## Summary for Link 8L: Existing Study Area Road (Total)
Inflow Area =0.150 ac, 20.00% Impervious, Inflow Depth = 0.64" for 2-Year-Current event
Inflow =0.06 cfs @ 12.19 hrs, Volume= 0.008 af
Primary =0.06 cfs @ 12.19 hrs, Volume= 0.008 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 8L: Existing Study Area Road (Total)
Image
===== PAGE 34 ===== ## Summary for Link 10L: Study Area Study Area WQ MTD A-110 (Total) Inflow Area = 0.630 ac, 96.83% Impervious, Inflow Depth = 3.09" for 2-Year-Current event Inflow = 1.30 cfs @ 12.19 hrs, Volume = 0.162 af Primary = 1.30 cfs @ 12.19 hrs, Volume = 0.162 af, Atten = 0%, Lag = 0.0 min Routed to Link 16L : Study Area Basin A (Total) Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs Fixed water surface Elevation= 117.75'
Link 10L: Study Area Study Area WQ MTD A-110 (Total)
Image
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ## Summary for Link 14L: Study Area West (Total)
Inflow Area =1.050 ac, 68.57% Impervious, Inflow Depth = 0.00" for 2-Year-Current event
Inflow =0.00 cfs @ 24.00 hrs, Volume= 0.000 af
Primary =0.00 cfs @ 24.00 hrs, Volume= 0.000 af, Atten= 0%. Laq= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 14L: Study Area West (Total)
Image
===== PAGE 35 ===== ## Summary for Link 16L: Study Area Basin A (Total)
Inflow Area =0.740 ac, 97.30% Impervious, Inflow Depth = 3.10" for 2-Year-Current event
Inflow =1.53 cfs @ 12.19 hrs, Volume= 0.191 af
Primary =1.53 cfs @ 12.19 hrs, Volume= 0.191 af, Atten= 0%, Lag= 0.0 min
Routed to Pond 21P : Basin A Routing (StormBrixx)
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 16L: Study Area Basin A (Total)
Image
## Summary for Link 18L: Study Area Road Undetained (Total)
Inflow Area =0.120 ac, 25.00% Impervious, Inflow Depth = 0.80" for 2-Year-Current event
Inflow =0.06 cfs @ 12.19 hrs, Volume= 0.008 af
Primary =0.06 cfs @ 12.19 hrs, Volume= 0.008 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 18L: Study Area Road Undetained (Total)
Image
===== PAGE 36 =====
Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment3S: Ex. Study Area WestRunoff Area=0.930 ac 0.00% Impervious Runoff Depth=0.05" Flow Length=98' Tc=10.0 min CN=39 Runoff=0.01 cfs 0.004 af
Subcatchment4S: Ex. Study Area WestRunoff Area=0.090 ac 100.00% Impervious Runoff Depth=3.81" Flow Length=248' Tc=10.0 min CN=98 Runoff=0.23 cfs 0.029 af
Subcatchment6S: Ex. Study Area RoadRunoff Area=0.030 ac 100.00% Impervious Runoff Depth=3.81" Flow Length=82' Slope=0.0150 /" Tc=10.0 min CN=98 Runoff=0.08 cfs 0.010 af
Subcatchment7S: Ex. Study Area RoadRunoff Area=0.120 ac 0.00% Impervious Runoff Depth=0.05" Flow Length=61' Slope=0.0100 /" Tc=10.0 min CN=39 Runoff=0.00 cfs 0.001 af
Subcatchment10S: Study Area WQ MTDRunoff Area=0.610 ac 100.00% Impervious Runoff Depth=3.81" Flow Length=352' Tc=10.0 min CN=98 Runoff=1.54 cfs 0.193 af
Subcatchment11S: Study Area WQ MTDRunoff Area=0.020 ac 0.00% Impervious Runoff Depth=0.05" Flow Length=351' Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Subcatchment12S: Study Area RoadRunoff Area=0.030 ac 100.00% Impervious Runoff Depth=3.81" Flow Length=35' Slope=0.0322 /" Tc=10.0 min CN=98 Runoff=0.08 cfs 0.010 af
Subcatchment14S: Study Area WestRunoff Area=0.310 ac 0.00% Impervious Runoff Depth=0.05" Flow Length=48' Slope=0.0850 /" Tc=10.0 min CN=39 Runoff=0.00 cfs 0.001 af
Subcatchment15S: Study Area Roof (Imp)Runoff Area=0.110 ac 100.00% Impervious Runoff Depth=3.81" Flow Length=207' Slope=0.0100 /" Tc=10.0 min CN=98 Runoff=0.28 cfs 0.035 af
Subcatchment19S: Study Area RoadRunoff Area=0.090 ac 0.00% Impervious Runoff Depth=0.05" Flow Length=58' Slope=0.0300 /" Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Pond 21P: Basin A Routing (StormBrixx) Discarded=0.70 cfsPeak Elev=117.98' Storage=1,394 cf Inflow=1.81 cfs 0.228 af 0.228 af Primary=0.00 cfs 0.000 af Outflow=0.70 cfs 0.228 af
Link 5L: Ex Study Area West (Total)Inflow=0.23 cfs 0.032 af Primary=0.23 cfs 0.032 af
Link 8L: Existing Study Area Road (Total)Inflow=0.08 cfs 0.010 af Primary=0.08 cfs 0.010 af
Link 10L: Study Area Study Area WQ MTD A-110 (Total)Inflow=1.54 cfs 0.194 af Primary=1.54 cfs 0.194 af
Link 14L: Study Area West (Total)Inflow=0.00 cfs 0.001 af Primary=0.00 cfs 0.001 af
Link 16L: Study Area Basin A (Total)Inflow=1.81 cfs 0.228 af Primary=1.81 cfs 0.228 af
2026-02 Existing and Proposed NOAA 24-hr D 2-Year-Projected Rainfall=4.04" Prepared by Dynamic Engineering Printed 2/10/2026 HydroCAD® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLC Page 30 Primary=0.08 cfs 0.010 af Link 18L: Study Area Road Undetained (Total) Inflow=0.08 cfs 0.010 af Total Runoff Area = 2.340 ac Runoff Volume = 0.282 af Average Runoff Depth = 1.45" 62.82% Pervious = 1.470 ac 37.18% Impervious = 0.870 ac ===== PAGE 37 ===== ### Summary for Subcatchment 3S: Ex. Study Area West (Perv) Runoff = 0.01 cfs @ 17.02 hrs, Volume= 0.004 af, Depth= 0.05" Routed to Link 5L : Ex Study Area West (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Projected Rainfall=4.04"
Area (ac)CNDescription
0.93039>75% Grass cover, Good, HSG A
0.93039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
8.4470.03500.09Sheet Flow, A-B\nWoods: Light underbrush n= 0.400 P2= 4.04"\nUsing McCuen-Spiess flow length
0.4510.02002.28Shallow Concentrated Flow, B-C\nUnpaved Kv= 16.1 fps
8.898Total, Increased to minimum Tc = 10.0 min
Subcatchment 3S: Ex. Study Area West (Perv)
Image
Image
2026-02 Existing and ProposedNOAA 24-hr D 2-Year-Projected Rainfall=4.04"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 32
### Summary for Subcatchment 4S: Ex. Study Area West (Imp) Runoff = 0.23 cfs @ 12.19 hrs, Volume= 0.029 af, Depth= 3.81" Routed to Link 5L : Ex Study Area West (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Projected Rainfall=4.04"
Area (ac)CNDescription
0.04098Paved parking, HSG A
0.05098Roofs, HSG A
0.09098Weighted Average
0.09098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.91000.03001.82Sheet Flow, A-B
1.11480.02002.28Smooth surfaces\nn= 0.011 P2= 4.04"
Shallow Concentrated Flow, B-C\nUnpaved Kv= 16.1 fps
2.0 248 Total, Increased to minimum Tc = 10.0 min
Subcatchment 4S: Ex. Study Area West (Imp)
Image
===== PAGE 38 ===== ### Summary for Subcatchment 6S: Ex. Study Area Road (Imp) Runoff = 0.08 cfs @ 12.19 hrs, Volume= 0.010 af, Depth= 3.81" Routed to Link 8L : Existing Study Area Road (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Projected Rainfall=4.04"
Area (ac)CNDescription
0.03098Paved parking, HSG A
0.03098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)
1.0820.01501.32Sheet Flow, A-B\nSmooth surfaces\nn = 0.011 P2= 4.04"
1.0 82 Total, Increased to minimum Tc = 10.0 min
Subcatchment 6S: Ex. Study Area Road (Imp)
Image
2026-02 Existing and ProposedNOAA 24-hr D2-Year-Projected Rainfall=4.04"
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640© 2025 HydroCAD Software Solutions LLCPage 34
### Summary for Subcatchment 7S: Ex. Study Area Road (Perv)
Runoff = 0.00 cfs @ 17.02 hrs, Volume= 0.001 af, Depth= 0.05" Routed to Link 8L : Existing Study Area Road (Total)
Runoff = 0.00 cfs @ 17.02 hrs, Volume= 0.001 af, Depth= 0.05"
Routed to Link 8L : Existing Study Area Road (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Projected Rainfall=4.04"
Area (ac)CNDescription
0.12039>75% Grass cover, Good, HSG A
0.12039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
1.0610.0100 1.06
Sheet Flow, A-B
Smooth surfacesn= 0.011 P2= 4.04"
1.0 61 Total, Increased to minimum Tc = 10.0 min
Subcatchment 7S: Ex. Study Area Road (Perv)
Image
===== PAGE 39 ===== ## Summary for Subcatchment 10S: Study Area WQ MTD A-110 (Imp) Runoff = 1.54 cfs @ 12.19 hrs, Volume= 0.193 af, Depth= 3.81" Routed to Link 10L : Study Area Study Area WQ MTD A-110 (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Projected Rainfall=4.04"
Area (ac)CNDescription
0.61098Paved parking, HSG A
0.61098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.6550.03021.62Sheet Flow, A-B
1.32970.00353.684.52Smooth surfaces\nn= 0.011 P2= 4.04"
Pipe Channel, B-C
15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31'
n= 0.011 Concrete pipe, straight & clean
1.9 352 Total, Increased to minimum Tc = 10.0 min
Subcatchment 10S: Study Area WQ MTD A-110 (Imp)
Image
Image
## Summary for Subcatchment 11S: Study Area WQ MTD A-110 (Perv) Runoff = 0.00 cfs @ 17.02 hrs, Volume= 0.000 af, Depth= 0.05" Routed to Link 10L : Study Area Study Area WQ MTD A-110 (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Projected Rainfall=4.04"
Area (ac)CNDescription
0.02039>75% Grass cover, Good, HSG A
0.02039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
1.480.01250.10Sheet Flow, A-B
0.2460.03803.96Grass: Short n= 0.150 P2= 4.04"
1.32970.00353.684.52Shallow Concentrated Flow, B-C
Paved Kv= 20.3 fps
Pipe Channel, C-D
15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31'
n= 0.011 Concrete pipe, straight & clean
2.9 351 Total. Increased to minimum Tc = 10.0 min
Subcatchment 11S: Study Area WQ MTD A-110 (Perv)
Hydrograph
Image
===== PAGE 40 ===== ## Summary for Subcatchment 12S: Study Area Road Undetained (Imp) Runoff = 0.08 cfs @ 12.19 hrs, Volume= 0.010 af, Depth= 3.81" Routed to Link 18L : Study Area Road Undetained (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Projected Rainfall=4.04"
Area (ac)CNDescription
0.03098Paved parking, HSG A
0.03098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.4350.03221.52Sheet Flow, A-B\nSmooth surfaces\nn = 0.011 P2= 4.04"
0.4 35 Total, Increased to minimum Tc = 10.0 min
Subcatchment 12S: Study Area Road Undetained (Imp)
Image
2026-02 Existing and ProposedNOAA 24-hr D 2-Year-Projected Rainfall=4.04"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledR 2025 HydroCAD Software Solutions LLCPage 38
## Summary for Subcatchment 14S: Study Area West Undetained
Runoff = 0.00 cfs @ 17.02 hrs, Volume= 0.001 af, Depth= 0.05"
Routed to Link 14L : Study Area West (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs
NOAA 24-hr D 2-Year-Projected Rainfall=4.04"
Area (ac)CNDescription
0.31039>75% Grass cover, Good, HSG A
0.31039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
2.7480.0850 0.29 Sheet Flow, A-B Grass: Short n= 0.150 P2= 4.04"
2.7 48 Total, Increased to minimum Tc = 10.0 min
Subcatchment 14S: Study Area West Undetained
Image
===== PAGE 41 ===== ## Summary for Subcatchment 15S: Study Area Roof (Imp) Runoff = 0.28 cfs @ 12.19 hrs, Volume= 0.035 af, Depth= 3.81" Routed to Link 16L : Study Area Basin A (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 2-Year-Projected Rainfall=4.04"
Area (ac)CNDescription
0.11098Roofs, HSG A
0.11098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)
0.82070.01004.501.57\nPipe Channel, A-B\n8.0" Round Area= 0.3 sf Perim= 2.1' r= 0.17'\nn= 0.010 PVC, smooth interior
0.8 207 Total, Increased to minimum Tc = 10.0 min
Subcatchment 15S: Study Area Roof (Imp)
Image
2026-02 Existing and ProposedNOAA 24-hr D2-Year-Projected Rainfall=4.04"
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640© 2025 HydroCAD Software Solutions LLCPage 40
## Summary for Subcatchment 19S: Study Area Road Undetained (Perv)
Runoff = 0.00 cfs @ 17.02 hrs, Volume= 0.000 af, Depth= 0.05"
Routed to Link 18L : Study Area Road Undetained (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs\nNOAA 24-hr D 2-Year-Projected Rainfall=4.04"
Area (ac)CNDescription
0.09039>75% Grass cover, Good, HSG A
0.09039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
4.8580.0300 0.20
Sheet Flow, A-B
Grass: Short n= 0.150 P2= 4.04"
4.8 58 Total, Increased to minimum Tc = 10.0 min
Subcatchment 19S: Study Area Road Undetained (Perv)
Image
===== PAGE 42 ===== ## Summary for Pond 21P: Basin A Routing (StormBrixx)
Inflow Area = 0.740 ac, 97.30% Impervious, Inflow Depth = 3.70" for 2-Year-Projected event
Inflow = 1.81 cfs @ 12.19 hrs, Volume= 0.228 af
Outflow = 0.70 cfs @ 12.63 hrs, Volume= 0.228 af, Atten= 62%, Lag= 26.5 min
Discarded = 0.70 cfs @ 12.63 hrs, Volume= 0.228 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 14L : Study Area West (Total)
Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs
Peak Elev= 117.98' @ 12.63 hrs Surf.Area= 3,001 sf Storage= 1,394 cf
Plug-Flow detention time= 10.0 min calculated for 0.228 af (100% of inflow) Center-of-Mass det. time= 10.0 min (773.3 - 763.3)
VolumeInvertAvail.StorageStorage Description
#1A117.50'0 cf31.63'W x 94.88'L x 3.00'H Field A
#2A117.50'8,729 cf8,999 cf Overall - 8,999 cf Embedded = 0 cf x 40.0% Voids ACO StormBrixx SD 1 x 384 Inside #1 Inside = 23.7"W x 36.0"H => 5.75 sf x 3.95'L = 22.7 cf Outside = 23.7"W x 36.0"H => 5.93 sf x 3.95'L = 23.4 cf 384 Chambers in 16 Rows
8,729 cf Total Available Storage
Storage Group A created with Chamber Wizard
DeviceRoutingInvertOutlet Devices
#1Primary117.50'15.0" Round Culvert L= 22.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 117.50'/ 117.40' S= 0.0045'/' Cc= 0.900 n= 0.013, Flow Area= 1.23 sf
#2Device 1118.81'6.0" Vert. Orifice C= 0.600 Limited to weir flow at low heads
#3Discarded117.50'10.000 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = -4.00'
Discarded OutFlow Max=0.70 cfs @ 12.63 hrs HW=117.98' (Free Discharge) —3=Exfiltration ( Controls 0.70 cfs)
Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=117.50' (Free Discharge) —1=Culvert ( Controls 0.00 cfs) —2=Orifice ( Controls 0.00 cfs)
## Pond 21P: Basin A Routing (StormBrixx) - Chamber Wizard Field A Chamber Model = ACO StormBrixx SD 1 (ACO StormBrixx SD) Inside = 23.7" W × 36.0" H => 5.75 sf × 3.95' L = 22.7 cf Outside = 23.7" W × 36.0" H => 5.93 sf × 3.95' L = 23.4 cf 24 Chambers/Row × 3.95' Long = 94.88' Row Length 16 Rows × 23.7" Wide = 31.63' Base Width 36.0" Chamber Height = 3.00' Field Height 384 Chambers × 22.7 cf = 8,728.7 cf Chamber Storage 384 Chambers × 23.4 cf = 8,998.6 cf Displacement Chamber Storage = 8,728.7 cf = 0.200 af Overall Storage Efficiency = 97.0% Overall System Size = 94.88' × 31.63' × 3.00' 384 Chambers 333.3 cy Field
Image
===== PAGE 43 =====
Pond 21P: Basin A Routing (StormBrixx)
Image
## Summary for Link 5L: Ex Study Area West (Total)
Inflow Area =1.020 ac,8.82% Impervious,Inflow Depth = 0.38" for 2-Year-Projected event
Inflow =0.23 cfs @12.19 hrs,Volume= 0.032 af
Primary =0.23 cfs @12.19 hrs,Volume= 0.032 af,Atten= 0%,Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 5L: Ex Study Area West (Total)
Image
===== PAGE 44 ===== ## Summary for Link 8L: Existing Study Area Road (Total)
Inflow Area =0.150 ac, 20.00% Impervious, Inflow Depth = 0.80" for 2-Year-Projected event
Inflow =0.08 cfs @ 12.19 hrs, Volume= 0.010 af
Primary =0.08 cfs @ 12.19 hrs, Volume= 0.010 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 8L: Existing Study Area Road (Total)
Image
## Summary for Link 10L: Study Area Study Area WQ MTD A-110 (Total)
Inflow Area =0.630 ac, 96.83% Impervious, Inflow Depth = 3.69" for 2-Year-Projected event
Inflow =1.54 cfs @ 12.19 hrs, Volume= 0.194 af
Primary =1.54 cfs @ 12.19 hrs, Volume= 0.194 af, Atten= 0%, Lag= 0.0 min
Routed to Link 161 : Study Area Basin A (Total)
Routed to Link 16L : Study Area Basin A (Total) Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs Fixed water surface Elevation= 117.75'
Link 10L: Study Area Study Area WQ MTD A-110 (Total)
Image
===== PAGE 45 ===== ## Summary for Link 14L: Study Area West (Total)
Inflow Area =1.050 ac, 68.57% Impervious, Inflow Depth = 0.01" for 2-Year-Projected event
Inflow =0.00 cfs @ 17.02 hrs, Volume= 0.001 af
Primary =0.00 cfs @ 17.02 hrs, Volume= 0.001 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 14L: Study Area West (Total)
Image
## Summary for Link 16L: Study Area Basin A (Total)
Inflow Area =0.740 ac, 97.30% Impervious, Inflow Depth = 3.70" for 2-Year-Projected event
Inflow =1.81 cfs @ 12.19 hrs, Volume= 0.228 af
Primary =1.81 cfs @ 12.19 hrs, Volume= 0.228 af, Atten= 0%, Lag= 0.0 min
Routed to Pond 21P : Basin A Routing (StormBrixx)
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 16L: Study Area Basin A (Total)
Hydrograph
Image
===== PAGE 46 ===== ## Summary for Link 18L: Study Area Road Undetained (Total)
Inflow Area =0.120 ac, 25.00% Impervious, Inflow Depth = 0.99" for 2-Year-Projected event
Inflow =0.08 cfs @ 12.19 hrs, Volume= 0.010 af
Primary =0.08 cfs @ 12.19 hrs, Volume= 0.010 af, Atten= 0%, Lag= 0.0 min
Link 18L: Study Area Road Undetained (Total)
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Image
Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment3S: Ex. Study Area WestRunoff Area=0.930 ac 0.00% Impervious Runoff Depth=0.28" Flow Length=98' Tc=10.0 min CN=39 Runoff=0.05 cfs 0.022 af
Subcatchment4S: Ex. Study Area WestRunoff Area=0.090 ac 100.00% Impervious Runoff Depth=5.14" Flow Length=248' Tc=10.0 min CN=98 Runoff=0.30 cfs 0.039 af
Subcatchment6S: Ex. Study Area RoadRunoff Area=0.030 ac 100.00% Impervious Runoff Depth=5.14" Flow Length=82' Slope=0.0150 /' Tc=10.0 min CN=98 Runoff=0.10 cfs 0.013 af
Subcatchment7S: Ex. Study Area RoadRunoff Area=0.120 ac 0.00% Impervious Runoff Depth=0.28" Flow Length=61' Slope=0.0100 /' Tc=10.0 min CN=39 Runoff=0.01 cfs 0.003 af
Subcatchment10S: Study Area WQ MTDRunoff Area=0.610 ac 100.00% Impervious Runoff Depth=5.14" Flow Length=352' Tc=10.0 min CN=98 Runoff=2.05 cfs 0.261 af
Subcatchment11S: Study Area WQ MTDRunoff Area=0.020 ac 0.00% Impervious Runoff Depth=0.28" Flow Length=351' Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Subcatchment12S: Study Area RoadRunoff Area=0.030 ac 100.00% Impervious Runoff Depth=5.14" Flow Length=35' Slope=0.0322 /' Tc=10.0 min CN=98 Runoff=0.10 cfs 0.013 af
Subcatchment14S: Study Area WestRunoff Area=0.310 ac 0.00% Impervious Runoff Depth=0.28" Flow Length=48' Slope=0.0850 /' Tc=10.0 min CN=39 Runoff=0.02 cfs 0.007 af
Subcatchment15S: Study Area Roof (Imp)Runoff Area=0.110 ac 100.00% Impervious Runoff Depth=5.14" Flow Length=207' Slope=0.0100 /' Tc=10.0 min CN=98 Runoff=0.37 cfs 0.047 af
Subcatchment19S: Study Area RoadRunoff Area=0.090 ac 0.00% Impervious Runoff Depth=0.28" Flow Length=58' Slope=0.0300 /' Tc=10.0 min CN=39 Runoff=0.00 cfs 0.002 af
Pond 21P: Basin A Routing (StormBrixx) Discarded=0.70 cfsPeak Elev=118.37' Storage=2,530 cf Inflow=2.42 cfs 0.309 af 0.309 af Primary=0.00 cfs 0.000 af Outflow=0.70 cfs 0.309 af
Link 5L: Ex Study Area West (Total)Inflow=0.30 cfs 0.061 af Primary=0.30 cfs 0.061 af
Link 8L: Existing Study Area Road (Total)Inflow=0.10 cfs 0.016 af Primary=0.10 cfs 0.016 af
Link 10L: Study Area Study Area WQ MTD A-110 (Total)Inflow=2.05 cfs 0.262 af Primary=2.05 cfs 0.262 af
Link 14L: Study Area West (Total)Inflow=0.02 cfs 0.007 af Primary=0.02 cfs 0.007 af
Link 16L: Study Area Basin A (Total)Inflow=2.42 cfs 0.309 af
Link 16L: Study Area Basin A (Total) Inflow=2.42 cfs 0.309 af Primary=2.42 cfs 0.309 af ===== PAGE 47 =====
2026-02 Existing and ProposedNOAA 24-hr D 10-Year-Current Rainfall=5.38"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD ® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLCPage 52
2026-02 Existing and Proposed Prepared by Dynamic Engineering HydroCAD\circledR 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLCNOAA 24-hr D 10-Year-Current Rainfall=5.38" Printed 2/10/2026 Page 51
Link 18L: Study Area Road Undetained (Total)Inflow=0.10 cfs 0.015 af Primary=0.10 cfs 0.015 af
Total Runoff Area = 2.340 ac Runoff Volume = 0.408 af Average Runoff Depth = 2.09" 62.82% Pervious = 1.470 ac 37.18% Impervious = 0.870 ac
### Summary for Subcatchment 3S: Ex. Study Area West (Perv) Runoff = 0.05 cfs @ 12.93 hrs, Volume= 0.022 af, Depth= 0.28" Routed to Link 5L : Ex Study Area West (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Current Rainfall=5.38"
Area (ac)CNDescription
0.93039>75% Grass cover, Good, HSG A
0.93039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
8.4470.03500.09Sheet Flow, A-B\nWoods: Light underbrush n= 0.400 P2= 4.04" Using McCuen-Spiess flow length
0.4510.02002.28Shallow Concentrated Flow, B-C\nUnpaved Kv= 16.1 fps
8.898Total, Increased to minimumTc= 10.0 min
Subcatchment 3S: Ex. Study Area West (Perv)
Image
===== PAGE 48 ===== ### Summary for Subcatchment 4S: Ex. Study Area West (Imp)
Runoff = 0.30 cfs @ 12.19 hrs, Volume= 0.039 af, Depth= 5.14" Routed to Link 5L : Ex Study Area West (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Current Rainfall=5.38"
Area (ac)CNDescription
0.04098Paved parking, HSG A
0.05098Roofs, HSG A
0.09098Weighted Average
0.09098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.91000.03001.82Sheet Flow, A-B\nSmooth surfaces n= 0.011 P2= 4.04"
1.11480.02002.28Shallow Concentrated Flow, B-C\nUnpaved Kv= 16.1 fps
2.0248TotalIncreased to minimum Tc = 10.0 min
2.0 248 Total, Increased to minimum Tc = 10.0 min
Subcatchment 4S: Ex. Study Area West (Imp)
Image
2026-02 Existing and ProposedNOAA 24-hr D10-Year-CurrentRainfall=5.38"
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640© 2025 HydroCAD Software Solutions LLCPage 54
### Summary for Subcatchment 6S: Ex. Study Area Road (Imp)
Runoff = 0.10 cfs @ 12.19 hrs, Volume= 0.013 af, Depth= 5.14" Routed to Link 8L : Existing Study Area Road (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Current Rainfall=5.38"
Area (ac)CNDescription
0.03098Paved parking, HSG A
0.03098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)
1.0820.01501.32
Sheet Flow, A-B
Smooth surfacesn= 0.011 P2= 4.04"
1.082TotalIncreased to minimum Tc = 10.0 min
1.0 82 Total, Increased to minimum Tc = 10.0 min
Subcatchment 6S: Ex. Study Area Road (Imp)
Image
===== PAGE 49 ===== ### Summary for Subcatchment 7S: Ex. Study Area Road (Perv) Runoff = 0.01 cfs @ 12.93 hrs, Volume= 0.003 af, Depth= 0.28" Routed to Link 8L : Existing Study Area Road (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Current Rainfall=5.38"
Area (ac)CNDescription
0.12039>75% Grass cover, Good, HSG A
0.12039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
1.0610.0100 1.06
Sheet Flow, A-B
Smooth surfacesn= 0.011 P2= 4.04"
1.0 61 Total, Increased to minimum Tc = 10.0 min
Subcatchment 7S: Ex. Study Area Road (Perv)
Image
2026-02 Existing and ProposedNOAA 24-hr D10-Year-CurrentRainfall=5.38''
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640© 2025 HydroCAD Software Solutions LLCPage 56
## Summary for Subcatchment 10S: Study Area WQ MTD A-110 (Imp)
Runoff = 2.05 cfs @ 12.19 hrs, Volume= 0.261 af, Depth= 5.14" Routed to Link 10L : Study Area Study Area WQ MTD A-110 (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Current Rainfall=5.38"
Area (ac)CNDescription
0.61098Paved parking, HSG A
0.61098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.6550.03021.62Sheet Flow, A-B\nSmooth surfaces n= 0.011 P2= 4.04"
1.32970.00353.684.52Pipe Channel, B-C\n15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31'\nn= 0.011 Concrete pipe, straight & clean
1.9352TotalIncreased to minimumTc = 10.0 min
1.9 352 Total, Increased to minimum Tc = 10.0 min
Subcatchment 10S: Study Area WQ MTD A-110 (Imp)
Hydrograph
Image
===== PAGE 50 ===== ## Summary for Subcatchment 11S: Study Area WQ MTD A-110 (Perv) Runoff = 0.00 cfs @ 12.93 hrs, Volume= 0.000 af, Depth= 0.28" Routed to Link 10L : Study Area Study Area WQ MTD A-110 (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Current Rainfall=5.38"
Area (ac)CNDescription
0.02039>75% Grass cover, Good, HSG A
0.02039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
1.480.01250.10Sheet Flow, A-B\nGrass: Short n= 0.150 P2= 4.04"
0.2460.03803.96Shallow Concentrated Flow, B-C\nPaved Kv= 20.3 fps
1.32970.00353.684.52Pipe Channel, C-D\n15.0" Round Area= 1.2 sf Perm= 3.9' r= 0.31'\nn= 0.011 Concrete pipe, straight & clean
2.9 351 Total, Increased to minimum Tc = 10.0 min
Subcatchment 11S: Study Area WQ MTD A-110 (Perv)
Hydrograph
Image
2026-02 Existing and ProposedNOAA 24-hr D10-Year-CurrentRainfall=5.38''
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640© 2025 HydroCAD Software Solutions LLCPage 58
## Summary for Subcatchment 12S: Study Area Road Undetained (Imp)
Runoff = 0.10 cfs @ 12.19 hrs, Volume= 0.013 af, Depth= 5.14" Routed to Link 18L : Study Area Road Undetained (Total)
Runoff = 0.10 cfs @ 12.19 hrs, Volume= 0.013 af, Depth= 5.14" Routed to Link 18L : Study Area Road Undetained (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Current Rainfall=5.38"
Image
===== PAGE 51 ===== ## Summary for Subcatchment 14S: Study Area West Undetained Runoff = 0.02 cfs @ 12.93 hrs, Volume= 0.007 af, Depth= 0.28" Routed to Link 14L : Study Area West (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Current Rainfall=5.38"
Area (ac)CNDescription
0.31039>75% Grass cover, Good, HSG A
0.31039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)
2.7480.08500.29Sheet Flow, A-B\nGrass: Short n= 0.150 P2= 4.04"
2.7 48 Total, Increased to minimum Tc = 10.0 min
Subcatchment 14S: Study Area West Undetained
Image
2026-02 Existing and ProposedNOAA 24-hr D10-Year-CurrentRainfall=5.38"
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640© 2025 HydroCAD Software Solutions LLCPage 60
## Summary for Subcatchment 15S: Study Area Roof (Imp)
Runoff = 0.37 cfs @ 12.19 hrs, Volume= 0.047 af, Depth= 5.14"
Routed to Link 16L : Study Area Basin A (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Current Rainfall=5.38"
Area (ac)CNDescription
0.11098Roofs, HSG A
0.11098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.82070.01004.501.57Pipe Channel, A-B\n8.0" Round Area= 0.3 sf Perm= 2.1' r= 0.17'\nn= 0.010 PVC, smooth interior
0.8 207 Total, Increased to minimum Tc = 10.0 min
Subcatchment 15S: Study Area Roof (Imp)
Image
===== PAGE 52 ===== ## Summary for Subcatchment 19S: Study Area Road Undetained (Perv)
Runoff = 0.00 cfs @ 12.93 hrs, Volume= 0.002 af, Depth= 0.28"
Routed to Link 18L : Study Area Road Undetained (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs
NOAA 24-hr D 10-Year-Current Rainfall=5.38"
Area (ac)CNDescription
0.09039>75% Grass cover, Good, HSG A
0.09039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
4.8580.0300 0.20
Sheet Flow, A-B
Grass: Short n= 0.150 P2= 4.04"
4.858Total Increased to minimum Tc = 10.0 min
4.8 58 Total, Increased to minimum Tc = 10.0 min
Subcatchment 19S: Study Area Road Undetained (Perv)
Hydrograph
Image
Image
2026-02 Existing and ProposedNOAA 24-hr D10-Year-CurrentRainfall=5.38"
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640© 2025 HydroCAD Software Solutions LLCPage 62
## Summary for Pond 21P: Basin A Routing (StormBrixx)
Inflow Area =0.740 ac, 97.30% Impervious, Inflow Depth = 5.01" for 10-Year-Current event
Inflow =2.42 cfs @ 12.19 hrs, Volume= 0.309 af
Outflow =0.70 cfs @ 12.76 hrs, Volume= 0.309 af, Atten= 71%, Lag= 34.5 min
Discarded =0.70 cfs @ 12.76 hrs, Volume= 0.309 af
Primary =0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 14L: Study Area West (Total)
Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 118.37' @ 12.76 hrs Surf.Area= 3,001 sf Storage= 2,530 cf Plug-Flow detention time= 18.8 min calculated for 0.309 af (100% of inflow) Center-of-Mass det. time= 18.8 min (777.0 - 758.2)
VolumeInvertAvail.StorageStorage Description
#1A117.50'0 cf31.63'W x 94.88'L x 3.00'H Field A
#2A117.50'8,729 cf8,999 cf Overall - 8,999 cf Embedded = 0 cf x 40.0% Voids\nACO StormBrixx SD 1 x 384 Inside #1\nInside = 23.7"W x 36.0"H => 5.75 sf x 3.95'L = 22.7 cf\nOutside = 23.7"W x 36.0"H => 5.93 sf x 3.95'L = 23.4 cf\n384 Chambers in 16 Rows
8,729 cf Total Available Storage
Storage Group A created with Chamber Wizard
DeviceRoutingInvertOutlet Devices
#1Primary117.50'15.0" Round Culvert\nL= 22.0' RCP, groove end projecting, Ke= 0.200\nInlet / Outlet Invert= 117.50' / 117.40' S= 0.0045'' Cc= 0.900\nn= 0.013, Flow Area= 1.23 sf
#2Device 1118.81'6.0'' Vert. Orifice C= 0.600 Limited to weir flow at low heads
#3Discarded117.50'10.000 in/hr Exfiltration over Surface area\nConductivity to Groundwater Elevation = -4.00'
Discarded OutFlow Max=0.70 cfs @ 12.76 hrs HW=118.37' (Free Discharge)\n—3=Exfiltration ( Controls 0.70 cfs)
Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=117.50' (Free Discharge)\n—1=Culvert ( Controls 0.00 cfs)\n—2=Orifice ( Controls 0.00 cfs)
===== PAGE 53 ===== ## Pond 21P: Basin A Routing (StormBrixx) - Chamber Wizard Field A Chamber Model = ACO StormBrixx SD 1 (ACO StormBrixx® SD) Inside = 23.7" W x 36.0" H => 5.75 sf x 3.95" L = 22.7 cf Outside = 23.7" W x 36.0" H => 5.93 sf x 3.95" L = 23.4 cf 24 Chambers/Row x 3.95' Long = 94.88' Row Length 16 Rows x 23.7" Wide = 31.63' Base Width 36.0" Chamber Height = 3.00' Field Height 384 Chambers x 22.7 cf = 8.728.7 cf Chamber Storage 384 Chambers x 23.4 cf = 8.998.6 cf Displacement Chamber Storage = 8,728.7 cf = 0.200 af Overall Storage Efficiency = 97.0% Overall System Size = 94.88' x 31.63' x 3.00' 384 Chambers 333.3 cy Field
Image
Pond 21P: Basin A Routing (StormBrixx)
Image
Image
Inflow Outflow Discarded Primary 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ===== PAGE 54 ===== ## Summary for Link 5L: Ex Study Area West (Total)
Inflow Area =1.020 ac,8.82% Impervious,Inflow Depth = 0.71" for 10-Year-Current event
Inflow =0.30 cfs @12.19 hrs,Volume= 0.061 af
Primary =0.30 cfs @12.19 hrs,Volume= 0.061 af,Atten= 0%, Lag= 0.0 min
Link 5L: Ex Study Area West (Total)
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Image
## Summary for Link 8L: Existing Study Area Road (Total)
Inflow Area =0.150 ac, 20.00% Impervious, Inflow Depth = 1.26" for 10-Year-Current event
Inflow =0.10 cfs @ 12.19 hrs, Volume= 0.016 af
Primary =0.10 cfs @ 12.19 hrs, Volume= 0.016 af, Atten= 0%, Laq= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 8L: Existing Study Area Road (Total)
Image
===== PAGE 55 ===== ## Summary for Link 10L: Study Area Study Area WQ MTD A-110 (Total) Inflow Area = 0.630 ac, 96.83% Impervious, Inflow Depth = 4.99" for 10-Year-Current event Inflow = 2.05 cfs @ 12.19 hrs, Volume = 0.262 af Primary = 2.05 cfs @ 12.19 hrs, Volume = 0.262 af, Atten = 0%, Lag = 0.0 min Fixed water surface Elevation= 117.75' Routed to Link 16L : Study Area Basin A (Total)
Link 10L: Study Area Study Area WQ MTD A-110 (Total)
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Image
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ## Summary for Link 14L: Study Area West (Total)
Inflow Area =1.050 ac, 68.57% Impervious, Inflow Depth = 0.08" for 10-Year-Current event
Inflow =0.02 cfs @ 12.93 hrs, Volume= 0.007 af
Primary =0.02 cfs @ 12.93 hrs, Volume= 0.007 af, Atten= 0%. Laq= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 14L: Study Area West (Total)
Image
===== PAGE 56 ===== ## Summary for Link 16L: Study Area Basin A (Total)
Inflow Area =0.740 ac, 97.30% Impervious, Inflow Depth = 5.01" for 10-Year-Current event
Inflow =2.42 cfs @ 12.19 hrs, Volume= 0.309 af
Primary =2.42 cfs @ 12.19 hrs, Volume= 0.309 af, Atten= 0%, Lag= 0.0 min
Routed to Pond 21P : Basin A Routing (StormBrixx)
Link 16L: Study Area Basin A (Total)
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Image
## Summary for Link 18L: Study Area Road Undetained (Total)
Inflow Area =0.120 ac, 25.00% Impervious, Inflow Depth = 1.50" for 10-Year-Current event
Inflow =0.10 cfs @ 12.19 hrs, Volume= 0.015 af
Primary =0.10 cfs @ 12.19 hrs, Volume= 0.015 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 18L: Study Area Road Undetained (Total)
Image
===== PAGE 57 =====
Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment3S: Ex. Study Area WestRunoff Area=0.930 ac 0.00% Impervious Runoff Depth=0.55" Flow Length=98' Tc=10.0 min CN=39 Runoff=0.14 cfs 0.042 af
Subcatchment4S: Ex. Study Area WestRunoff Area=0.090 ac 100.00% Impervious Runoff Depth=6.10" Flow Length=248' Tc=10.0 min CN=98 Runoff=0.36 cfs 0.046 af
Subcatchment6S: Ex. Study Area RoadRunoff Area=0.030 ac 100.00% Impervious Runoff Depth=6.10" Flow Length=82' Slope=0.0150 /" Tc=10.0 min CN=98 Runoff=0.12 cfs 0.015 af
Subcatchment7S: Ex. Study Area RoadRunoff Area=0.120 ac 0.00% Impervious Runoff Depth=0.55" Flow Length=61' Slope=0.0100 /" Tc=10.0 min CN=39 Runoff=0.02 cfs 0.005 af
Subcatchment10S: Study Area WQ MTDRunoff Area=0.610 ac 100.00% Impervious Runoff Depth=6.10" Flow Length=352' Tc=10.0 min CN=98 Runoff=2.42 cfs 0.310 af
Subcatchment11S: Study Area WQ MTDRunoff Area=0.020 ac 0.00% Impervious Runoff Depth=0.55" Flow Length=351' Tc=10.0 min CN=39 Runoff=0.00 cfs 0.001 af
Subcatchment12S: Study Area RoadRunoff Area=0.030 ac 100.00% Impervious Runoff Depth=6.10" Flow Length=35' Slope=0.0322 /" Tc=10.0 min CN=98 Runoff=0.12 cfs 0.015 af
Subcatchment14S: Study Area WestRunoff Area=0.310 ac 0.00% Impervious Runoff Depth=0.55" Flow Length=48' Slope=0.0850 /" Tc=10.0 min CN=39 Runoff=0.05 cfs 0.014 af
Subcatchment15S: Study Area Roof (Imp) Flow Length=207' Runoff Area=0.110 ac 100.00% Impervious Runoff Depth=6.10" Flow Length=207' Slope=0.0100 /" Tc=10.0 min CN=98 Runoff=0.44 cfs 0.056 af
Subcatchment19S: Study Area RoadRunoff Area=0.090 ac 0.00% Impervious Runoff Depth=0.55" Flow Length=58' Slope=0.0300 /" Tc=10.0 min CN=39 Runoff=0.01 cfs 0.004 af
Pond 21P: Basin A Routing (StormBrixx) Discarded=0.70 cfs Peak Elev=118.68' Storage=3,445 cf Inflow=2.86 cfs 0.367 af
Link 5L: Ex Study Area West (Total)Primary=0.00 cfs 0.000 af Outflow=0.70 cfs 0.367 af
Link 8L: Existing Study Area Road (Total)Primary=0.45 cfs Inflow=0.45 cfs 0.088 af
Link 10L: Study Area Study Area WQ MTD A-110 (Total)Primary=0.45 cfs 0.088 af Inflow=0.13 cfs 0.021 af
Link 14L: Study Area West (Total)Primary=0.13 cfs 0.021 af Inflow=2.42 cfs 0.311 af
Link 16L: Study Area Basin A (Total)Primary=2.42 cfs 0.311 af Inflow=0.05 cfs 0.014 af
2026-02 Existing and Proposed NOAA 24-hr D 10-Year-Projected Rainfall=6.34" Prepared by Dynamic Engineering Printed 2/10/2026 HydroCAD® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLC Page 72 Primary=0.13 cfs 0.019 af Link 18L: Study Area Road Undetained (Total) Inflow=0.13 cfs 0.019 af Total Runoff Area = 2.340 ac Runoff Volume = 0.509 af Average Runoff Depth = 2.61" 62.82% Pervious = 1.470 ac 37.18% Impervious = 0.870 ac ===== PAGE 58 ===== ### Summary for Subcatchment 3S: Ex. Study Area West (Perv) Runoff = 0.14 cfs @ 12.53 hrs, Volume= 0.042 af, Depth= 0.55" Routed to Link 5L : Ex Study Area West (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Projected Rainfall=6.34"
Area (ac)CNDescription
0.93039>75% Grass cover, Good, HSG A
0.93039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
8.4470.03500.09Sheet Flow, A-B\nWoods: Light underbrush n= 0.400 P2= 4.04"\nUsing McCuen-Spiess flow length
0.4510.02002.28Shallow Concentrated Flow, B-C\nUnpaved Kv= 16.1 fps
8.898Total, Increased to minimum Tc = 10.0 min
Subcatchment 3S: Ex. Study Area West (Perv)
Hydrograph
Image
Image
2026-02 Existing and ProposedNOAA 24-hr D 10-Year-Projected Rainfall=6.34"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 74
### Summary for Subcatchment 4S: Ex. Study Area West (Imp) Runoff = 0.36 cfs @ 12.19 hrs, Volume= 0.046 af, Depth= 6.10" Routed to Link 5L : Ex Study Area West (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Projected Rainfall=6.34"
Area (ac)CNDescription
0.04098Paved parking, HSG A
0.05098Roofs, HSG A
0.09098Weighted Average
0.09098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.91000.03001.82Sheet Flow, A-B
1.11480.02002.28Smooth surfaces\nn= 0.011 P2= 4.04"
Shallow Concentrated Flow, B-C\nUnpaved Kv= 16.1 fps
2.0 248 Total, Increased to minimum Tc = 10.0 min
Subcatchment 4S: Ex. Study Area West (Imp)
Hydrograph
Image
===== PAGE 59 ===== ### Summary for Subcatchment 6S: Ex. Study Area Road (Imp) Runoff = 0.12 cfs @ 12.19 hrs, Volume= 0.015 af, Depth= 6.10" Routed to Link 8L : Existing Study Area Road (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Projected Rainfall=6.34"
Area (ac)CNDescription
0.03098Paved parking, HSG A
0.03098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)
1.0820.01501.32Sheet Flow, A-B\nSmooth surfaces\nn = 0.011\nP2= 4.04"
1.0 82 Total, Increased to minimum Tc = 10.0 min
Subcatchment 6S: Ex. Study Area Road (Imp)
Image
2026-02 Existing and ProposedNOAA 24-hr D 10-Year-Projected Rainfall=6.34"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 76
### Summary for Subcatchment 7S: Ex. Study Area Road (Perv)
Runoff = 0.02 cfs @ 12.53 hrs, Volume= 0.005 af, Depth= 0.55"
Routed to Link 8L : Existing Study Area Road (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Projected Rainfall=6.34"
Area (ac)CNDescription
0.12039>75% Grass cover, Good, HSG A
0.12039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
1.0610.0100 1.06
Sheet Flow, A-B
Smooth surfacesn= 0.011 P2= 4.04"
1.0 61 Total, Increased to minimum Tc = 10.0 min
Subcatchment 7S: Ex. Study Area Road (Perv)
Image
===== PAGE 60 ===== ## Summary for Subcatchment 10S: Study Area WQ MTD A-110 (Imp) Runoff = 2.42 cfs @ 12.19 hrs, Volume= 0.310 af, Depth= 6.10" Routed to Link 10L : Study Area Study Area WQ MTD A-110 (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Projected Rainfall=6.34"
Area (ac)CNDescription
0.61098Paved parking, HSG A
0.61098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.6550.03021.62Sheet Flow, A-B\nSmooth surfaces n= 0.011 P2= 4.04"
1.32970.00353.684.52Pipe Channel, B-C\n15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31'\nn= 0.011 Concrete pipe, straight & clean
1.9 352 Total, Increased to minimum Tc = 10.0 min
Subcatchment 10S: Study Area WQ MTD A-110 (Imp)
Image
Image
## Summary for Subcatchment 11S: Study Area WQ MTD A-110 (Perv) Runoff = 0.00 cfs @ 12.53 hrs, Volume= 0.001 af, Depth= 0.55" Routed to Link 10L : Study Area Study Area WQ MTD A-110 (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Projected Rainfall=6.34"
Area (ac)CNDescription
0.02039>75% Grass cover, Good, HSG A
0.02039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
1.480.01250.10Sheet Flow, A-B\nGrass: Short n= 0.150 P2= 4.04"
0.2460.03803.96Shallow Concentrated Flow, B-C\nPaved Kv= 20.3 fps
1.32970.00353.684.52Pipe Channel, C-D\n15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31'\nn= 0.011 Concrete pipe, straight & clean
2.9 351 Total. Increased to minimum Tc = 10.0 min
Subcatchment 11S: Study Area WQ MTD A-110 (Perv)
Image
===== PAGE 61 ===== ## Summary for Subcatchment 12S: Study Area Road Undetained (Imp) Runoff = 0.12 cfs @ 12.19 hrs, Volume= 0.015 af, Depth= 6.10" Routed to Link 18L : Study Area Road Undetained (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Projected Rainfall=6.34"
Area (ac)CNDescription
0.03098Paved parking, HSG A
0.03098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.4350.03221.52Sheet Flow, A-B\nSmooth surfaces n= 0.011 P2= 4.04"
0.4 35 Total, Increased to minimum Tc = 10.0 min
Subcatchment 12S: Study Area Road Undetained (Imp)
Image
2026-02 Existing and ProposedNOAA 24-hr D 10-Year-Projected Rainfall=6.34"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 80
## Summary for Subcatchment 14S: Study Area West Undetained
Runoff = 0.05 cfs @ 12.53 hrs, Volume= 0.014 af, Depth= 0.55"
Routed to Link 14L : Study Area West (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs
NOAA 24-hr D 10-Year-Projected Rainfall=6.34"
Area (ac)CNDescription
0.31039>75% Grass cover, Good, HSG A
0.31039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
2.7480.0850 0.29 Sheet Flow, A-B\nGrass: Short n= 0.150 P2= 4.04"
2.7 48 Total, Increased to minimum Tc = 10.0 min
Subcatchment 14S: Study Area West Undetained
Image
===== PAGE 62 ===== ## Summary for Subcatchment 15S: Study Area Roof (Imp)
Runoff = 0.44 cfs @ 12.19 hrs, Volume= 0.056 af, Depth= 6.10"
Routed to Link 16L : Study Area Basin A (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs
NOAA 24-hr D 10-Year-Projected Rainfall=6.34"
Area (ac)CNDescription
0.11098Roofs, HSG A
0.11098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)
0.82070.01004.501.57\nPipe Channel, A-B\n8.0" Round Area= 0.3 sf Perim= 2.1' r= 0.17'\nn= 0.010 PVC, smooth interior
0.8 207 Total, Increased to minimum Tc = 10.0 min
Subcatchment 15S: Study Area Roof (Imp)
Image
2026-02 Existing and ProposedNOAA 24-hr D 10-Year-Projected Rainfall=6.34"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 82
## Summary for Subcatchment 19S: Study Area Road Undetained (Perv)
Runoff = 0.01 cfs @ 12.53 hrs, Volume= 0.004 af, Depth= 0.55" Routed to Link 18L : Study Area Road Undetained (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Projected Rainfall=6.34"
Area (ac)CNDescription
0.09039>75% Grass cover, Good, HSG A
0.09039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
4.8580.0300 0.20
Sheet Flow, A-B
Grass: Short n= 0.150 P2= 4.04"
4.8 58 Total, Increased to minimum Tc = 10.0 min
Subcatchment 19S: Study Area Road Undetained (Perv)
Image
===== PAGE 63 ===== ## Summary for Pond 21P: Basin A Routing (StormBrixx)
Inflow Area = 0.740 ac, 97.30% Impervious, Inflow Depth = 5.95" for 10-Year-Projected event
Inflow = 2.86 cfs @ 12.19 hrs, Volume= 0.367 af
Outflow = 0.70 cfs @ 12.86 hrs, Volume= 0.367 af, Atten= 75%, Lag= 40.0 min
Discarded = 0.70 cfs @ 12.86 hrs, Volume= 0.367 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 14L : Study Area West (Total)
Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs
Peak Elev= 118.68' @ 12.86 hrs Surf.Area= 3,001 sf Storage= 3,445 cf
Plug-Flow detention time= 26.6 min calculated for 0.367 af (100% of inflow)
Center-of-Mass det. time= 26.6 min ( 782.3 - 755.7 )
VolumeInvertAvail.StorageStorage Description
#1A117.50'0 cf31.63'W x 94.88'L x 3.00'H Field A
#2A117.50'8,729 cf8,999 cf Overall - 8,999 cf Embedded = 0 cf x 40.0% Voids\nACO StormBrixx SD 1 x 384 Inside #1\nInside = 23.7"W x 36.0"H => 5.75 sf x 3.95'L = 22.7 cf\nOutside = 23.7"W x 36.0"H => 5.93 sf x 3.95'L = 23.4 cf\n384 Chambers in 16 Rows
8,729 cf Total Available Storage
Storage Group A created with Chamber Wizard
DeviceRoutingInvertOutlet Devices
#1Primary117.50'15.0" Round Culvert\nL= 22.0' RCP, groove end projecting, Ke= 0.200\nInlet / Outlet Invert= 117.50'/ 117.40' S= 0.0045'/' Cc= 0.900\nn= 0.013, Flow Area= 1.23 sf
#2Device 1118.81'6.0" Vert. Orifice C= 0.600 Limited to weir flow at low heads
#3Discarded117.50'10.000 in/hr Exfiltration over Surface area\nConductivity to Groundwater Elevation = -4.00'
Discarded OutFlow Max=0.70 cfs @ 12.86 hrs HW=118.68' (Free Discharge)\n uparrow3=Exfiltration ( Controls 0.70 cfs)
Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=117.50' (Free Discharge)\n uparrow1=Culvert ( Controls 0.00 cfs)\n uparrow2=Orifice ( Controls 0.00 cfs)
## Pond 21P: Basin A Routing (StormBrixx) - Chamber Wizard Field A Chamber Model = ACO StormBrixx SD 1 (ACO StormBrix Inside = 23.7"W x 36.0"H => 5.75 sf x 3.95'L = 22.7 cf Outside = 23.7"W x 36.0"H => 5.93 sf x 3.95'L = 23.4 cf 24 Chambers/Row x 3.95' Long = 94.88' Row Length 16 Rows x 23.7" Wide = 31.63' Base Width 36.0" Chamber Height = 3.00' Field Height 384 Chambers x 22.7 cf = 8,728.7 cf Chamber Storage 384 Chambers x 23.4 cf = 8,998.6 cf Displacement Chamber Storage = 8,728.7 cf = 0.200 af Overall Storage Efficiency = 97.0% Overall System Size = 94.88' x 31.63' x 3.00' 384 Chambers 333.3 cy Field
Image
===== PAGE 64 =====
Pond 21P: Basin A Routing (StormBrixx)
Image
Summary for Link 5L: Ex Study Area West (Total)
Inflow Area =1.020 ac,8.82% Impervious,Inflow Depth = 1.04" for 10-Year-Projected event
Inflow =0.45 cfs @12.22 hrs,Volume= 0.088 af
Primary =0.45 cfs @12.22 hrs,Volume= 0.088 af,Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 5L: Ex Study Area West (Total)
Image
===== PAGE 65 ===== ## Summary for Link 8L: Existing Study Area Road (Total)
Inflow Area =0.150 ac, 20.00% Impervious, Inflow Depth = 1.66" for 10-Year-Projected event
Inflow =0.13 cfs @ 12.20 hrs, Volume= 0.021 af
Primary =0.13 cfs @ 12.20 hrs, Volume= 0.021 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 8L: Existing Study Area Road (Total)
Image
## Summary for Link 10L: Study Area Study Area WQ MTD A-110 (Total) Inflow Area = 0.630 ac, 96.83% Impervious, Inflow Depth = 5.93" for 10-Year-Projected event Inflow = 2.42 cfs @ 12.19 hrs, Volume = 0.311 af Primary = 2.42 cfs @ 12.19 hrs, Volume = 0.311 af, Atten = 0%, Lag = 0.0 min Routed to Link 16L: Study Area Basin A (Total) Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs Fixed water surface Elevation= 117.75'
Link 10L: Study Area Study Area WQ MTD A-110 (Total)
Image
===== PAGE 66 ===== ## Summary for Link 14L: Study Area West (Total)
Inflow Area =1.050 ac, 68.57% Impervious, Inflow Depth = 0.16" for 10-Year-Projected event
Inflow =0.05 cfs @ 12.53 hrs, Volume= 0.014 af
Primary =0.05 cfs @ 12.53 hrs, Volume= 0.014 af, Atten= 0%, Lag= 0.0 min
Link 14L: Study Area West (Total)
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Image
## Summary for Link 16L: Study Area Basin A (Total) Inflow Area = 0.740 ac, 97.30% Impervious, Inflow Depth = 5.95" for 10-Year-Projected event Inflow = 2.86 cfs @ 12.19 hrs, Volume = 0.367 af Primary = 2.86 cfs @ 12.19 hrs, Volume = 0.367 af, Atten = 0%, Lag = 0.0 min Routed to Pond 21P: Basin A Routing (StormBrixx) Routed to Pond 21P : Basin A Routing (StormBrixx) Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 16L: Study Area Basin A (Total)
Hydrograph
Image
===== PAGE 67 ===== Summary for Link 18L: Study Area Road Undetained (Total)
Inflow Area =0.120 ac, 25.00% Impervious, Inflow Depth = 1.94" for 10-Year-Projected event
Inflow =0.13 cfs @ 12.20 hrs, Volume= 0.019 af
Primary =0.13 cfs @ 12.20 hrs, Volume= 0.019 af, Atten= 0%, Lag= 0.0 min
Link 18L: Study Area Road Undetained (Total)
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Image
Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment3S: Ex. Study Area WestRunoff Area=0.930 ac 0.00% Impervious Runoff Depth=1.83" Flow Length=98' Tc=10.0 min CN=39 Runoff=0.98 cfs 0.142 af
Subcatchment4S: Ex. Study Area WestRunoff Area=0.090 ac 100.00% Impervious Runoff Depth=9.24" Flow Length=248' Tc=10.0 min CN=98 Runoff=0.54 cfs 0.069 af
Subcatchment6S: Ex. Study Area RoadRunoff Area=0.030 ac 100.00% Impervious Runoff Depth=9.24" Flow Length=82' Slope=0.0150'/' Tc=10.0 min CN=98 Runoff=0.18 cfs 0.023 af
Subcatchment7S: Ex. Study Area RoadRunoff Area=0.120 ac 0.00% Impervious Runoff Depth=1.83" Flow Length=61' Slope=0.0100'/' Tc=10.0 min CN=39 Runoff=0.13 cfs 0.018 af
Subcatchment10S: Study Area WQ MTDRunoff Area=0.610 ac 100.00% Impervious Runoff Depth=9.24" Flow Length=352' Tc=10.0 min CN=98 Runoff=3.63 cfs 0.470 af
Subcatchment11S: Study Area WQ MTDRunoff Area=0.020 ac 0.00% Impervious Runoff Depth=1.83" Flow Length=351' Tc=10.0 min CN=39 Runoff=0.02 cfs 0.003 af
Subcatchment12S: Study Area RoadRunoff Area=0.030 ac 100.00% Impervious Runoff Depth=9.24" Flow Length=35' Slope=0.0322'/' Tc=10.0 min CN=98 Runoff=0.18 cfs 0.023 af
Subcatchment14S: Study Area WestRunoff Area=0.310 ac 0.00% Impervious Runoff Depth=1.83" Flow Length=48' Slope=0.0850'/' Tc=10.0 min CN=39 Runoff=0.33 cfs 0.047 af
Subcatchment15S: Study Area Roof (Imp)Runoff Area=0.110 ac 100.00% Impervious Runoff Depth=9.24" Flow Length=207' Slope=0.0100'/' Tc=10.0 min CN=98 Runoff=0.65 cfs 0.085 af
Subcatchment19S: Study Area RoadRunoff Area=0.090 ac 0.00% Impervious Runoff Depth=1.83" Flow Length=58' Slope=0.0300'/' Tc=10.0 min CN=39 Runoff=0.09 cfs 0.014 af
Pond 21P: Basin A Routing (StormBrixx) Discarded=0.71 cfsPeak Elev=119.50' Storage=5,809 cf Inflow=4.30 cfs 0.557 af 0.505 af Primary=0.62 cfs 0.052 af Outflow=1.33 cfs 0.557 af
Link 5L: Ex Study Area West (Total)Inflow=1.51 cfs 0.211 af Primary=1.51 cfs 0.211 af
Link 8L: Existing Study Area Road (Total)Inflow=0.30 cfs 0.041 af Primary=0.30 cfs 0.041 af
Link 10L: Study Area Study Area WQ MTD A-110 (Total)Inflow=3.65 cfs 0.473 af Primary=3.65 cfs 0.473 af
Link 14L: Study Area West (Total)Inflow=0.80 cfs 0.099 af Primary=0.80 cfs 0.099 af
Link 16L: Study Area Basin A (Total)Inflow=4.30 cfs 0.557 af
Link 16L: Study Area Basin A (Total) Inflow=4.30 cfs 0.557 af Primary=4.30 cfs 0.557 af ===== PAGE 68 =====
2026-02 Existing and Proposed Prepared by Dynamic Engineering HydroCAD\circledR 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLCNOAA 24-hr D 100-Year-Current Rainfall=9.48" Printed 2/10/2026 Page 94
2026-02 Existing and ProposedNOAA 24-hr D100-Year-Current Rainfall=9.48"
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\textregistered 10.20-8a s/n 08640© 2025 HydroCAD Software Solutions LLCPage 93
Link 18L: Study Area Road Undetained (Total)Inflow=0.27 cfs0.037 af
Primary=0.27 cfs0.037 af
Total Runoff Area = 2.340 acRunoff Volume = 0.895 afAverage Runoff Depth = 4.59"
62.82% Pervious = 1.470 ac37.18% Impervious = 0.870 ac
### Summary for Subcatchment 3S: Ex. Study Area West (Perv) Runoff = 0.98 cfs @ 12.22 hrs, Volume= 0.142 af, Depth= 1.83" Routed to Link 5L : Ex Study Area West (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Current Rainfall=9.48"
Area (ac)CNDescription
0.93039>75% Grass cover, Good, HSG A
0.93039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
8.4470.03500.09Sheet Flow, A-B\nWoods: Light underbrush n= 0.400 P2= 4.04" Using McCuen-Spiess flow length
0.4510.02002.28Shallow Concentrated Flow, B-C\nUnpaved Kv= 16.1 fps
8.898Total, Increased to minimumTc= 10.0 min
Subcatchment 3S: Ex. Study Area West (Perv)
Hydrograph
Image
Image
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 ===== PAGE 69 ===== ### Summary for Subcatchment 4S: Ex. Study Area West (Imp)
Runoff = 0.54 cfs @ 12.19 hrs, Volume= 0.069 af, Depth= 9.24" Routed to Link 5L : Ex Study Area West (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Current Rainfall=9.48"
Area (ac)CNDescription
0.04098Paved parking, HSG A
0.05098Roofs, HSG A
0.09098Weighted Average
0.09098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.91000.03001.82Sheet Flow, A-B
1.11480.02002.28Smooth surfaces\nn= 0.011 P2= 4.04"
Shallow Concentrated Flow, B-C
Unpaved Kv= 16.1 fps
2.0248TotalIncreased to minimumTc = 10.0 min
2.0 248 Total. Increased to minimum Tc = 10.0 min
Subcatchment 4S: Ex. Study Area West (Imp)
Hydrograph
Image
2026-02 Existing and ProposedNOAA 24-hr D100-Year-CurrentRainfall=9.48''
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640© 2025 HydroCAD Software Solutions LLCPage 96
### Summary for Subcatchment 6S: Ex. Study Area Road (Imp) Runoff = 0.18 cfs @ 12.19 hrs, Volume= 0.023 af, Depth= 9.24" Routed to Link 8L : Existing Study Area Road (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Current Rainfall=9.48"
Area (ac)CNDescription
0.03098Paved parking, HSG A
0.03098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)
1.0820.01501.32
Sheet Flow, A-B
Smooth surfacesn= 0.011
P2= 4.04"
1.0 82 Total, Increased to minimum Tc = 10.0 min
Subcatchment 6S: Ex. Study Area Road (Imp)
Image
===== PAGE 70 ===== ### Summary for Subcatchment 7S: Ex. Study Area Road (Perv) Runoff = 0.13 cfs @ 12.22 hrs, Volume= 0.018 af, Depth= 1.83" Routed to Link 8L : Existing Study Area Road (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Current Rainfall=9.48"
Area (ac)CNDescription
0.12039>75% Grass cover, Good, HSG A
0.12039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)
1.0610.01001.06Sheet Flow, A-B\nSmooth surfaces\nn = 0.011 P2= 4.04"
1.0 61 Total, Increased to minimum Tc = 10.0 min
Hydrograph
Subcatchment 7S: Ex. Study Area Road (Perv)
Image
Image
2026-02 Existing and ProposedNOAA 24-hr D 100-Year-Current Rainfall=9.48"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 98
## Summary for Subcatchment 10S: Study Area WQ MTD A-110 (Imp)
Runoff = 3.63 cfs @ 12.19 hrs, Volume= 0.470 af, Depth= 9.24" Routed to Link 10L : Study Area Study Area WQ MTD A-110 (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Current Rainfall=9.48"
Area (ac)CNDescription
0.61098Paved parking, HSG A
0.61098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.6550.03021.62Sheet Flow, A-B\nSmooth surfaces n= 0.011 P2= 4.04"
1.32970.00353.684.52Pipe Channel, B-C\n15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31'\nn= 0.011 Concrete pipe, straight & clean
1.9352TotalIncreased to minimumTc = 10.0 min
1.9 352 Total, Increased to minimum Tc = 10.0 min
Subcatchment 10S: Study Area WQ MTD A-110 (Imp)
Hydrograph
Image
===== PAGE 71 ===== ## Summary for Subcatchment 11S: Study Area WQ MTD A-110 (Perv) Runoff = 0.02 cfs @ 12.22 hrs, Volume= 0.003 af, Depth= 1.83" Routed to Link 10L : Study Area Study Area WQ MTD A-110 (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Current Rainfall=9.48"
Area (ac)CNDescription
0.02039>75% Grass cover, Good, HSG A
0.02039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
1.480.01250.10Sheet Flow, A-B\nGrass: Short n= 0.150 P2= 4.04"
0.2460.03803.96Shallow Concentrated Flow, B-C\nPaved Kv= 20.3 fps
1.32970.00353.684.52Pipe Channel, C-D\n15.0" Round Area= 1.2 sf Perm= 3.9' r= 0.31'\nn= 0.011 Concrete pipe, straight & clean
2.9 351 Total, Increased to minimum Tc = 10.0 min
Subcatchment 11S: Study Area WQ MTD A-110 (Perv)
Image
2026-02 Existing and ProposedNOAA 24-hr D100-Year-CurrentRainfall=9.48''
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640© 2025 HydroCAD Software Solutions LLCPage 100
## Summary for Subcatchment 12S: Study Area Road Undetained (Imp)
Runoff = 0.18 cfs @ 12.19 hrs, Volume= 0.023 af, Depth= 9.24" Routed to Link 18L : Study Area Road Undetained (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Current Rainfall=9.48"
Area (ac)CNDescription
0.03098Paved parking, HSG A
0.03098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)
0.4350.03221.52
Sheet Flow, A-B
Smooth surfacesn= 0.011 P2= 4.04"
0.435TotalIncreased to minimum Tc = 10.0 min
0.4 35 Total, Increased to minimum Tc = 10.0 min
Subcatchment 12S: Study Area Road Undetained (Imp)
Image
===== PAGE 72 ===== ## Summary for Subcatchment 14S: Study Area West Undetained Runoff = 0.33 cfs @ 12.22 hrs, Volume= 0.047 af, Depth= 1.83" Routed to Link 14L : Study Area West (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Current Rainfall=9.48"
Area (ac)CNDescription
0.31039>75% Grass cover, Good, HSG A
0.31039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
2.7480.08500.29Sheet Flow, A-B\nGrass: Short n= 0.150 P2= 4.04"
2.7 48 Total, Increased to minimum Tc = 10.0 min
Subcatchment 14S: Study Area West Undetained
Image
2026-02 Existing and ProposedNOAA 24-hr D100-Year-CurrentRainfall=9.48"
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640© 2025 HydroCAD Software Solutions LLCPage 102
## Summary for Subcatchment 15S: Study Area Roof (Imp)
Runoff = 0.65 cfs @ 12.19 hrs, Volume= 0.085 af, Depth= 9.24" Routed to Link 16L : Study Area Basin A (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Current Rainfall=9.48"
Area (ac)CNDescription
0.11098Roofs, HSG A
0.11098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.82070.01004.501.57Pipe Channel, A-B\n8.0" Round Area= 0.3 sf Perm= 2.1' r= 0.17'\nn= 0.010 PVC, smooth interior
0.8 207 Total, Increased to minimum Tc = 10.0 min
Subcatchment 15S: Study Area Roof (Imp)
Image
===== PAGE 73 ===== ## Summary for Subcatchment 19S: Study Area Road Undetained (Perv)
Runoff = 0.09 cfs @ 12.22 hrs, Volume= 0.014 af, Depth= 1.83"
Routed to Link 18L : Study Area Road Undetained (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs
NOAA 24-hr D 100-Year-Current Rainfall=9.48"
Area (ac)CNDescription
0.09039>75% Grass cover, Good, HSG A
0.09039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
4.8580.0300 0.20
Sheet Flow, A-B
Grass: Short n= 0.150 P2= 4.04"
4.858Total Increased to minimum Te = 10.0 min
4.8 58 Total, Increased to minimum Tc = 10.0 min
Subcatchment 19S: Study Area Road Undetained (Perv)
Hydrograph
Image
Image
2026-02 Existing and ProposedNOAA 24-hr D100-Year-CurrentRainfall=9.48″
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640© 2025 HydroCAD Software Solutions LLCPage 104
## Summary for Pond 21P: Basin A Routing (StormBrixx)
Inflow Area =0.740 ac, 97.30% Impervious, Inflow Depth = 9.04" for 100-Year-Current event
Inflow =4.30 cfs @ 12.19 hrs, Volume= 0.557 af
Outflow =1.33 cfs @ 12.73 hrs, Volume= 0.557 af, Atten= 69%, Lag= 32.5 min
Discarded =0.71 cfs @ 12.73 hrs, Volume= 0.505 af
Primary =0.62 cfs @ 12.73 hrs, Volume= 0.052 af
Routed to Link 14L: Study Area West (Total)
Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 119.50' @ 12.73 hrs Surf.Area= 3,001 sf Storage= 5,809 cf Plug-Flow detention time=37.4 min calculated for 0.557 af (100% of inflow) Center-of-Mass det. time=37.3 min (788.0 - 750.6)
VolumeInvertAvail.StorageStorage Description
#1A117.50'0 cf31.63'W x 94.88'L x 3.00'H Field A
#2A117.50'8,729 cf8,999 cf Overall - 8,999 cf Embedded = 0 cf x 40.0% Voids\nACO StormBrixx SD 1 x 384 Inside #1\nInside = 23.7"W x 36.0"H => 5.75 sf x 3.95'L = 22.7 cf\nOutside = 23.7"W x 36.0"H => 5.93 sf x 3.95'L = 23.4 cf\n384 Chambers in 16 Rows
8,729 cf Total Available Storage
Storage Group A created with Chamber Wizard
DeviceRoutingInvertOutlet Devices
#1Primary117.50'15.0" Round Culvert\nL= 22.0' RCP, groove end projecting, Ke= 0.200\nInlet / Outlet Invert= 117.50' / 117.40' S= 0.0045'' Cc= 0.900\nn= 0.013, Flow Area= 1.23 sf
#2Device 1118.81'6.0'' Vert. Orifice C= 0.600 Limited to weir flow at low heads
#3Discarded117.50'10.000 in/hr Exfiltration over Surface area\nConductivity to Groundwater Elevation = -4.00'
Discarded OutFlow Max=0.71 cfs @ 12.73 hrs HW=119.49' (Free Discharge)\n—3=Exfiltration ( Controls 0.71 cfs)
Primary OutFlow Max=0.62 cfs @ 12.73 hrs HW=119.49' (Free Discharge)\n—1=Culvert (Passes 0.62 cfs of 6.91 cfs potential flow)\n—2=Orifice (Orifice Controls 0.62 cfs @ 3.17 fps)
===== PAGE 74 ===== ## Pond 21P: Basin A Routing (StormBrixx) - Chamber Wizard Field A Chamber Model = ACO StormBrixx SD 1 (ACO StormBrixx® SD) Inside = 23.7" W x 36.0" H => 5.75 sf x 3.95' L = 22.7 cf Outside = 23.7" W x 36.0" H => 5.93 sf x 3.95' L = 23.4 cf 24 Chambers/Row x 3.95' Long = 94.88' Row Length 16 Rows x 23.7" Wide = 31.63' Base Width 36.0" Chamber Height = 3.00' Field Height 384 Chambers x 22.7 cf = 8.728.7 cf Chamber Storage 384 Chambers x 23.4 cf = 8.998.6 cf Displacement Chamber Storage = 8,728.7 cf = 0.200 af Overall Storage Efficiency = 97.0% Overall System Size = 94.88' x 31.63' x 3.00' 384 Chambers 333.3 cy Field
Image
Pond 21P: Basin A Routing (StormBrixx)
Image
Inflow Outflow Discarded Primary 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ===== PAGE 75 ===== ## Summary for Link 5L: Ex Study Area West (Total)
Inflow Area =1.020 ac,8.82% Impervious, Inflow Depth = 2.49" for 100-Year-Current event
Inflow =1.51 cfs @12.21 hrs, Volume= 0.211 af
Primary =1.51 cfs @12.21 hrs, Volume= 0.211 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 5L: Ex Study Area West (Total)
Image
## Summary for Link 8L: Existing Study Area Road (Total)
Inflow Area =0.150 ac, 20.00% Impervious, Inflow Depth = 3.32" for 100-Year-Current event
Inflow =0.30 cfs @ 12.21 hrs, Volume= 0.041 af
Primary =0.30 cfs @ 12.21 hrs, Volume= 0.041 af, Atten= 0%, Laq= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 8L: Existing Study Area Road (Total)
Image
===== PAGE 76 ===== ## Summary for Link 10L: Study Area Study Area WQ MTD A-110 (Total) Inflow Area = 0.630 ac, 96.83% Impervious, Inflow Depth = 9.00" for 100-Year-Current event Inflow = 3.65 cfs @ 12.19 hrs, Volume = 0.473 af Primary = 3.65 cfs @ 12.19 hrs, Volume = 0.473 af, Atten = 0%, Lag = 0.0 min Fixed water surface Elevation= 117.75' Routed to Link 16L : Study Area Basin A (Total) Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 10L: Study Area Study Area WQ MTD A-110 (Total)
Image
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours)
Summary for Link 14L: Study Area West (Total)
Inflow Area = 1.050 ac, 68.57% Impervious, Inflow Depth = 1.14" for 100-Year-Current event
Inflow = 0.80 cfs @ 12.63 hrs, Volume= 0.099 af
Primary = 0.80 cfs @ 12.63 hrs, Volume= 0.099 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 14L: Study Area West (Total)
Image
===== PAGE 77 ===== ## Summary for Link 16L: Study Area Basin A (Total) Inflow Area = 0.740 ac, 97.30% Impervious, Inflow Depth = 9.04" for 100-Year-Current event Inflow = 4.30 cfs @ 12.19 hrs, Volume = 0.557 af Primary = 4.30 cfs @ 12.19 hrs, Volume = 0.557 af, Atten = 0%, Lag = 0.0 min Routed to Pond 21P: Basin A Routing (StormBrixx) Routed to Pond 21P : Basin A Routing (StormBrixx) Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 16L: Study Area Basin A (Total)
Image
## Summary for Link 18L: Study Area Road Undetained (Total)
Inflow Area =0.120 ac, 25.00% Impervious, Inflow Depth = 3.69" for 100-Year-Current event
Inflow =0.27 cfs @ 12.20 hrs, Volume= 0.037 af
Primary =0.27 cfs @ 12.20 hrs, Volume= 0.037 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 18L: Study Area Road Undetained (Total)
Image
===== PAGE 78 =====
Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment3S: Ex. Study Area WestRunoff Area=0.930 ac 0.00% Impervious Runoff Depth=2.87"
Flow Length=98' Tc=10.0 min CN=39 Runoff=1.73 cfs 0.222 af
Subcatchment4S: Ex. Study Area WestRunoff Area=0.090 ac 100.00% Impervious Runoff Depth=11.17"
Flow Length=248' Tc=10.0 min CN=98 Runoff=0.64 cfs 0.084 af
Subcatchment6S: Ex. Study Area RoadRunoff Area=0.030 ac 100.00% Impervious Runoff Depth=11.17"
Flow Length=82' Slope=0.0150 /" Tc=10.0 min CN=98 Runoff=0.21 cfs 0.028 af
Subcatchment7S: Ex. Study Area RoadRunoff Area=0.120 ac 0.00% Impervious Runoff Depth=2.87"
Flow Length=61' Slope=0.0100 /" Tc=10.0 min CN=39 Runoff=0.22 cfs 0.029 af
Subcatchment10S: Study Area WQ MTDRunoff Area=0.610 ac 100.00% Impervious Runoff Depth=11.17"
Flow Length=352' Tc=10.0 min CN=98 Runoff=4.37 cfs 0.568 af
Subcatchment11S: Study Area WQ MTDRunoff Area=0.020 ac 0.00% Impervious Runoff Depth=2.87"
Flow Length=351' Tc=10.0 min CN=39 Runoff=0.04 cfs 0.005 af
Subcatchment12S: Study Area RoadRunoff Area=0.030 ac 100.00% Impervious Runoff Depth=11.17"
Flow Length=35' Slope=0.0322 /" Tc=10.0 min CN=98 Runoff=0.21 cfs 0.028 af
Subcatchment14S: Study Area WestRunoff Area=0.310 ac 0.00% Impervious Runoff Depth=2.87"
Flow Length=48' Slope=0.0850 /" Tc=10.0 min CN=39 Runoff=0.58 cfs 0.074 af
Subcatchment15S: Study Area RoofRunoff Area=0.110 ac 100.00% Impervious Runoff Depth=11.17"
Flow Length=207' Slope=0.0100 /" Tc=10.0 min CN=98 Runoff=0.79 cfs 0.102 af
Subcatchment19S: Study Area RoadRunoff Area=0.090 ac 0.00% Impervious Runoff Depth=2.87"
Flow Length=58' Slope=0.0300 /" Tc=10.0 min CN=39 Runoff=0.17 cfs 0.022 af
Pond 21P: Basin A Routing (StormBrixx)Peak Elev=120.00' Storage=7,267 cf Inflow=5.20 cfs 0.675 af Discarded=0.71 cfs 0.572 af Primary=0.91 cfs 0.103 af Outflow=1.62 cfs 0.675 af
Link 5L: Ex Study Area West (Total)Inflow=2.37 cfs 0.306 af Primary=2.37 cfs 0.306 af
Link 8L: Existing Study Area Road (Total)Inflow=0.44 cfs 0.057 af Primary=0.44 cfs 0.057 af
Link 10L: Study Area Study Area WQ MTD A-110 (Total)Inflow=4.41 cfs 0.573 af Primary=4.41 cfs 0.573 af
Link 14L: Study Area West (Total)Inflow=1.22 cfs 0.177 af Primary=1.22 cfs 0.177 af
Link 16L: Study Area Basin A (Total)Inflow=5.20 cfs 0.675 af Primary=5.20 cfs 0.675 af
2026-02 Existing and ProposedNOAA 24-hr D 100-Year-Projected Rainfall=11.41"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledR 2025 HydroCAD Software Solutions LLCPage 114
Link 18L: Study Area Road Undetained (Total) Inflow=0.38 cfs 0.049 af Inflow=0.38 cfs 0.049 af Primary=0.38 cfs 0.049 af Total Runoff Area = 2.340 ac Runoff Volume = 1.161 af Average Runoff Depth = 5.95" 62.82% Pervious = 1.470 ac 37.18% Impervious = 0.870 ac ===== PAGE 79 ===== ### Summary for Subcatchment 3S: Ex. Study Area West (Perv) Runoff = 1.73 cfs @ 12.21 hrs, Volume= 0.222 af, Depth= 2.87" Routed to Link 5L : Ex Study Area West (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Projected Rainfall=11.41"
Area (ac)CNDescription
0.93039>75% Grass cover, Good, HSG A
0.93039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
8.4470.03500.09Sheet Flow, A-B\nWoods: Light underbrush n= 0.400 P2= 4.04"\nUsing McCuen-Spiess flow length
0.4510.02002.28Shallow Concentrated Flow, B-C\nUnpaved Kv= 16.1 fps
8.898Total, Increased to minimum Tc = 10.0 min
Subcatchment 3S: Ex. Study Area West (Perv)
Image
Image
2026-02 Existing and ProposedNOAA 24-hr D 100-Year-Projected Rainfall=11.41"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 116
### Summary for Subcatchment 4S: Ex. Study Area West (Imp) Runoff = 0.64 cfs @ 12.19 hrs, Volume= 0.084 af, Depth=11.17" Routed to Link 5L : Ex Study Area West (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Projected Rainfall=11.41"
Area (ac)CNDescription
0.04098Paved parking, HSG A
0.05098Roofs, HSG A
0.09098Weighted Average
0.09098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.91000.03001.82Sheet Flow, A-B\nSmooth surfaces n= 0.011 P2= 4.04"
1.11480.02002.28Shallow Concentrated Flow, B-C\nUnpaved Kv= 16.1 fps
2.0 248 Total, Increased to minimum Tc = 10.0 min
Subcatchment 4S: Ex. Study Area West (Imp)
Hydrograph
Image
===== PAGE 80 ===== ### Summary for Subcatchment 6S: Ex. Study Area Road (Imp) Runoff = 0.21 cfs @ 12.19 hrs, Volume= 0.028 af, Depth=11.17" Routed to Link 8L : Existing Study Area Road (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Projected Rainfall=11.41"
Area (ac)CNDescription
0.03098Paved parking, HSG A
0.03098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)
1.0820.01501.32Sheet Flow, A-B\nSmooth surfaces\nn = 0.011\nP2= 4.04"
1.0 82 Total, Increased to minimum Tc = 10.0 min
Subcatchment 6S: Ex. Study Area Road (Imp)
Image
2026-02 Existing and ProposedNOAA 24-hr D 100-Year-Projected Rainfall=11.41"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledR 2025HydroCAD Software Solutions LLC Page 118
### Summary for Subcatchment 7S: Ex. Study Area Road (Perv)
Runoff = 0.22 cfs @ 12.21 hrs, Volume= 0.029 af, Depth= 2.87"
Routed to Link 8L : Existing Study Area Road (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Projected Rainfall=11.41"
Area (ac)CNDescription
0.12039>75% Grass cover, Good, HSG A
0.12039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
1.0610.0100 1.06
Sheet Flow, A-B
Smooth surfaces
n= 0.011 P2= 4.04"
1.0 61 Total, Increased to minimum Tc = 10.0 min
Subcatchment 7S: Ex. Study Area Road (Perv)
Image
===== PAGE 81 ===== ## Summary for Subcatchment 10S: Study Area WQ MTD A-110 (Imp) Runoff = 4.37 cfs @ 12.19 hrs, Volume= 0.568 af, Depth=11.17" Routed to Link 10L : Study Area Study Area WQ MTD A-110 (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Projected Rainfall=11.41"
Area (ac)CNDescription
0.61098Paved parking, HSG A
0.61098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.6550.03021.62Sheet Flow, A-B\nSmooth surfaces n= 0.011 P2= 4.04"
1.32970.00353.684.52Pipe Channel, B-C\n15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31'\nn= 0.011 Concrete pipe, straight & clean
1.9 352 Total, Increased to minimum Tc = 10.0 min
Image
Subcatchment 10S: Study Area WQ MTD A-110 (Imp)
Image
## Summary for Subcatchment 11S: Study Area WQ MTD A-110 (Perv) Runoff = 0.04 cfs @ 12.21 hrs, Volume= 0.005 af, Depth= 2.87" Routed to Link 10L : Study Area Study Area WQ MTD A-110 (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Projected Rainfall=11.41"
Area (ac)CNDescription
0.02039>75% Grass cover, Good, HSG A
0.02039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
1.480.01250.10Sheet Flow, A-B\nGrass: Short n= 0.150 P2= 4.04"
0.2460.03803.96Shallow Concentrated Flow, B-C\nPaved Kv= 20.3 fps
1.32970.00353.684.52Pipe Channel, C-D\n15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31'\nn= 0.011 Concrete pipe, straight & clean
2.9 351 Total. Increased to minimum Tc = 10.0 min
Subcatchment 11S: Study Area WQ MTD A-110 (Perv)
Image
===== PAGE 82 ===== ## Summary for Subcatchment 12S: Study Area Road Undetained (Imp) Runoff = 0.21 cfs @ 12.19 hrs, Volume= 0.028 af, Depth=11.17" Routed to Link 18L : Study Area Road Undetained (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Projected Rainfall=11.41"
Area (ac)CNDescription
0.03098Paved parking, HSG A
0.03098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.4350.03221.52Sheet Flow, A-B\nSmooth surfaces n= 0.011 P2= 4.04"
0.4 35 Total, Increased to minimum Tc = 10.0 min
Subcatchment 12S: Study Area Road Undetained (Imp)
Image
2026-02 Existing and ProposedNOAA 24-hr D 100-Year-Projected Rainfall=11.41"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledR 2025 HydroCAD Software Solutions LLCPage 122
## Summary for Subcatchment 14S: Study Area West Undetained
Runoff = 0.58 cfs @ 12.21 hrs, Volume= 0.074 af, Depth= 2.87"
Routed to Link 14L : Study Area West (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs
NOAA 24-hr D 100-Year-Projected Rainfall=11.41"
Area (ac)CNDescription
0.31039>75% Grass cover, Good, HSG A
0.31039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
2.7480.0850 0.29 Sheet Flow, A-B Grass: Short n= 0.150 P2= 4.04"
3.748Total Increased to minimum Te = 10.0 min
2.7 48 Total, Increased to minimum Tc = 10.0 min
Subcatchment 14S: Study Area West Undetained
Image
===== PAGE 83 ===== ## Summary for Subcatchment 15S: Study Area Roof (Imp) Runoff = 0.79 cfs @ 12.19 hrs, Volume= 0.102 af, Depth=11.17" Routed to Link 16L : Study Area Basin A (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 100-Year-Projected Rainfall=11.41"
Area (ac)CNDescription
0.11098Roofs, HSG A
0.11098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)
0.82070.01004.501.57
0.8 207 Total, Increased to minimum Tc = 10.0 min
Subcatchment 15S: Study Area Roof (Imp)
Hydrograph
Image
Image
2026-02 Existing and ProposedNOAA 24-hr D 100-Year-Projected Rainfall=11.41"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledR 2025HydroCAD Software Solutions LLC Page 124
## Summary for Subcatchment 19S: Study Area Road Undetained (Perv)
Runoff = 0.17 cfs @ 12.21 hrs, Volume= 0.022 af, Depth= 2.87"
Routed to Link 18L : Study Area Road Undetained (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs
NOAA 24-hr D 100-Year-Projected Rainfall=11.41"
Area (ac)CNDescription
0.09039>75% Grass cover, Good, HSG A
0.09039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
4.8580.0300 0.20
Sheet Flow, A-B
Grass: Short n= 0.150 P2= 4.04"
4.8 58 Total, Increased to minimum Tc = 10.0 min
Subcatchment 19S: Study Area Road Undetained (Perv)
Runoff
Image
===== PAGE 84 ===== ## Summary for Pond 21P: Basin A Routing (StormBrixx)
Inflow Area = 0.740 ac, 97.30% Impervious, Inflow Depth = 10.94" for 100-Year-Projected event
Inflow = 5.20 cfs @ 12.19 hrs, Volume= 0.675 af
Outflow = 1.62 cfs @ 12.72 hrs, Volume= 0.675 af, Atten= 69%, Lag= 32.1 min
Discarded = 0.71 cfs @ 12.72 hrs, Volume= 0.572 af
Primary = 0.91 cfs @ 12.72 hrs, Volume= 0.103 af
Routed to Link 14L : Study Area West (Total)
Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs
Peak Elev= 120.00' @ 12.72 hrs Surf.Area= 3,001 sf Storage= 7,267 cf
Plug-Flow detention time= 40.1 min calculated for 0.675 af (100% of inflow)
Center-of-Mass det. time= 40.1 min ( 788.9 - 748.8 )
VolumeInvertAvail.StorageStorage Description
#1A117.50'0 cf31.63'W x 94.88'L x 3.00'H Field A
#2A117.50'8,729 cf8,999 cf Overall - 8,999 cf Embedded = 0 cf x 40.0% Voids ACO StormBrixx SD 1 x 384 Inside #1 Inside= 23.7"W x 36.0"H => 5.75 sf x 3.95'L = 22.7 cf Outside= 23.7"W x 36.0"H => 5.93 sf x 3.95'L = 23.4 cf 384 Chambers in 16 Rows
8,729 cf Total Available Storage
Storage Group A created with Chamber Wizard
DeviceRoutingInvertOutlet Devices
#1Primary117.50'15.0" Round Culvert L= 22.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 117.50'/ 117.40' S= 0.0045'/' Cc= 0.900 n= 0.013, Flow Area= 1.23 sf
#2Device 1118.81'6.0" Vert. Orifice C= 0.600 Limited to weir flow at low heads
#3Discarded117.50'10.000 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = -4.00'
Discarded OutFlow Max=0.71 cfs @ 12.72 hrs HW=119.99' (Free Discharge) —3=Exfiltration ( Controls 0.71 cfs)
Primary OutFlow Max=0.91 cfs @ 12.72 hrs HW=119.99' (Free Discharge) —1=Culvert (Passes 0.91 cfs of 8.73 cfs potential flow) —2=Orifice (Orifice Controls 0.91 cfs @ 4.66 fps)
## Pond 21P: Basin A Routing (StormBrixx) - Chamber Wizard Field A Chamber Model = ACO StormBrixx SD 1 (ACO StormBrixx SD) Inside = 23.7" W × 36.0" H => 5.75 sf × 3.95' L = 22.7 cf Outside = 23.7" W × 36.0" H => 5.93 sf × 3.95' L = 23.4 cf 24 Chambers/Row × 3.95' Long = 94.88' Row Length 16 Rows × 23.7" Wide = 31.63' Base Width 36.0" Chamber Height = 3.00' Field Height 384 Chambers × 22.7 cf = 8,728.7 cf Chamber Storage 384 Chambers × 23.4 cf = 8,998.6 cf Displacement Chamber Storage = 8,728.7 cf = 0.200 af Overall Storage Efficiency = 97.0% Overall System Size = 94.88' × 31.63' × 3.00' 384 Chambers 333.3 cy Field
Image
===== PAGE 85 =====
Pond 21P: Basin A Routing (StormBrixx)
Image
Summary for Link 5L: Ex Study Area West (Total)
Inflow Area =1.020 ac,8.82% Impervious, Inflow Depth = 3.60" for 100-Year-Projected event
Inflow =2.37 cfs @12.21 hrs, Volume= 0.306 af
Primary =2.37 cfs @12.21 hrs, Volume= 0.306 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 5L: Ex Study Area West (Total)
Hydrograph
Image
===== PAGE 86 ===== ## Summary for Link 8L: Existing Study Area Road (Total) Inflow Area = 0.150 ac, 20.00% Impervious, Inflow Depth = 4.53" for 100-Year-Projected event Inflow = 0.44 cfs @ 12.20 hrs, Volume = 0.057 af Primary = 0.44 cfs @ 12.20 hrs, Volume = 0.057 af, Atten = 0%, Lag = 0.0 min Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 8L: Existing Study Area Road (Total)
Image
## Summary for Link 10L: Study Area Study Area WQ MTD A-110 (Total)
Inflow Area =0.630 ac, 96.83% Impervious, Inflow Depth = 10.91" for 100-Year-Projected event
Inflow =4.41 cfs @ 12.19 hrs, Volume= 0.573 af
Primary =4.41 cfs @ 12.19 hrs, Volume= 0.573 af, Atten= 0%, Lag= 0.0 min
Routed to Link 16L : Study Area Basin A (Total)
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs Fixed water surface Elevation= 117.75'
Link 10L: Study Area Study Area WQ MTD A-110 (Total)
Image
===== PAGE 87 ===== ## Summary for Link 14L: Study Area West (Total)
Inflow Area =1.050 ac, 68.57% Impervious, Inflow Depth = 2.02" for 100-Year-Projected event
Inflow =1.22 cfs @ 12.55 hrs, Volume= 0.177 af
Primary =1.22 cfs @ 12.55 hrs, Volume= 0.177 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 14L: Study Area West (Total)
Image
## Summary for Link 16L: Study Area Basin A (Total) Inflow Area = 0.740 ac, 97.30% Impervious, Inflow Depth = 10.94" for 100-Year-Projected event Inflow = 5.20 cfs @ 12.19 hrs, Volume = 0.675 af Primary = 5.20 cfs @ 12.19 hrs, Volume = 0.675 af, Atten = 0%, Lag = 0.0 min Routed to Bond 21P: Basin A Routing (StormBrixx) Routed to Pond 21P : Basin A Routing (StormBrixx) Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 16L: Study Area Basin A (Total)
Hydrograph
Image
===== PAGE 88 ===== Summary for Link 18L: Study Area Road Undetained (Total) Inflow Area = 0.120 ac, 25.00% Impervious, Inflow Depth = 4.94" for 100-Year-Projected event Inflow = 0.38 cfs @ 12.20 hrs, Volume = 0.049 af Primary = 0.38 cfs @ 12.20 hrs, Volume = 0.049 af, Atten = 0%, Lag = 0.0 min Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 18L: Study Area Road Undetained (Total)
Image
===== PAGE 89 ===== HYDROGRAPH SUMMARY REPORTS – WATER QUALITY STORM ===== PAGE 90 =====
Image
Routing Diagram for 2026-02 Existing and Proposed Prepared by Dynamic Engineering, Printed 2/10/2026 HydroCAD® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLC ## Project Notes Rainfall events imported from "NJ-Rain.txt" for 6614 NJ Ocean-D Rainfall events imported from "NRCS-Rain.txt" for 6614 NJ Ocean-D Rainfall events imported from "NJ-Rain.txt" for 6614 NJ Ocean-D Rainfall events imported from "NJ-Rain.txt" for 6614 NJ Ocean-D Rainfall events imported from "NJ-Rain.txt" for 6614 NJ Ocean-D Defined 1 rainfall events from NJ-DEP IDF Defined 1 rainfall events from NJ-DEP IDF ===== PAGE 91 =====
026-02 Existing and Proposed
Prepared by Dynamic Engineering Printed 2/10/2026 hydroCAD\textregistered 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLC Page 3
Rainfall Events Listing (selected events)
2026-02 Existing and Proposed Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLCPage 3
Event#Event NameStorm TypeCurveModeDuration (hours)B/BDepth (inches)AMC
1WQNJ DEP 2-hrDefault2.0011.242
2026-02 Existing and Proposed
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 4
Area Listing (selected nodes)
Area (acres)CNDescription (subcatchment-numbers)
1.47039>75% Grass cover, Good, HSG A (3S, 7S, 11S, 14S, 19S)
0.71098Paved parking, HSG A (4S, 6S, 10S, 12S)
0.16098Roofs, HSG A (4S, 15S)
2.34061TOTAL AREA
===== PAGE 92 =====
2026-02 Existing and Proposed Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD ® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLC Page 52026-02 Existing and Proposed Prepared by Dynamic Engineering
HydroCAD ® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLC
Soil Listing (selected nodes)Ground Covers (selected nodes)
Area (acres)Soil GroupSubcatchment NumbersHSG-A (acres)HSG-B (acres)HSG-C (acres)HSG-D (acres)Other (acres)Total (acres)Ground CoverSubcatchment Numbers
2.340HSG A3S, 4S, 6S, 7S, 10S, 11S, 12S, 14S, 15S, 19S1.4700.0000.0000.0000.0001.470>75%Grass cover, Good
0.000HSG B3S, 7S, 11S,
0.000HSG C14S,
0.000HSG D19S
0.000Other4S, 6S,
2.340TOTAL AREA0.7100.0000.0000.0000.0000.710Paved parking10S, 12S
0.1600.0000.0000.0000.0000.160Roofs4S, 15S
2.3400.0000.0000.0000.0002.340TOTAL AREA
===== PAGE 93 =====
Pipe Listing (selected nodes)
Line#Node NumberIn-Invert (feet)Out-Invert (feet)Length (feet)Slope (ft/ft)nWidth (inches)Diam/Height (inches)Inside-Fill (inches)Node Name
110S0.000.00297.00.00350.0110.015.00.0
211S0.000.00297.00.00350.0110.015.00.0
315S0.000.00207.00.01000.0100.08.00.0
421P117.50117.4022.00.00450.0130.015.00.0
Time span=0.00-72.00 hrs, dt=0.03 hrs, 1441 points
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment3S: Ex. Study Area WestRunoff Area=0.930 ac 0.00% Impervious Runoff Depth=0.00" Flow Length=98' Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Subcatchment4S: Ex. Study Area WestRunoff Area=0.090 ac 100.00% Impervious Runoff Depth=1.02" Flow Length=248' Tc=10.0 min CN=98 Runoff=0.17 cfs 0.008 af
Subcatchment6S: Ex. Study Area RoadRunoff Area=0.030 ac 100.00% Impervious Runoff Depth=1.02" Flow Length=82' Slope=0.0150 1/'' Tc=10.0 min CN=98 Runoff=0.06 cfs 0.003 af
Subcatchment7S: Ex. Study Area RoadRunoff Area=0.120 ac 0.00% Impervious Runoff Depth=0.00" Flow Length=61' Slope=0.0100 1/'' Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Subcatchment10S: Study Area WQ MTDRunoff Area=0.610 ac 100.00% Impervious Runoff Depth=1.02" Flow Length=352' Tc=10.0 min CN=98 Runoff=1.12 cfs 0.052 af
Subcatchment11S: Study Area WQ MTDRunoff Area=0.020 ac 0.00% Impervious Runoff Depth=0.00" Flow Length=351' Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Subcatchment12S: Study Area RoadRunoff Area=0.030 ac 100.00% Impervious Runoff Depth=1.02" Flow Length=35' Slope=0.0322 1/'' Tc=10.0 min CN=98 Runoff=0.06 cfs 0.003 af
Subcatchment14S: Study Area WestRunoff Area=0.310 ac 0.00% Impervious Runoff Depth=0.00" Flow Length=48' Slope=0.0850 1/'' Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Subcatchment15S: Study Area Roof (Imp)Runoff Area=0.110 ac 100.00% Impervious Runoff Depth=1.02" Flow Length=207' Slope=0.0100 1/'' Tc=10.0 min CN=98 Runoff=0.20 cfs 0.009 af
Subcatchment19S: Study Area RoadRunoff Area=0.090 ac 0.00% Impervious Runoff Depth=0.00" Flow Length=58' Slope=0.0300 1/'' Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Pond 21P: Basin A Routing (StormBrixx) Discarded=0.70 cfsPeak Elev=117.70' Storage=580 cf Inflow=1.33 cfs 0.061 af 0.061 af Primary=0.00 cfs 0.000 af Outflow=0.70 cfs 0.061 af
Link 5L: Ex Study Area West (Total)Inflow=0.17 cfs 0.008 af Primary=0.17 cfs 0.008 af
Link 8L: Existing Study Area Road (Total)Inflow=0.06 cfs 0.003 af Primary=0.06 cfs 0.003 af
Link 10L: Study Area Study Area WQ MTD A-110 (Total)Inflow=1.12 cfs 0.052 af Primary=1.12 cfs 0.052 af
Link 14L: Study Area West (Total)Inflow=0.00 cfs 0.000 af Primary=0.00 cfs 0.000 af
Link 16L: Study Area Basin A (Total)Inflow=1.33 cfs 0.061 af Primary=1.33 cfs 0.061 af
===== PAGE 94 =====
2026-02 Existing and ProposedNJ DEP 2-hr WQ Rainfall=1.24"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLCPage 9
Link 18L: Study Area Road Undetained (Total)Inflow=0.06 cfs 0.003 af
Primary=0.06 cfs 0.003 af
Total Runoff Area = 2.340 ac Runoff Volume = 0.074 af Average Runoff Depth = 0.38"
62.82% Pervious = 1.470 ac 37.18% Impervious = 0.870 ac
2026-02 Existing and ProposedNJ DEP 2-hrWQ Rainfall=1.24"
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025HydroCAD Software Solutions LLCPage 10
### Summary for Subcatchment 3S: Ex. Study Area West (Perv) [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Routed to Link 5L : Ex Study Area West (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NJ DEP 2-hr WQ Rainfall=1.24"
Area (ac)CNDescription
0.93039>75% Grass cover, Good, HSG A
0.93039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
8.4470.03500.09Sheet Flow, A-B\nWoods: Light underbrush n= 0.400 P2= 4.04"\nUsing McCuen-Spiess flow length
0.4510.02002.28Shallow Concentrated Flow, B-C\nUnpaved Kv= 16.1 fps
8.8 98 Total. Increased to minimum Tc = 10.0 min
Subcatchment 3S: Ex. Study Area West (Perv)
Image
Runoff ===== PAGE 95 =====
2026-02 Existing and ProposedNJ DEP 2-hr WQ Rainfall=1.24"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD ® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLCPage 11
### Summary for Subcatchment 4S: Ex. Study Area West (Imp)
Runoff = 0.17 cfs @ 1.17 hrs, Volume= 0.008 af, Depth= 1.02" Routed to Link 5L : Ex Study Area West (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NJ DEP 2-hr WQ Rainfall=1.24"
Area (ac)CNDescription
0.04098Paved parking, HSG A
0.05098Roofs, HSG A
0.09098Weighted Average
0.09098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.91000.03001.82Sheet Flow, A-B
1.11480.02002.28Smooth surfaces\nn= 0.011 P2= 4.04"
Shallow Concentrated Flow, B-C
Unpaved Kv= 16.1 fps
2.0248TotalIncreased to minimumTc = 10.0 min
2.0 248 Total, Increased to minimum Tc = 10.0 min
Subcatchment 4S: Ex. Study Area West (Imp)
Image
2026-02 Existing and ProposedNJ DEP 2-hr WQ Rainfall=1.24"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 12
### Summary for Subcatchment 6S: Ex. Study Area Road (Imp)
Runoff = 0.06 cfs @ 1.17 hrs, Volume= 0.003 af, Depth= 1.02"
Routed to Link 8L : Existing Study Area Road (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NJ DEP 2-hr WQ Rainfall=1.24"
Area (ac)CNDescription
0.03098Paved parking, HSG A
0.03098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)
1.0820.01501.32
Sheet Flow, A-B
Smooth surfacesn= 0.011 P2= 4.04"
1.082Total. Increased to minimum
Subcatchment 6S: Ex. Study Area Road (Imp)
Runoff
Image
===== PAGE 96 ===== 2026-02 Existing and Proposed NJ DEP 2-hr WQ Rainfall=1.24" Prepared by Dynamic Engineering Printed 2/10/2026 HydroCAD® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLC Page 13 [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Routed to Link 8L : Existing Study Area Road (Total) ### Summary for Subcatchment 7S: Ex. Study Area Road (Perv) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NJ DEP 2-hr WQ Rainfall=1.24"
Area (ac)CNDescription
0.12039>75% Grass cover, Good, HSG A
0.12039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
1.0610.0100 1.06
Sheet Flow, A-B
Smooth surfacesn= 0.011 P2= 4.04"
1.0 61 Total, Increased to minimum Tc = 10.0 min
Image
Subcatchment 7S: Ex. Study Area Road (Perv)
2026-02 Existing and ProposedNJ DEP 2-hr WQ Rainfall=1.24"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 14
## Summary for Subcatchment 10S: Study Area WQ MTD A-110 (Imp)
Runoff = 1.12 cfs @ 1.17 hrs, Volume= 0.052 af, Depth= 1.02" Routed to Link 10L : Study Area Study Area WQ MTD A-110 (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NJ DEP 2-hr WQ Rainfall=1.24"
Area (ac)CNDescription
0.61098Paved parking, HSG A
0.61098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.6550.03021.62Sheet Flow, A-B\nSmooth surfaces n= 0.011 P2= 4.04"
1.32970.00353.684.52Pipe Channel, B-C\n15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31'\nn= 0.011 Concrete pipe, straight & clean
1.9 352 Total, Increased to minimum Tc = 10.0 min
Subcatchment 10S: Study Area WQ MTD A-110 (Imp)
Image
===== PAGE 97 ===== 2026-02 Existing and Proposed NJ DEP 2-hr WQ Rainfall=1.24" Prepared by Dynamic Engineering Printed 2/10/2026 HydroCAD® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLC Page 15 ## Summary for Subcatchment 11S: Study Area WQ MTD A-110 (Perv) [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Routed to Link 10L: Study Area Study Area WQ MTD A-110 (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NJ DEP 2-hr WQ Rainfall=1.24"
Area (ac)CNDescription
0.02039>75% Grass cover, Good, HSG A
0.02039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
1.480.01250.10Sheet Flow, A-B\nGrass: Short n= 0.150 P2= 4.04"
0.2460.03803.96Shallow Concentrated Flow, B-C\nPaved Kv= 20.3 fps
1.32970.00353.684.52Pipe Channel, C-D\n15.0" Round Area= 1.2 sf Perm= 3.9' r= 0.31'\nn= 0.011 Concrete pipe, straight & clean
2.9 351 Total, Increased to minimum Tc = 10.0 min
Subcatchment 11S: Study Area WQ MTD A-110 (Perv)
Image
2026-02 Existing and ProposedNJ DEP 2-hrWQ Rainfall=1.24"
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025HydroCAD Software Solutions LLCPage 16
## Summary for Subcatchment 12S: Study Area Road Undetained (Imp)
Runoff = 0.06 cfs @ 1.17 hrs, Volume= 0.003 af, Depth= 1.02"
Routed to Link 18L : Study Area Road Undetained (Total)
Runoff = 0.06 cfs @ 1.17 hrs, Volume= 0.003 af, Depth= 1.02"
Routed to Link 18L : Study Area Road Undetained (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NJ DEP 2-hr WQ Rainfall=1.24"
Image
===== PAGE 98 ===== 2026-02 Existing and Proposed NJ DEP 2-hr WQ Rainfall=1.24" Prepared by Dynamic Engineering Printed 2/10/2026 HydroCAD® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLC Page 17 [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Routed to Link 14L : Study Area West (Total) ## Summary for Subcatchment 14S: Study Area West Undetained Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NJ DEP 2-hr WQ Rainfall=1.24"
Area (ac)CNDescription
0.31039>75% Grass cover, Good, HSG A
0.31039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)
2.7480.08500.29Sheet Flow, A-B\nGrass: Short n= 0.150 P2= 4.04"
2.7 48 Total, Increased to minimum Tc = 10.0 min
Subcatchment 14S: Study Area West Undetained
Image
2026-02 Existing and ProposedNJ DEP 2-hrWQ Rainfall=1.24"
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025HydroCAD Software Solutions LLCPage 18
## Summary for Subcatchment 15S: Study Area Roof (Imp)
Runoff = 0.20 cfs @ 1.17 hrs, Volume= 0.009 af, Depth= 1.02" Routed to Link 16L : Study Area Basin A (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NJ DEP 2-hr WQ Rainfall=1.24"
Area (ac)CNDescription
0.11098Roofs, HSG A
0.11098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.82070.01004.501.57Pipe Channel, A-B\n8.0" Round Area= 0.3 sf Perm= 2.1' r= 0.17'\nn= 0.010 PVC, smooth interior
0.8 207 Total, Increased to minimum Tc = 10.0 min
Subcatchment 15S: Study Area Roof (Imp)
Image
===== PAGE 99 =====
2026-02 Existing and ProposedNJ DEP 2-hrWQ Rainfall=1.24"
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledR 2025HydroCAD Software Solutions LLCPage 19
## Summary for Subcatchment 19S: Study Area Road Undetained (Perv) [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Routed to Link 18L : Study Area Road Undetained (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NJ DEP 2-hr WQ Rainfall=1.24"
Area (ac)CNDescription
0.09039>75% Grass cover, Good, HSG A
0.09039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
4.8580.0300 0.20
Sheet Flow, A-B
Grass: Short n= 0.150 P2= 4.04"
4.858Total Increased to minimum Tc = 10.0 min
4.8 58 Total, Increased to minimum Tc = 10.0 min
Subcatchment 19S: Study Area Road Undetained (Perv)
Image
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours)
2026-02 Existing and ProposedNJ DEP 2-hrWQ Rainfall=1.24"
Prepared by Dynamic EngineeringPrinted2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 20
## Summary for Pond 21P: Basin A Routing (StormBrixx)
Inflow Area =0.740 ac, 97.30% Impervious, Inflow Depth = 1.00" for WQ event
Inflow =1.33 cfs @1.17 hrs, Volume=0.061 af
Outflow =0.70 cfs @1.43 hrs, Volume=0.061 af, Atten= 48%, Lag= 15.3 min
Discarded =0.70 cfs @1.43 hrs, Volume=0.061 af
Primary =0.00 cfs @0.00 hrs, Volume=0.000 af
Routed to Link 14L : Study Area West (Total)
Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 117.70' @ 1.43 hrs Surf.Area= 3,001 sf Storage= 580 cf Plug-Flow detention time=7.8 min calculated for 0.061 af (100% of inflow) Center-of-Mass det. time=7.8 min (87.9 - 80.1)
VolumeInvertAvail.StorageStorage Description
#1A117.50'0 cf31.63'W × 94.88'L × 3.00'H Field A
#2A117.50'8,729 cf8,999 cf Overall - 8,999 cf Embedded = 0 cf × 40.0% Voids\nACO StormBrixx SD 1 × 384 Inside #1\nInside= 23.7"W × 36.0"H => 5.75 sf × 3.95'L = 22.7 cf\nOutside= 23.7"W × 36.0"H => 5.93 sf × 3.95'L = 23.4 cf\n384 Chambers in 16 Rows
8,729 cf Total Available Storage
Storage Group A created with Chamber Wizard
DeviceRoutingInvertOutlet Devices
#1Primary117.50'15.0" Round Culvert\nL= 22.0' RCP, groove end projecting, Ke= 0.200\nInlet / Outlet Invert= 117.50' / 117.40' S= 0.0045'' Cc= 0.900\nn= 0.013, Flow Area= 1.23 sf
#2Device 1118.81'6.0'' Vert. Orifice C= 0.600 Limited to weir flow at low heads
#3Discarded117.50'10.000 in/hr Exfiltration over Surface area\nConductivity to Groundwater Elevation = -4.00'
Discarded OutFlow Max=0.70 cfs @ 1.43 hrs HW=117.70' (Free Discharge)\n—3=Exfiltration ( Controls 0.70 cfs)
Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=117.50' (Free Discharge)\n—1=Culvert ( Controls 0.00 cfs)\n—2=Orifice ( Controls 0.00 cfs)
===== PAGE 100 ===== ## Pond 21P: Basin A Routing (StormBrixx) - Chamber Wizard Field A Chamber Model = ACO StormBrixx SD 1 (ACO StormBrixx® SD) Inside = 23.7" W × 36.0" H => 5.75 sf × 3.95' L = 22.7 cf Outside = 23.7" W × 36.0" H => 5.93 sf × 3.95' L = 23.4 cf 24 Chambers/Row x 3.95' Long = 94.88' Row Length 16 Rows x 23.7" Wide = 31.63' Base Width 36.0" Chamber Height = 3.00' Field Height 384 Chambers x 22.7 cf = 8.728.7 cf Chamber Storage 384 Chambers x 23.4 cf = 8.998.6 cf Displacement Chamber Storage = 8,728.7 cf = 0.200 af Overall Storage Efficiency = 97.0% Overall System Size = 94.88' x 31.63' x 3.00' 384 Chambers 333.3 cy Field
Image
Pond 21P: Basin A Routing (StormBrixx)
Hydrograph
Image
Inflow Outflow Discarded Primary 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ===== PAGE 101 ===== ## Summary for Link 5L: Ex Study Area West (Total)
Inflow Area =1.020 ac,8.82% Impervious, Inflow Depth = 0.09" for WQ event
Inflow =0.17 cfs @1.17 hrs, Volume= 0.008 af
Primary =0.17 cfs @1.17 hrs, Volume= 0.008 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 5L: Ex Study Area West (Total)
Image
2026-02 Existing and ProposedNJ DEP 2-hr WQ Rainfall=1.2
Prepared by Dynamic EngineeringPrinted 2/10/202
HydroCAD\circledR 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLCPage 2
## Summary for Link 8L: Existing Study Area Road (Total)
Inflow Area =0.150 ac, 20.00% Impervious, Inflow Depth = 0.20" for WQ event
Inflow =0.06 cfs @1.17 hrs, Volume=0.003 af
Primary =0.06 cfs @1.17 hrs, Volume=0.003 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 8L: Existing Study Area Road (Total)
Image
===== PAGE 102 ===== ## Summary for Link 10L: Study Area Study Area WQ MTD A-110 (Total) Inflow Area = 0.630 ac, 96.83% Impervious, Inflow Depth = 0.99" for WQ event Inflow = 1.12 cfs @ 1.17 hrs, Volume = 0.052 af Primary = 1.12 cfs @ 1.17 hrs, Volume = 0.052 af, Atten = 0%, Lag = 0.0 min Routed to Link 16L : Study Area Basin A (Total) Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs Fixed water surface Elevation= 117.75'
Link 10L: Study Area Study Area WQ MTD A-110 (Total)
Image
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours)
2026-02 Existing and ProposedNJ DEP 2-hr WQ Rainfall=1.24"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\textregistered 10.20-8a s/n 08640\circledR 2025HydroCAD Software Solutions LLC
## Summary for Link 14L: Study Area West (Total)
Inflow Area =1.050 ac, 68.57% Impervious, Inflow Depth = 0.00" for WQ event
Inflow =0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary =0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 14L: Study Area West (Total)
Image
===== PAGE 103 ===== ## Summary for Link 16L: Study Area Basin A (Total)
Intlow Area =0.740 ac, 97.30% Impervious, Inflow Depth = 1.00" for WQ event
Inflow =1.33 cfs @ 1.17 hrs, Volume= 0.061 af
Primary =1.33 cfs @ 1.17 hrs, Volume= 0.061 af, Atten= 0%, Lag= 0.0 min
Routed to Pond 21P : Basin A Routing (StormBrixx)
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 16L: Study Area Basin A (Total)
Image
2026-02 Existing and ProposedNJ DEP 2-hr WQ Rainfall=1.24"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\textregistered 10.20-8a s/n 08640\circledR 2025Page 28
## Summary for Link 18L: Study Area Road Undetained (Total)
Inflow Area =0.120 ac, 25.00% Impervious, Inflow Depth = 0.26" for WQ event
Inflow =0.06 cfs @1.17 hrs, Volume=0.003 af
Primary =0.06 cfs @1.17 hrs, Volume=0.003 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 18L: Study Area Road Undetained (Total)
Image
===== PAGE 104 ===== HYDROGRAPH COMPARISON – STUDY AREA ROAD UNDETAINED 2, 10 & 100-YEAR ===== PAGE 105 =====
Primary Comparison
Image
===== PAGE 106 =====
Primary Comparison
Image
4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ===== PAGE 107 =====
Primary Comparison
Image
===== PAGE 108 =====
Primary Comparison
Image
Primary (cfs)
===== PAGE 109 =====
Primary Comparison
Image
===== PAGE 110 =====
Primary Comparison
Link 8L
Link 18L
Image
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Primary (cfs)
===== PAGE 111 ===== STORMWATER COLLECTION SYSTEM CALCULATIONS (PIPE SIZING) ===== PAGE 112 ===== ## Stormwater Collection System Calculations NOTES:
Project: Proposed Office Building Job #: 3342-99-007 Location: Jackson, NJ Design Storm: 25 yr NJDEPComputed By: NC Checked By: RTO Date: 2/13/2026 Last Revised:1) Design method used is Rational Method, unless otherwise noted. 2) Refer to Weighted Runoff Coefficient table for calculation of incremental areas and C values
Start Node INLET A-310 OCS A-100 INLET A-203 INLET A-220 INLET A-210 INLET A-200 INLET A-200 INLET A-210Stop Node MTD 15" FES INLET A-210 INLET A-210Upstream Inlet Area (acres) 0.10 (N/A) 0.10 0.10 0.10 0.10 0.10System Intensity (in/h) 7.045 8.020 7.700 7.700 7.507 7.143 7.365Upstream Inlet Tc (hours) 0.100 0.000 0.100 0.100 0.100Flow (cfs) 4.18 3.02 0.72 0.72 1.56 3.57 1.39Capacity (Full Flow) (cfs) 6.21 4.44 3.82 3.82 3.82Velocity (Out) (ft/s) 4.48 4.28 1.39 1.25 1.57 3.94 1.40Diameter (in) 18 15 15 15 15 15Section Type Circle Circle Concrete 0.013 0.013 0.013 0.013 0.013Material 0.013 0.013 0.013 0.013 0.013Manning's n 17 22 152 87 132 91 147Length (ft) 0.0035 0.0050 0.0035 0.0035 0.0035Slope (ft/ft) 118.37 117.50 119.73 119.45 119.15 118.69 118.69 119.20Start Invert (ft) 118.31 117.40 119.20 119.15 118.31 118.26 120.10 119.83 119.75 119.63 119.63HGL In (ft) 119.23 118.10 119.75 119.75 HGL Out (ft) 119.09 118.10 119.75 119.75
===== PAGE 113 ===== CONDUIT OUTLET PROTECTION CALCULATIONS ===== PAGE 114 ===== ## D DYNAMIC ENGINEERING ## Preformed Scour Hole Design
Project:Proposed Office Building
Job #:3342-99-007
Location:Jackson, NJ
Design Storm:25-Year
Computed By:NC
Checked By:
Date:2/10/2026
Discharge not in Basin, Therefore Tailwater is less than 0.5 x Do
Discharge Point IDPOI AREA WEST
Q (25-yr storm cfs)0.7
Inside Height of Outlet Culvert, Do (in)15
Inside Height of Outlet Culvert, Do (ft)1.3
Tailwater (ft), TW0.25
Bottom Length of Scour Hole, L1=3 Do (ft)3.75
Width of Culvert, Wo (in)15
Width of Culvert, Wo (ft)1.3
Bottom Width of Scour Hole, W1=2 Wo (ft)2.50
### When using Y = (.5)(Do):
Where Y = .5 Do, Y(ft)0.625
Median Stone Diameter*, D50 (ft)0.02
Overall Length of Scour Hole, L2 (ft)7.50
Overall Width of Scour Hole, W2 (ft)6.25
Use D50 equal to 6 inches ## When using Y = (D0):
Where Y = Do, Y(ft)1.250
Median Stone Diameter*, D50 (ft)0.02
Overall Length of Scour Hole, L2 (ft)11.25
Overall Width of Scour Hole, W2 (ft)10.00
Use D50 equal to 6 inches
Image
Equations used: Tw=0.2*Do (If Tw cannot be computed) Where Y=1/2 Do D50=(0.0125/Tw)*(q^1.33) Where Y=Do D50=(0.0082/Tw)*(q^1.33) ## Notes: ___ 1. The use of scour holes shall comply with county or local ordinances which would restrict the use of such devices due to the possible problems with mosquito breeding. 2. No bends or curves at the intersection of the conduit and apron or scour hole will be permitted. 3. There shall be no overfall from the end of the apron to the receiving material. 4. The thickness of the riprap lining, filter, and quality shall meet the requirements in the Riprap Standard Section of the Standards for Soil Erosion Control in New Jersey. 5. Use a D50 of 6 inches minimum. ===== PAGE 115 ===== ## GROUNDWATER RECHARGE CALCULATION ===== PAGE 116 ===== ## Pinelands Net Impervious 10 Year Infiltration Calculations Project: Job #: Location: Basin Name: Prop. StormBrixx
Image
NC
8/9/23
02/10/2026
Ex. 10 Yr Imp. Volume = 0.046 acre feet Prop. 10 Yr Imp. Volume = 0.366 acre feet Net Volume to be Infiltrated = 0.320 acre feet Volume below Lowest Orifice = 0.392 acre feet Result: Net 10 Year Increase is Infiltrated ===== PAGE 117 ===== ## GROUNDWATER MOUNDING CALCULATIONS ===== PAGE 118 =====
Input Values
10.00RRecharge rate (permeability rate) (in/hr) Specific yield, Sy (dimensionless)
0.150Sydefault value is 0.15; max value is 0.2 provided that a lab test data is submitted Horizontal hydraulic conductivity (in/hr)
50.00KhKh = 5xRecharge Rate (R) in the costal plan; Kh=R outside the coastal plan
47.500x1/2 length of basin (x direction, in feet)
16.000y1/2 width of basin (y direction, in feet)
6.74tDuration of infiltration period (hours)
10.00hi(0)Initial thickness of saturated zone (feet)
Image
Image
## Disclaimer This spreadsheet solving the Hantush (1967) equation for ground-water mounding beneath an infiltration basin is made available to the general public as a convenience for those wishing to replicate values documented in the USGS Scientific Investigations Report 2010-5102 "Groundwater mounding beneath hypothetical stormwater infiltration basins" or to calculate values based on user-specified site conditions. Any changes made to the spreadsheet (other than values identified as user-specified) after transmission from the USGS could have unintended, undesirable consequences. These consequences could include, but may not be limited to: erroneous output, numerical instabilities, and violations of underlying assumptions that are inherent in results presented in the accompanying USGS published report. The USGS assumes no responsibility for the consequences of any changes made to the spreadsheet. If changes are made to the spreadsheet, the user is responsible for documenting the changes and justifying the results and conclusions. ===== PAGE 119 ===== BASIN DRAIN TIME CALCULATIONS ===== PAGE 120 ===== ## Infiltration Basin Drain time Calculations
Project:Proposed Office BuildingComputed By:
Job #:3342-99-007Checked By:
Location:Jackson, NJDate:
Image
Revised:
NC
8/9/23
02/10/2026
Basin Name: Prop. StormBrixx
Effective Depth of Runoff to be Infiltrated = Volume of Runoff to be Infiltrated / Surface Area of Infiltration Area =7,267cubic feet
3,040square feet
2.39feet
20inches per hour
10inches per hour
Effective Depth of Runoff to be Infiltrated / Design Recharge Rate = Time to Empty Basin = 2.87 hours***Note : Factor of Safety of 2 is applied to the Field Tested Recharge Rate to establish the Design Recharge Rate**Note : Time to Empty Basin must be less than 72 hours. Therefore; Drain time is less than 72 Hours, therefore, design is acceptable ===== PAGE 121 ===== OFFSITE STABILITY FAILURE ANALYSIS ===== PAGE 122 ===== Study Area Roof (Imp)
Image
Study Area Study Area WQ MTD A-110 (Total) Study Area Basin A (Total) Basin A Routing (StormBrixx)
Image
Routing Diagram for 2026-02 Offsite Stability Prepared by Dynamic Engineering, Printed 2/10/2026 HydroCAD® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLC ## Project Notes Rainfall events imported from "NJ-Rain.txt" for 6614 NJ Ocean-D Rainfall events imported from "NRCS-Rain.txt" for 6614 NJ Ocean-D Rainfall events imported from "NJ-Rain.txt" for 6614 NJ Ocean-D Rainfall events imported from "NJ-Rain.txt" for 6614 NJ Ocean-D Rainfall events imported from "NJ-Rain.txt" for 6614 NJ Ocean-D Defined 1 rainfall events from NJ-DEP IDF Defined 1 rainfall events from NJ-DEP IDF Rainfall events imported from "NJ-Rain.txt" for 6614 NJ Ocean-D Rainfall events imported from "NJ-Rain.txt" for 6614 NJ Ocean-D ===== PAGE 123 =====
Rainfall Events Listing (selected events)
Event#Event NameStorm TypeCurveModeDuration (hours)B/BDepth (inches)AMCP2 (inches)
125-YearNOAA 24-hrDDefault24.0016.6824.04
2026-02 Offsite Stability
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\textregistered 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLCPage 4
Area Listing (selected nodes)
Area (acres)CNDescription (subcatchment-numbers)
0.02039>75% Grass cover, Good, HSG A (19S)
0.61098Paved parking, HSG A (18S)
0.11098Roofs, HSG A (16S)
0.74096TOTAL AREA
===== PAGE 124 =====
Area (acres)Soil GroupSubcatchment NumbersHSG-A (acres)HSG-B (acres)HSG-C (acres)HSG-D (acres)Other (acres)Total (acres)Ground CoverSubcatchment Numbers
0.740HSG A16S, 18S, 19S0.0200.0000.0000.0000.0000.020>75% Grass cover, Good19S
0.000HSG B0.6100.0000.0000.0000.0000.610Paved parking18S
0.000HSG C0.1100.0000.0000.0000.0000.110Roofs16S
0.000HSG D0.7400.0000.0000.0000.0000.740TOTAL AREA
0.000Other
0.740TOTAL AREA
Soil Listing (selected nodes)
Ground Covers (selected nodes)
===== PAGE 125 ===== 2026-02 Offsite Stability Prepared by Dynamic Engineering HydroCAD® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLC Printed 2/10/2026 Page 7
Pipe Listing (selected nodes)
Line#Node NumberIn-Invert (feet)Out-Invert (feet)Length (feet)Slope (ft/ft)nWidth (inches)Diam/Height (inches)Inside-Fill (inches)Node Name
116S0.000.00207.00.01000.0100.08.00.0
218S0.000.00297.00.00350.0110.015.00.0
319S0.000.00297.00.00350.0110.015.00.0
417P117.50117.4022.00.00450.0130.015.00.0
2026-02 Offsite Stability NOAA 24-nt D 25-Year Rainfall=0.68 , P2=4.04
Prepared by Dynamic Engineering Printed 2/10/2026
HydroCAD® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLC Page 8
Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment16S: Study Area Roof (Imp) Runoff Area=0.110 ac 100.00% Impervious Runoff Depth=6.44" Flow Length=207' Slope=0.0100 /" Tc=10.0 min CN=98 Runoff=0.46 cfs 0.059 af
Subcatchment18S: Study Area WQ MTD Runoff Area=0.610 ac 100.00% Impervious Runoff Depth=6.44" Flow Length=352' Tc=10.0 min CN=98 Runoff=2.55 cfs 0.327 af
Subcatchment19S: Study Area WQ MTD Runoff Area=0.020 ac 0.00% Impervious Runoff Depth=0.66" Flow Length=351' Tc=10.0 min CN=39 Runoff=0.00 cfs 0.001 af
Pond 17P: Basin A Routing (StormBrixx) Peak Elev=120.31' Storage=8,183 cf Inflow=3.02 cfs 0.388 af Outflow=1.06 cfs 0.300 af
Link 18L: Study Area Study Area WQ MTD A-110 (Total) Inflow=2.56 cfs 0.329 af Primary=2.56 cfs 0.329 af
Link 19L: Study Area Basin A (Total) Inflow=3.02 cfs 0.388 af Primary=3.02 cfs 0.388 af
Total Runoff Area = 0.740 ac Runoff Volume = 0.388 af Average Runoff Depth = 6.28
Total Runoff Area = 0.740 ac Runoff Volume = 0.388 af Average Runoff Depth = 6.28" 2.70% Pervious = 0.020 ac 97.30% Impervious = 0.720 ac ===== PAGE 126 ===== ## Summary for Subcatchment 16S: Study Area Roof (Imp) Runoff = 0.46 cfs @ 12.19 hrs, Volume= 0.059 af, Depth= 6.44" Routed to Link 191 : Study Area Basin A (Total) Routed to Link 19L : Study Area Basin A (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 25-Year Rainfall=6.68", P2=4.04"
Area (ac)CNDescription
0.11098Roofs, HSG A
0.11098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)
0.82070.01004.501.57\nPipe Channel, A-B\n8.0" Round Area= 0.3 sf Perim= 2.1' r= 0.17'\nn= 0.010 PVC, smooth interior
0.8 207 Total, Increased to minimum Tc = 10.0 min
Subcatchment 16S: Study Area Roof (Imp)
Image
2026-02 Offsite StabilityNOAA 24-hr D 25-Year Rainfall=6.68", P2=4.04"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD ® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLCPage 10
## Summary for Subcatchment 18S: Study Area WQ MTD A-110 (Imp)
Runoff = 2.55 cfs @ 12.19 hrs, Volume= 0.327 af, Depth= 6.44"
Routed to Link 18L : Study Area Study Area WQ MTD A-110 (Total)
Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs
NOAA 24-hr D 25-Year Rainfall=6.68", P2=4.04"
Area (ac)CNDescription
0.61098Paved parking, HSG A
0.61098100.00% Impervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
0.6550.03021.62Sheet Flow, A-B\nSmooth surfaces n= 0.011 P2= 4.04"
1.32970.00353.684.52Pipe Channel, B-C\n15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31'\nn= 0.011 Concrete pipe, straight & clean
1.9 352 Total, Increased to minimum Tc = 10.0 min
Subcatchment 18S: Study Area WQ MTD A-110 (Imp)
Hydrograph
Image
===== PAGE 127 ===== ## Summary for Subcatchment 19S: Study Area WQ MTD A-110 (Perv) Runoff = 0.00 cfs @ 12.38 hrs, Volume= 0.001 af, Depth= 0.66" Routed to Link 18L : Study Area Study Area WQ MTD A-110 (Total) Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 25-Year Rainfall=6.68", P2=4.04"
Area (ac)CNDescription
0.02039>75% Grass cover, Good, HSG A
0.02039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft)Velocity (ft/sec)Capacity (cfs)Description
1.480.01250.10Sheet Flow, A-B\nGrass: Short n= 0.150 P2= 4.04"
0.2460.03803.96Shallow Concentrated Flow, B-C\nPaved Kv= 20.3 fps
1.32970.00353.684.52Pipe Channel, C-D\n15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31'\nn= 0.011 Concrete pipe, straight & clean
2.9 351 Total, Increased to minimum Tc = 10.0 min
Image
Subcatchment 19S: Study Area WQ MTD A-110 (Perv)
2026-02 Offsite StabilityNOAA 24-hr D 25-Year Rainfall=6.68", P2=4.04"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD ® 10.20-8a s/n 08640 © 2025 HydroCAD Software Solutions LLCPage 12
## Summary for Pond 17P: Basin A Routing (StormBrixx)
Inflow Area =0.740 ac, 97.30% Impervious, Inflow Depth = 6.28" for 25-Year event
Inflow =3.02 cfs @ 12.19 hrs, Volume= 0.388 af
Outflow =1.06 cfs @ 12.67 hrs, Volume= 0.300 af, Atten= 65%, Lag= 29.0 min
Primary =1.06 cfs @ 12.67 hrs, Volume= 0.300 af
Routed to nonexistent node 14L
Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 120.31' @ 12.67 hrs Surf.Area= 3,001 sf Storage= 8,183 cf Plug-Flow detention time=244.3 min calculated for 0.300 af (77% of inflow) Center-of-Mass det. time=155.0 min (910.0 - 755.0)
VolumeInvertAvail.StorageStorage Description
#1A117.50'0 cf31.63'W × 94.88'L × 3.00'H Field A
#2A117.50'8,729 cf8,999 cf Overall - 8,999 cf Embedded = 0 cf × 40.0% Voids\nACO StormBrixx SD 1 × 384 Inside #1\nInside= 23.7"W × 36.0"H => 5.75 sf × 3.95'L = 22.7 cf\nOutside= 23.7"W × 36.0"H => 5.93 sf × 3.95'L = 23.4 cf\n384 Chambers in 16 Rows
8,729 cf Total Available Storage Storage Group A created with Chamber Wizard
DeviceRoutingInvertOutlet Devices
#1Primary117.50'15.0" Round Culvert\nL= 22.0' RCP, groove end projecting, Ke= 0.200\nInlet / Outlet Invert= 117.50' / 117.40' S= 0.0045'' Cc= 0.900\nn= 0.013, Flow Area= 1.23 sf
#2Device 1118.81'6.0" Vert. Orifice C= 0.600 Limited to weir flow at low heads
Primary OutFlow Max=1.06 cfs @ 12.67 hrs HW=120.31' (Free Discharge) 1=Culvert (Passes 1.06 cfs of 9.70 cfs potential flow) 2=Orifice (Orifice Controls 1.06 cfs @ 5.38 fps) ===== PAGE 128 ===== ## Pond 17P: Basin A Routing (StormBrixx) - Chamber Wizard Field A Chamber Model = ACO StormBrixx SD 1 (ACO StormBrixx® SD) Inside = 23.7" W x 36.0" H => 5.75 sf x 3.95' L = 22.7 cf Outside = 23.7" W x 36.0" H => 5.93 sf x 3.95' L = 23.4 cf 24 Chambers/Row x 3.95' Long = 94.88' Row Length 16 Rows x 23.7" Wide = 31.63' Base Width 36.0" Chamber Height = 3.00' Field Height 384 Chambers x 22.7 cf = 8.728.7 cf Chamber Storage 384 Chambers x 23.4 cf = 8.998.6 cf Displacement Chamber Storage = 8,728.7 cf = 0.200 af Overall Storage Efficiency = 97.0% Overall System Size = 94.88' x 31.63' x 3.00' 384 Chambers 333.3 cy Field
Image
Pond 17P: Basin A Routing (StormBrixx)
Image
===== PAGE 129 ===== ## Summary for Link 18L: Study Area Study Area WQ MTD A-110 (Total) Inflow Area = 0.630 ac, 96.83% Impervious, Inflow Depth = 6.26" for 25-Year event Inflow = 2.56 cfs @ 12.19 hrs, Volume = 0.329 af Primary = 2.56 cfs @ 12.19 hrs, Volume = 0.329 af, Atten = 0%, Lag = 0.0 min Routed to Link 191: Study Area Basin A (Total) Routed to Link 19L : Study Area Basin A (Total) Fixed water surface Elevation= 117.75'
Link 18L: Study Area Study Area WQ MTD A-110 (Total)
Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Image
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ## Summary for Link 19L: Study Area Basin A (Total) Inflow Area = 0.740 ac, 97.30% Impervious, Inflow Depth = 6.28" for 25-Year event Inflow = 3.02 cfs @ 12.19 hrs, Volume= 0.388 af Primary = 3.02 cfs @ 12.19 hrs, Volume= 0.388 af, Atten= 0%, Lag= 0.0 min Routed to Pond 17P : Basin A Routing (StormBrixx) Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs
Link 19L: Study Area Basin A (Total)
Hydrograph
Image
===== PAGE 130 ===== STORMWATER BASIN AREA INVESTIGATION REPORT, PREPARED BY DYNAMIC EARTH, LLC ===== PAGE 131 ===== ## DRAINAGE AREA MAPS ===== PAGE 132 =====
Image
STUDY AREA WEST IMPERVIOUS: 0.09 ACRES PERVIOUS: 0.93 ACRES ROOF: 0.05 ACRES MV SURFACE: 0.04 ACRES TOTAL: 1.02 ACRES TC PATH - STUDY AREA WEST PERVIOUS PATH A to B - Sheet Flow, 1.5% slope, 100 LF B to C - Shallow Concentrated Flow (Unpaved), 2.0% slope, 155 LF IMPERVIOUS PATH A to B - Sheet Flow, 2.25% slope, 100 LF B to C - Shallow Concentrated Flow (Unpaved), 2.0% slope, 148 LF DOWNER GRAVELLY SANDY LOAM, HSG A STUDY AREA ROAD IMPERVIOUS: 0.03 ACRES PERVIOUS: 0.12 ACRES MV SURFACE: 0.03 ACRES TOTAL: 0.15 ACRES TC PATH - STUDY AREA ROAD PERVIOUS PATH A to B - Sheet Flow, 1.5% slope, 82 LF IMPERVIOUS PATH A to B - Sheet Flow, 1.0% slope, 61 LF DOWNER GRAVELLY SANDY LOAM, HSG A
Image
Z GRAPHIC SCALE -20 0 10 20 40
THIS PLAN SET IS FOR PERMITTING PURPOSES ONLY AND MAY NOT BE USED FOR CONSTRUCTION
DRAWN BY:DESIGNED BY:CHECKED BY:CHECKED BY:
MFDMJPRTO-
PROJECT: 3 PROPOSED OFFICE BUILDING BLOCK 20901, LOT 15 30 SOUTH HOPE CHAPEL ROAD (C.R. 547) TOWNSHIP OF JACKSON, OCEAN COUNTY, NEW JERSEY3 02/12/26REV. PER TOWNSHIP, COUNTY & SCD COMMENTSCAM
2 07/10/25REV. PER PINELANDS COMMENTSRPK
1 04/18/25REV. PER PINELANDS COMMENTSYL
REV. DATE COMMENTSBY
Image
811 PROTECT YOURSELF ALL STATES REQUIRE NOTIFICATION OF EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN ANY STATE OR STATE SPECIFIC DIRECT PHONE NUMBERS VISWWW.CALL811.COM (IN FEET) INCH = 20 FT. ## DYNAMIC ENGINEERING LAND DEVELOPMENT CONSULTING • PERMITTING GEOTECHNICAL • ENVIRONMENTAL TRAFFIC • SURVEY • PLANNING & ZONING 5 Greentree Centre, Suite 406 Marlton, NJ 08053 T: 856.334.2000 | F: 732.974.3521 Offices conveniently located at: Lake Como, New Jersey • T: 732.974.0198 Chester, New Jersey • T: 908.879.9229 Marlton, New Jersey • T: 856.334.2000 Newark, New Jersey • T: 973.755.7200 Toms River, New Jersey • T: 732.687.0000 Newtown, Pennsylvania • T: 267.685.0276 Philadelphia, Pennsylvania • T: 215.253.4888 Bethlehem, Pennsylvania • T: 610.598.4400 Allen, Texas • T: 972.534.2100 Houston, Texas • T: 281.789.6400 Austin, Texas • T: 512.646.2646 Delray Beach, Florida • T: 561.921.8570 www.dynamicec.com ### RICHARD T. ORTIZ PROFESSIONAL ENGINEER NEW JERSEY LICENSE No. 60149 RODMAN R. RITCHIE PROFESSIONAL ENGINEER NEW JERSEY LICENSE No. 43547 EXISTING DRAINAGE AREA MAP SCALE: (H) 1"=20' (V) DATE/(08/11/2) PROJECT No: 3342-99-007
Image
1 OF 2 | Rev. #: 3 OF 2 3 ===== PAGE 133 =====
Image
Image
GRAPHIC SCALE PROFESSIONAL ENGINEER NEW JERSEY LICENSE No. 60149 (IN FEET) INCH = 20 FT. RODMAN R. RITCHIE PROFESSIONAL ENGINEER NEW JERSEY LICENSE No. 43547 TITLE: PROPOSED DRAINAGE AREA MAP SCALE: (H) 1" = 20' (V) DATE/(08/11/2023) PROJECT No: 3342-99-007 2 ===== PAGE 134 =====
Image
Image
GRAPHIC SCALE PROFESSIONAL ENGINEER NEW JERSEY LICENSE No. 60149 RODMAN R. RITCHIE PROFESSIONAL ENGINEER NEW JERSEY LICENSE No. 43547 INLET AREA MAP (IN FEET) INCH = 20 FT. ===== PAGE 135 ===== NITROGEN REMOVAL EXHIBIT ===== PAGE 136 =====
Image
Image
GRAPHIC SCALE
Image
☐ ☐ ☐ ☐ ☐ (IN FEET) INCH = 20 FT.
Image
THIS PLAN SET IS FOR PERMITTING PURPOSESONLY AND MAY NOT BE USED FOR CONSTRUCTIONCHECKED BY:RTOMJPPROJECT:1980 SWARTHMORE LLCPROPOSED OFFICE BUILDINGBLOCK 20901, LOT 1530 SOUTH HOPE CHAPEL ROAD (C.R. 547)TOWNSHIP OF JACKSON, OCEAN COUNTY, NEW JERSEY
DESIGNED BY:YLYLYLPROJECT:1980 SWARTHMORE LLCPROPOSED OFFICE BUILDINGBLOCK 20901, LOT 15TOWNSHIP OF JACKSON, OCEAN COUNTY, NEW JERSEY
DRAWN BY:811811811PROJECT:1980 SWARTHMORE LLCPROPOSED OFFICE BUILDINGPROPOSED OFFICE BUILDINGTOWNSHIP OF JACKSON, OCEAN COUNTY, NEW JERSEY
Knewh's below Call before you dg.811811811811PROJECT:1980 SWARTHMORE LLCPROPOSED OFFICE BUILDINGPROPOSED OFFICE BUILDING
FOR STATE SPECIFIC DIRECT PHONE NUMBERS VISIT: WWW.CALL811.COM
DYNAMIC ENGINEERING
LAND DEVELOPMENT CONSULTING • PERMITTING GEOTECHNICAL • ENVIRONMENTAL TRAFFIC • SURVEY • PLANNING & ZONING
5 Greentree Centre, Suite 406
Marlton, NJ 08053
T: 856.334.2000 | F: 732.974.3521
Offices conveniently located at:
Loke Corrio, New Jersey • T: 722.974.0178
Charlott, New Jersey • T: 908.879.9229
Newark, New Jersey • T: 856.334.2000
Tom's River, New Jersey • T: 973.755.7200
Newtown, Pennsylvania • T: 732.687.0000
Philadelphia, Pennsylvania • T: 267.685.00276
Bethlehem, Pennsylvania • T: 610.598.4400
Allen, Texas • T: 972.534.2100
Houshou, Texas • T: 281.109.6440
Austin, Texas • T: 512.646.2646
Delray Beach, Florida • T: 561.921.8570
www.dynamic.ice.com
RICHARD T. ORTIZ
PROFESSIONAL ENGINEER
NEW JERSEY LICENSE No. 60149
RODMAN R. RITCHIE
PROFESSIONAL ENGINEER
NEW JERSEY LICENSE No. 43547
TITLE:
NITROGEN
EXHIBIT
SCALE: (H) 1"=20" (V)DATE:
PROJECT No:10/11/2024
3342-99-007
SHEET No:Rev. #:
OF 1 3